The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Difference between revisions of "Sequence of Order"

From A Tale in the Desert
Jump to navigationJump to search
(New page: === Building Round: Sequence of Order === Cost of initial building (size 1): * 7 Dirt * 2 Steel Wire * 0 Cable * 0 Grey Star Marble * 0 [[Marble|Tiger's Eye Gran...)
 
 
(9 intermediate revisions by 3 users not shown)
Line 1: Line 1:
=== Building Round: [[Sequence of Order]] ===
+
{{Template:BuildingInfo|image=SequenceOfOrder.jpg|size=n/a|where=[[where::Small Construction Site]]|description=Used during the Test of the Covered Cartouche.}}
Cost of initial building (size 1):
+
 
* 7 [[Dirt]]
+
== Source==
* 2 [[Steel Wire]]
+
A decorative sculpture only buildable during an appropriate build round in [[Test of the Covered Cartouche]].
* 0 [[Cable]]
+
 
* 0 [[Marble|Grey Star Marble]]
+
== Cost ==
* 0 [[Marble|Tiger's Eye Granite]]
+
* 7 [[requires::Dirt]]
* 4 [[Paints|Maroon Paint]]
+
* 2 [[requires::Steel Wire]]
 +
* 0 [[requires::Cable]]
 +
* 0 [[requires::Marble|Grey Star Marble]]
 +
* 0 [[requires::Marble|Tiger's Eye Granite]]
 +
* 4 [[requires::Paints|Maroon Paint]]
 +
 
 +
Built in a [[requires::Small Construction Site]].
 +
 
 +
== Upgrading ==
 +
Once built, the Sequence of Order may be expanded. The costs from level 1 are:
 +
 
 +
{|  border="1"
 +
!Size!! Dirt !! Steel Wire !! Cable !! Grey Star Marble !! Tiger's Eye Granite !! Maroon Paint !! 3-output Gearbox
 +
|-
 +
| 20 || 8 || 3 ||   ||   ||   || 5 ||  
 +
|-
 +
| 40 || 24 || 9 || 1 || 1 ||   || 14 ||  
 +
|-
 +
| 60 || 55 || 21 || 3 || 2 ||   || 33 || 1
 +
|-
 +
| 80 || 118 || 45 || 7 || 5 || 1 || 71 || 1
 +
|-
 +
| 100 || 243 || 93 || 15 || 10 || 2 || 146 || 2
 +
|-
 +
| 120 || 493 || 188 || 30 || 20 || 4 || 296 || 2
 +
|-
 +
| 140 || 993 || 378 || 60 || 40 || 8 || 596 || 2
 +
|-
 +
| 160 || 1993 || 758 || 120 || 80 || 16 || 1196 || 3
 +
|}
 +
 
 +
 
 +
 
 +
[[Category:Buildings]]
 +
[[Category:Test of the Covered Cartouche Buildings]]

Latest revision as of 20:20, 16 December 2009

SequenceOfOrder.jpg
Size n/a
Where Small Construction Site




Source

A decorative sculpture only buildable during an appropriate build round in Test of the Covered Cartouche.

Cost

Built in a Small Construction Site.

Upgrading

Once built, the Sequence of Order may be expanded. The costs from level 1 are:

Size Dirt Steel Wire Cable Grey Star Marble Tiger's Eye Granite Maroon Paint 3-output Gearbox
20 8 3       5  
40 24 9 1 1   14  
60 55 21 3 2   33 1
80 118 45 7 5 1 71 1
100 243 93 15 10 2 146 2
120 493 188 30 20 4 296 2
140 993 378 60 40 8 596 2
160 1993 758 120 80 16 1196 3