The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Difference between revisions of "User:Inkoaten/Survey"

From A Tale in the Desert
Jump to navigationJump to search
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
=== Survey ===
+
== Survey ==
  
See this OpenOffice spreadsheet for current survey data: [[Media:InkoatenAqueductSurvey.zip]]
+
== Harmony Ridge ==
  
=== Harmony Ridge route ===
+
* Original T3 route: http://www.atitd.org/wiki/tale3/Guilds/The_Eighth_Lake/Harmony_Ridge
 +
* T4 survey data: [[Media:InkoatenAqueductSurvey.zip]]
 +
* The actual route built by [[Guilds/SA Waterworks | SA Waterworks]] follows a similar route with higher tower density on the UHarm ridge
  
This is essentially the T3 route described on [http://www.atitd.org/wiki/tale3/Guilds/The_Eighth_Lake/Harmony_Ridge this page on the T3 wiki], re-surveyed for T4. I moved tower #11 to a slightly better spot.
+
== Northern Branch ==
  
Placing the first 20 towers along this route, and accounting for the minimum height needed to clear the ridge, we end up with the pump at height 351 and the last tower at height 54. The towers can later be raised to accommodate further expansion, but the bulk of the hard work is done at the start.
+
* Survey data: [[Media:InkoatenNorthernBranchSurvey.zip]]
 
+
* This route branches from the mainline at around tower 22 then heads north, through the sandbar west of the CS, and up the bank of the Nile to the UArt bridge.
(Warning: the below figures are highly speculative and don't match T3 numbers. Can't verify them until the pump is up. Chat me for an explanation)
 
 
 
Tower raising costs (raise towers by 1557 feet total):
 
 
 
{| border="1" cellspacing="0" cellpadding="10"
 
! Material !! T4 est !! T3 !! SAWW estimate
 
|-
 
| Bricks || 104,800 || 104,800 || 92,000
 
|-
 
| Concrete || 3,072 || 3,072 || 4,100<br>(includes tower construction costs?)
 
|-
 
| Cut Stone || 709 || 2,306 || 1,580
 
|-
 
| Pipe Segments || 93 || 107 || 130
 
|}
 
 
 
Pump raising costs (upgrade from height=100 to height=351)
 
 
 
{| border="1" cellspacing="0" cellpadding="10"
 
! Material !! T4 est !! T3 !! SAWW estimate
 
|-
 
| Bricks || 113,201 || 113,201 || 30,000
 
|-
 
| Concrete || 5,660 || 5,660 || 1,500
 
|-
 
| Cut Stone || 1,760 || 1,748 || 502
 
|-
 
| Pipe Segments || 25 || 25 || 10
 
|-
 
| Gearboxes || 50 || 50 || 20
 
|}
 
 
 
NB: gearboxes can be done 20 at a time?
 
 
 
See the survey spreadsheet above for derivation of this data.
 

Latest revision as of 23:28, 6 June 2009

Survey

Harmony Ridge

Northern Branch

  • Survey data: Media:InkoatenNorthernBranchSurvey.zip
  • This route branches from the mainline at around tower 22 then heads north, through the sandbar west of the CS, and up the bank of the Nile to the UArt bridge.