The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
Difference between revisions of "Guilds/Adn Aquaduct Association"
m |
|||
Line 280: | Line 280: | ||
− | =TO RAISE PUMP TO 300'= | + | =TO RAISE PUMP TO 300'= |
− | 1 Gearbox B417-B500 G194-G235 | + | 1 Gearbox B417-B500 G194-G235 |
− | 1 Gearbox B437-B546 H370-H433 | + | 1 Gearbox B437-B546 H370-H433 |
− | 1 Gearbox C336-C396 F439-F544 | + | 1 Gearbox C336-C396 F439-F544 |
− | 1 Gearbox A370-A444 H310-H378 | + | 1 Gearbox A370-A444 H310-H378 |
− | 1 Gearbox A97-A117 G22-G28 | + | 1 Gearbox A97-A117 G22-G28 |
− | 1 Gearbox C218-C262 G429-G523 | + | 1 Gearbox C218-C262 G429-G523 |
− | 1 Gearbox A493-A592 G173-G209 | + | 1 Gearbox A493-A592 G173-G209 |
− | 1 Gearbox B349-B419 H167-H200 | + | 1 Gearbox B349-B419 H167-H200 |
− | 1 Gearbox C148-C173 F106-F123 | + | 1 Gearbox C148-C173 F106-F123 |
− | 1 Gearbox A280-A344 G344-G416 | + | 1 Gearbox A280-A344 G344-G416 |
− | 1 Gearbox C278-C325 G489-G562 | + | 1 Gearbox C278-C325 G489-G562 |
− | 1 Gearbox B408-B473 F21-F24 | + | 1 Gearbox B408-B473 F21-F24 |
− | 1 Gearbox B473-B553 G399-G483 | + | 1 Gearbox B473-B553 G399-G483 |
− | 1 Gearbox C141-C166 G493-G587 | + | 1 Gearbox C141-C166 G493-G587 |
− | 1 Gearbox B229-B279 G14-G17 | + | 1 Gearbox B229-B279 G14-G17 |
1 Gearbox A287-A342 G469-G582 <rb> | 1 Gearbox A287-A342 G469-G582 <rb> | ||
1 Gearbox C11-C13 H131-H155 <rb> | 1 Gearbox C11-C13 H131-H155 <rb> |
Revision as of 21:41, 6 July 2009
Adn Aqueduct Association
Guild created for the planning and development of an aqueduct system in Adn. Guild hall is located at 1037, 6892 in Adn.
This link will take you to [Test Of Life] where you can get more details about specific items.
- Pump Site Adn 871, 6373
- 13 Warehouse's Located at Pump Site (S of Pi Bridge)
Current needs:
- Boards, Gravel, Marble (and "time" to help people with marble), Time for group Stir. What colors you have available, please mark down.
Raeli Ovens/tiles
Current Colors available:
- Pinks (5 hilly)(1 Scratching Post)
- Blue (1 1/2 hilly)(1 Sesnut & Injeru )(4 1/2 Scratching Post)
- Green (2 hilly)(1/2 Scratching Post)
- Yellows (1/2 hilly)
- Other (5 hilly)(1 Kalmkitty & Mespho)(Injeru & Sesnut)(1 Spicy)(1 Scratching Post)
PUMP MATTS
Please add any matterials you commit yourself to work on for this project in the following table followed by your name. This will help us know what is and what is not being worked on. Thank you!
Please take in consideration that the tiles we need must have the name according to the requirement. For example for a "pinkish" tile Misty Rose dosen't work (even tho it seems pink to the eye), the name of the color MUST contain the word Pink to qualify.
AMT NEEDED | AMT ON HAND | PLEDGES |
600 Steel Wire for Tension Mechanism | 600 | DONE |
600 Copper Wire for Winding Mechanism | 600 | DONE |
120 Moon Steel "Sheeting" for Waterproof Sheath | 120 | DONE |
1 Cistern | 1 | DONE |
50,000 White Raeli Tiles | 50,000 | DONE |
30,000 Greenish Raeli Tiles | 30,000 | DONE |
30,000 Yellowish Raeli Tiles | 30,000 | DONE |
30,000 Pinkish Raeli Tiles | 30,000 | DONE |
50,000 Black Raeli Tiles | 50,000 | DONE |
100,000 Any color of Raeli Tiles | 100,000 | DONE |
50,000 Rotproof, Rigid, Nontoxic Boards | 50,000 | Done |
10,000 Concrete for Base | 10,500 | DONE |
100 Oyster Shell Marble | 100 | DONE |
100 Night Granite | 100 | DONE |
100 Grey Star Marble | 100 | DONE |
TOWER MATS
Towers are built in a similar way as pumps. The construction tool will note how far away from a suitable location you are. You must be within 8 feet of a suitable location in order to place a construction site. Once placed, the construction site still may not work if it's not placed close enough to a pump or a connecting tower (it will say this and not let you add materials).
