The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Difference between revisions of "Guilds/SA Waterworks/PointsValues"

From A Tale in the Desert
Jump to navigationJump to search
Line 50: Line 50:
 
|2
 
|2
 
|-
 
|-
|[[Gravel]]  
+
|[[Concrete]]  
 
|10,000
 
|10,000
|1
+
|2
|-
 
|[[Cement]]
 
|600
 
|15
 
 
|-
 
|-
 
|[[Oyster Shell Marble]]
 
|[[Oyster Shell Marble]]

Revision as of 16:02, 30 April 2009

Materials that are currently required for the building of the pump

Mat Amount Required Points per Deben
Steel Wire for Tension Mechanism 600 0.50
Copper Wire for Winding Mechanism 600 0.25
Moon Steel for Waterproof Sheath 120 10
Cistern 1 10
White Raeli Tiles 50,000 2
Greenish Raeli Tiles 30,000 3
Yellowish Raeli Tiles 30,000 3
Pinkish Raeli Tiles 30,000 3
Black Raeli Tiles 50,000 2
Any color of Raeli Tiles 100,000 2
Rotproof, Rigid, Nontoxic Boards 50,000 2
Concrete 10,000 2
Oyster Shell Marble 100 75
Night Granite 100 100
Grey Star Marble 100 100


Cistern Upgrades

These are the costs for a 1 million size Cistern as per the T3 wiki.

Mat Amount Required Points per Deben
tar 1800 1
leather 2700 1
canvas 2250 5
cable 90 5


Pump Upgrade

Estimated pump upgrade costs based on the T3 wiki. Upgrade from 100 to 200:

Mat Amount Required Points per Deben
Brick 30,000 0.25
Concrete 1,500 2
cut_stone 502 1
Gearbox 20 50
Pipe Segment 10 10


20 Towers

Estimated cost for 20 towers, without upgrades based on the T3 wiki.

Mat Amount Required Points per Deben
Cistern 20 10
Copper_Pipe 100 4
tar 400 1
Black Raeli Tiles 4000 2
White Raeli Tiles 2000 2
Yellowish Raeli Tiles 1000 3
Redish Raeli Tiles 1000 3
Greenish Raeli Tiles 1000 3
Bluish Raeli Tiles 1000 3


Estimated Tower Upgrades

If needed, these are the estimated tower upgrade costs based on the T3 wiki.

Mat Amount Required Points per Deben
bricks 70000 0.25
Gravel 5,000 1
Cement 300 15
cut_stone 1500 2
Pipe Segment 111 10