The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Difference between revisions of "User:Juspar/gearboxes"

From A Tale in the Desert
Jump to navigationJump to search
Line 69: Line 69:
 
*8 Medium
 
*8 Medium
 
*1 Large
 
*1 Large
 +
  
 
====D83-96; G288-292====
 
====D83-96; G288-292====
Line 183: Line 184:
 
* 9 Medium
 
* 9 Medium
 
* 0 Large
 
* 0 Large
 +
  
 
====C13-15; G302-350====
 
====C13-15; G302-350====
Line 236: Line 238:
 
* 7 Medium
 
* 7 Medium
 
* 0 Large
 
* 0 Large
 +
 +
 +
====A75-93; G455-514====
 +
'''Ratios'''
 +
{| border="1" cellpadding="2" cellspacing="2"
 +
|-
 +
! width="200" | A75-93
 +
! width="200" | G455-514
 +
|-
 +
|(3/5/7/4)||'''(5/3)*(5/3)*(5/3)'''
 +
|-
 +
|(3/5)*(3/5)*(6/5)*(4/7)||(7/5/3)*(6/5/3)
 +
|-
 +
|(5/3)*(5/6)*(4/7)||(6/5/3)*)6/5/3)*(6/5)
 +
|-
 +
|(4/7/5)||(5/3)*(5/3)*(7/4)
 +
|-
 +
|(6/5)*(6/5)*(4/7)||
 +
|-
 +
|'''(5/6)'''||
 +
|-
 +
|(3/5)*(7/5)||
 +
|-
 +
|(3/5)*(6/5)*(6/5)||
 +
|-
 +
|(3/5/6)*(7/4)||
 +
|-
 +
|(6/5)*(3/5/7/4)
 +
|}
 +
 +
'''Build'''
 +
{| border="1" cellpadding="3" cellspacing="3" width="500"
 +
|-
 +
!width="50"|
 +
!width="50"| A
 +
!width="50"| B
 +
!width="50"| C
 +
!width="50"| D
 +
!width="50"| E
 +
!width="50"| F
 +
!width="50"| G
 +
!width="50"| H
 +
|-
 +
|8|| 16||  ||  ||  ||  3||  ||  3||
 +
|-
 +
|7|| 35||  ||  ||  ||  || 53||  ||
 +
|-
 +
|6||  3||  ||  ||  ||153||  ||  ||
 +
|-
 +
|5||  3||  3||  3||315||  ||  ||  ||
 +
|-
 +
|4||  3||  ||  ||  ||  ||  ||  ||
 +
|-
 +
|3||  3||  ||  ||  ||  ||  ||  ||
 +
|-
 +
|2||  3||  ||  ||  ||  ||  ||  ||
 +
|-
 +
|1||  3||  ||  ||  ||  ||  ||  ||
 +
|}
 +
 +
'''Output'''
 +
 +
A83; E463; G463
 +
 +
'''Cost'''
 +
* 13 Small
 +
* 5 Medium
 +
* 0 Large
 +
  
 
====Template====
 
====Template====

Revision as of 01:34, 23 June 2009

Overview

The theory on gearboxes and how to design them was all well and good. Here's how I applied it.

My early builds are 2 output, I know I should be making 3 output just to make them more versatile. These aren't recommendations either, just records. I can already see that my first designs were not well optimised and I've only just begun.

Builds

B154-185; G346-370

Ratios

B159-185 G346-370
(5/3)*(5/3)*(4/7) (6/5/3)*(6/5)*(6/5)*(6/5)
(6/5/3)*(4/7/5) (5/3)*(5/3)*(5/7/4)
(5/3)*(5/3)*(5/6)*(5/6) (6/5/3)*(7/4)
(5/3) (5/3)*(5/3)*(4/7/5/3)
(6/5)*(7/5) (5/3)*(5*3)*(5*3)*(5/6)
(6/5)*(6/5)*(6/5)
(5/3)*(5/6)*(5/7/4)
(7/4)
(5/3)*(5/6)*(4/7/5/3)

Build

A B C D E F G H
8 116 4
7 4
6 165 65 4
5 4
4 513
3 135 7
2 45
1 4

Output

B161; G347;

Cost

  • 8 Small
  • 8 Medium
  • 1 Large


D83-96; G288-292

Ratios

D83-96 G288-292
(5/6) (6/5/3)*(6/5)*(6/5)
(3/5)*(7/5) (5/3)*(7/4)
(3/5)*(6/5)*(6/5)
(3/5/6)*(7/4)
(6/5)*(3/5/7/4)
(5/3)*(5/6)*(5/6)*(5/6)


Build

A B C D E F G H
8 5 5
7
6 615 615
5
4 156 136
3 43 15
2 44
1 4 34 3 3 36

Output

D86; G288;

Cost

  • 11 Small
  • 11 Medium
  • 0 Large


A127-145; E465-530

Ratios

A127-145 E465-530
(5/3)*(5/6) (7/5/3)*(6/5/3)
(6/5)*(6/5) (6/5/3)*(6/5/3)*(6/5)
(5/3)*(5/3)*(7/4)

Build

A B C D E F G H
8 3 3 3
7 3 315
6 3
5 35 316
4 3 3 36 55
3 56
2
1 6

Output

A144; E480; F480

Cost

  • 11 Small
  • 9 Medium
  • 0 Large


C13-15; G302-350

Ratios

C13-15 G302-350
(3/5)*(3/5)*(3/5)*(3/5) (5/3)*(5/3)*(5/3)*(5/6)*(5/6)
(3/5)*(3/5/6)*(3/5/6) (5/3)*(6/5/3)
(6/5/3)*(6/5)*(6/5)*(6/5)

Build

A B C D E F G H
8 5 113
7 315 115
6 153
5 53 135
4 3 3 3 3 35
3 34
2 14
1 14

Output

C13; G333

Cost

  • 14 Small
  • 7 Medium
  • 0 Large


A75-93; G455-514

Ratios

A75-93 G455-514
(3/5/7/4) (5/3)*(5/3)*(5/3)
(3/5)*(3/5)*(6/5)*(4/7) (7/5/3)*(6/5/3)
(5/3)*(5/6)*(4/7) (6/5/3)*)6/5/3)*(6/5)
(4/7/5) (5/3)*(5/3)*(7/4)
(6/5)*(6/5)*(4/7)
(5/6)
(3/5)*(7/5)
(3/5)*(6/5)*(6/5)
(3/5/6)*(7/4)
(6/5)*(3/5/7/4)

Build

A B C D E F G H
8 16 3 3
7 35 53
6 3 153
5 3 3 3 315
4 3
3 3
2 3
1 3

Output

A83; E463; G463

Cost

  • 13 Small
  • 5 Medium
  • 0 Large


Template

Ratios

Range 1 Range 2
( / )*( / ) ( / )*( / )

Build

A B C D E F G H
8
7
6
5
4
3
2
1

Output

;

Cost

  • Small
  • Medium
  • Large