- Working Mats Aka (extra it very much needed) 9 Pipe Segments, Bricks 21,496 onhand Gravel and Pipe Segments needed
AMT NEEDED EACH | AMT NEEDED FOR 10 | AMT ON HAND | PLEDGES |
1 Cistern | 10 | 1 | DONE |
5 Copper Pipe | 50 | 12 | DONE |
200 Black Raeli Tiles | 2000 | 6759 | DONE |
100 White Raeli Tiles | 1000 | 101 | DONE |
50 Yellowish Raeli Tiles | 500 | 850 | DONE |
50 Reddish Raeli Tiles | 500 | 3412 | DONE |
50 Greenish Raeli Tiles | 500 | 150 | DONE |
50 Blueish Raeli Tiles | 500 | 1500 | DONE |
100 Concrete | 1000 | 424 | DONE |
20 Tar | 200 | 1348 | DONE |
PROPOSED ROUTE
Coords | ID | Elevation | Owner | Bonus | |
871, 6373 | Pump | 0 | hilly | - | |
860, 6371 | 1 | 9'10" | Iy-Nefer | Focus | |
840, 6371 | 2 | 9'10" | jazmynn | Strength | |
820, 6371 | 3 | 9'10" | Injeru | Constitution | |
800, 6371 | 4 | 10'7" | Sesnut | Dexterity | |
789, 6353 | 5 | 1'6" | Mandy | Focus | |
769, 6353 | 6 | 1'6" | jaxum | Focus | |
749, 6353 | 7 | 1'6" | Khet | Speed | |
730, 6353 | 8 | 1'9" | Zog | Dexterity | |
710, 6353 | 9 | 2'9" | Yerbouti | Perception, Carrots | |
690, 6353 | 10 | 15'2" | inad | Dexterity, Peppers | |
670, 6353 | 11 | 30'9" | Alciphron | Dex |
Warning: Default sort key "Adn Aquaduct Association" overrides earlier default sort key "Adn_Aquaduct_Association".
CISTERN UPGRADES
Each tower uses 1440 water per day, so a non-upgraded pump cistern (100,000 capacity) would have to be filled twice a week to fill a 20-tower aqueduct line. Upgrading the cistern to 200,000 would mean filling it once a week, to 400,000 twice a month, etc. Each pumping session would take longer of course, but we would have to do it less often. A 60-tower line to CCR with a capacity 1,000,000 cistern would have to be pumped once every ten days or so.
Mats required to upgrade to:
CAPACITY | TAR | LEATHER | CANVAS | CABLE |
300,00 | Done | Done | Done | Done |
400,00 | Done | Done | Done | Done |
500,000? | 800 | 1,200 | 1,000 | 40 |
1,000,000 | 9,000 | 13,500 | 11,250 | 450 |
Amount on hand | 708 | 1205 | 0 | 338 (the rest hilly) |
=TO RAISE PUMP TO 300'=
1 Gearbox B417-B500 G194-G235 1 Gearbox B437-B546 H370-H433 1 Gearbox C336-C396 F439-F544 1 Gearbox A370-A444 H310-H378 1 Gearbox A97-A117 G22-G28 1 Gearbox C218-C262 G429-G523 1 Gearbox A493-A592 G173-G209 1 Gearbox B349-B419 H167-H200 1 Gearbox C148-C173 F106-F123 1 Gearbox A280-A344 G344-G416 1 Gearbox C278-C325 G489-G562 1 Gearbox B408-B473 F21-F24 1 Gearbox B473-B553 G399-G483 1 Gearbox C141-C166 G493-G587 1 Gearbox B229-B279 G14-G17 1 Gearbox A287-A342 G469-G5821 Gearbox C11-C13 H131-H155 1 Gearbox C95-C110 F106-F131 1 Gearbox C57-C71 H281-H334 1 Gearbox C87-C106 G490-G613 50000 Bricks 2500 Concrete 767 Cut Stone 10 Pipe Segment