The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
Difference between revisions of "Guilds/SA Waterworks/PointsValues"
From A Tale in the Desert
Jump to navigationJump to search(18 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
+ | '''This page is no longer used to reference points. These were the point values for Group A''' | ||
+ | |||
==== Materials that are currently required for the building of the pump ==== | ==== Materials that are currently required for the building of the pump ==== | ||
Line 4: | Line 6: | ||
! colspan="1"|Mat | ! colspan="1"|Mat | ||
! colspan="1"|Amount Required | ! colspan="1"|Amount Required | ||
− | ! colspan="1"|Points | + | ! colspan="1"|Points per Deben |
|- | |- | ||
|[[Steel Wire]] for Tension Mechanism | |[[Steel Wire]] for Tension Mechanism | ||
Line 14: | Line 16: | ||
|0.25 | |0.25 | ||
|- | |- | ||
− | |[[Moon Steel]] for Waterproof Sheath | + | |[[Moon Steel Sheeting]] for Waterproof Sheath |
|120 | |120 | ||
− | | | + | |80 |
|- | |- | ||
|[[Cistern]] | |[[Cistern]] | ||
|1 | |1 | ||
− | | | + | |10 |
|- | |- | ||
|White [[Raeli Tiles]] | |White [[Raeli Tiles]] | ||
Line 50: | Line 52: | ||
|2 | |2 | ||
|- | |- | ||
− | |[[ | + | |[[Concrete]] |
|10,000 | |10,000 | ||
− | | | + | |2 |
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|[[Oyster Shell Marble]] | |[[Oyster Shell Marble]] | ||
Line 79: | Line 77: | ||
! colspan="1"|Mat | ! colspan="1"|Mat | ||
! colspan="1"|Amount Required | ! colspan="1"|Amount Required | ||
− | ! colspan="1"|Points | + | ! colspan="1"|Points per Deben |
|- | |- | ||
|[[tar]] | |[[tar]] | ||
Line 104: | Line 102: | ||
====Pump Upgrade==== | ====Pump Upgrade==== | ||
Estimated pump upgrade costs based on the T3 wiki. | Estimated pump upgrade costs based on the T3 wiki. | ||
− | + | Upgrade from 100 to 200: | |
− | + | {| cellpadding="10" cellspacing="0" border="1" | |
+ | ! colspan="1"|Mat | ||
+ | ! colspan="1"|Amount Required | ||
+ | ! colspan="1"|Points per Deben | ||
+ | |- | ||
+ | |[[Brick]] | ||
+ | |30,000 | ||
+ | |0.25 | ||
+ | |- | ||
+ | |[[Concrete]] | ||
+ | |1,500 | ||
+ | |2 | ||
+ | |- | ||
+ | |[[cut_stone]] | ||
+ | |502 | ||
+ | |1 | ||
+ | |- | ||
+ | |[[Small_Gear]] | ||
+ | |200 | ||
+ | |10 | ||
+ | |- | ||
+ | |[[Medium_Gear]] | ||
+ | |120 | ||
+ | |70 | ||
+ | |- | ||
+ | |[[Large_Gear]] | ||
+ | |5 | ||
+ | |500 | ||
+ | |- | ||
+ | |[[Pipe Segment]] | ||
+ | |10 | ||
+ | |10 | ||
+ | |- | ||
+ | |} | ||
<p> | <p> | ||
<hr width=100%" size="2" align="center"> | <hr width=100%" size="2" align="center"> | ||
Line 115: | Line 146: | ||
! colspan="1"|Mat | ! colspan="1"|Mat | ||
! colspan="1"|Amount Required | ! colspan="1"|Amount Required | ||
− | ! colspan="1"|Points | + | ! colspan="1"|Points per Deben |
|- | |- | ||
|[[Cistern]] | |[[Cistern]] | ||
|20 | |20 | ||
− | | | + | |10 |
|- | |- | ||
|[[Copper_Pipe]] | |[[Copper_Pipe]] | ||
Line 164: | Line 195: | ||
! colspan="1"|Mat | ! colspan="1"|Mat | ||
! colspan="1"|Amount Required | ! colspan="1"|Amount Required | ||
− | ! colspan="1"|Points | + | ! colspan="1"|Points per Deben |
|- | |- | ||
|[[bricks]] | |[[bricks]] | ||
Line 170: | Line 201: | ||
|0.25 | |0.25 | ||
|- | |- | ||
− | |[[ | + | |[[Concrete]] |
|5,000 | |5,000 | ||
− | | | + | |2 |
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|[[cut_stone]] | |[[cut_stone]] | ||
|1500 | |1500 | ||
− | | | + | |1 |
|- | |- | ||
|[[Pipe Segment]] | |[[Pipe Segment]] | ||
− | | | + | |500 |
− | | | + | |10 |
+ | |- | ||
+ | |} | ||
+ | |||
+ | ====Extras==== | ||
+ | {| cellpadding="10" cellspacing="0" border="1" | ||
+ | ! colspan="1"|Mat | ||
+ | ! colspan="1"|Amount Required | ||
+ | ! colspan="1"|Points per Deben/Building | ||
+ | |- | ||
+ | |[[Small Warehouse]] | ||
+ | |25 | ||
+ | |290 | ||
+ | |- | ||
+ | |[[Barometer]] | ||
+ | |1 | ||
+ | |500 | ||
|- | |- | ||
|} | |} |
Latest revision as of 05:45, 3 June 2009
This page is no longer used to reference points. These were the point values for Group A
Materials that are currently required for the building of the pump
Mat | Amount Required | Points per Deben |
---|---|---|
Steel Wire for Tension Mechanism | 600 | 0.50 |
Copper Wire for Winding Mechanism | 600 | 0.25 |
Moon Steel Sheeting for Waterproof Sheath | 120 | 80 |
Cistern | 1 | 10 |
White Raeli Tiles | 50,000 | 2 |
Greenish Raeli Tiles | 30,000 | 3 |
Yellowish Raeli Tiles | 30,000 | 3 |
Pinkish Raeli Tiles | 30,000 | 3 |
Black Raeli Tiles | 50,000 | 2 |
Any color of Raeli Tiles | 100,000 | 2 |
Rotproof, Rigid, Nontoxic Boards | 50,000 | 2 |
Concrete | 10,000 | 2 |
Oyster Shell Marble | 100 | 75 |
Night Granite | 100 | 100 |
Grey Star Marble | 100 | 100 |
Cistern Upgrades
These are the costs for a 1 million size Cistern as per the T3 wiki.
Mat | Amount Required | Points per Deben |
---|---|---|
tar | 1800 | 1 |
leather | 2700 | 1 |
canvas | 2250 | 5 |
cable | 90 | 5 |
Pump Upgrade
Estimated pump upgrade costs based on the T3 wiki. Upgrade from 100 to 200:
Mat | Amount Required | Points per Deben |
---|---|---|
Brick | 30,000 | 0.25 |
Concrete | 1,500 | 2 |
cut_stone | 502 | 1 |
Small_Gear | 200 | 10 |
Medium_Gear | 120 | 70 |
Large_Gear | 5 | 500 |
Pipe Segment | 10 | 10 |
20 Towers
Estimated cost for 20 towers, without upgrades based on the T3 wiki.
Mat | Amount Required | Points per Deben |
---|---|---|
Cistern | 20 | 10 |
Copper_Pipe | 100 | 4 |
tar | 400 | 1 |
Black Raeli Tiles | 4000 | 2 |
White Raeli Tiles | 2000 | 2 |
Yellowish Raeli Tiles | 1000 | 3 |
Redish Raeli Tiles | 1000 | 3 |
Greenish Raeli Tiles | 1000 | 3 |
Bluish Raeli Tiles | 1000 | 3 |
Estimated Tower Upgrades
If needed, these are the estimated tower upgrade costs based on the T3 wiki.
Mat | Amount Required | Points per Deben |
---|---|---|
bricks | 70000 | 0.25 |
Concrete | 5,000 | 2 |
cut_stone | 1500 | 1 |
Pipe Segment | 500 | 10 |
Extras
Mat | Amount Required | Points per Deben/Building |
---|---|---|
Small Warehouse | 25 | 290 |
Barometer | 1 | 500 |