The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
Difference between revisions of "Guilds/Adn Aquaduct Association"
Line 36: | Line 36: | ||
|- | |- | ||
|[[Guilds/Adn_Aquaduct_Association/GB01|Gearbox B156-B193 H66-H80]] | |[[Guilds/Adn_Aquaduct_Association/GB01|Gearbox B156-B193 H66-H80]] | ||
− | |11 | + | |4 |
− | + | |11 | |
+ | |||
|- | |- | ||
|Gearbox A161-A190 G177-G214 | |Gearbox A161-A190 G177-G214 | ||
− | |12 | + | |3 |
+ | |12 | ||
+ | |||
|- | |- | ||
|Gearbox B241-B292 G496-G610 | |Gearbox B241-B292 G496-G610 |
Revision as of 15:11, 5 September 2009
Adn Aqueduct Association
Guild created for the planning and development of an aqueduct system in Adn. With our partners from the Scratching Post, we aim to bring the life-giving waters of the Nile to Cat's Claw Ridge in an ambitious construction project! Guild hall is located at 1037, 6892 in Adn.
This link will take you to [Test Of Life] where you can get more details about specific items.
- 5 Upgraded Brick machines 789 6297 please Load when your near(straw welcome)
- Pump Site Adn 871, 6373
- 8 Warehouses Located at Pump Site (S of Pi Bridge on the West Bank of the Nile)
- 2 Warehouses for tower mats located mid-line at 291, 6340 (Second Storage, aka tiles and tower 10X)
Current needs:
- Our Pump is up! We are now seeking to raise it and assemble materials to raise towers and construct new ones.
- Gravel, cement, and/or concrete, Cut Stones
- Additional raeli tiles for additional towers.
- Gearboxes for pump raising.
- Pipe segments and cisterns. (Cisterns more so)
PUMP MATTS
Please add any matterials you commit yourself to work on for this project in the following table followed by your name. This will help us know what is and what is not being worked on. Thank you!
- 500 Feet
Mediums | Smalls | |
Gearbox B156-B193 H66-H80 | 4 | 11 |
Gearbox A161-A190 G177-G214 | 3 | 12 |
Gearbox B241-B292 G496-G610 | 13 Small 4 Medium | |
Gearbox B339-B424 F184-F221 | 9 Small 4 Medium | |
Gearbox B80-B92 G182-G213 | ||
Gearbox A470-A555 F55-F68 | ||
Gearbox B262-B317 F495-F599 | ||
Gearbox B133-B154 G155-G180 | ||
Gearbox C484-C595 H138-H159 | ||
Gearbox A294-A362 F440-F532 | ||
Gearbox B154-B177 F25-F31 | ||
Gearbox C494-C593 H469-H572 | ||
Gearbox B74-B87 H449-H521 | ||
Gearbox C225-C263 F479-F565 | ||
Gearbox B57-B68 G157-G184 | ||
Gearbox A94-A118 F204-F249 | ||
Gearbox C34-C43 F55-F68 | ||
Gearbox B312-B390 G85-G99 | ||
Gearbox B365-B420 F144-F174 | ||
Gearbox A327-A405 G449-G552 |
90000 Bricks
4500 Concrete
1300 Cut Stone
10 Pipe Segment
( 1 Large Gear, 17 Medium Gear, 6 Small Gear )
Spring Box: A50-A62 D132- D160 G380-G471, q9075 spring in hand DONE, gives about 3x per pull
TOWER MATS
Towers are built in a similar way as pumps. The construction tool will note how far away from a suitable location you are. You must be within 8 feet of a suitable location in order to place a construction site. Once placed, the construction site still may not work if it's not placed close enough to a pump or a connecting tower (it will say this and not let you add materials).
- Aug 7/09 update
AMT NEEDED EACH | AMT NEEDED FOR 10 | AMT ON HAND AT SECOND STORAGE | PLEDGES |
1 Cistern | 10 | 22 | |
5 Copper Pipe | 50 | 139 | |
200 Black Raeli Tiles | 2000 | 1,759 | |
100 White Raeli Tiles | 1000 | 2,833 | |
50 Yellowish Raeli Tiles | 500 | 1,250 | |
50 Reddish Raeli Tiles | 500 | 4,112 | |
50 Greenish Raeli Tiles | 500 | 250 | |
50 Blueish Raeli Tiles | 500 | 250 | |
100 Concrete | 1,000 | 2,187 | |
20 Tar | 200 | 400 |
- Aug 7/09 update
AMT NEEDED EACH | AMT ON HAND AT PUMP |
1 Cistern | |
5 Copper Pipe | |
200 Black Raeli Tiles | |
100 White Raeli Tiles | |
50 Yellowish Raeli Tiles | |
50 Reddish Raeli Tiles | |
50 Greenish Raeli Tiles | |
50 Blueish Raeli Tiles | |
100 Concrete | |
20 Tar | 1,656 |
TOWER MATS Upgrades
Material that on hand that can be used. 4 Sledge Hammers 439 Medium stones, 1520 Gravel,
- Aug 7/09 Update
- ok Towers are 7.5k Bricks, 300 concrete, 225 cut stones, 3 pipes, To Raise 150 (each){ First 13 tower are raised full }
What is Needed | AMT ON HAND | Second Storage |
Bricks | 1,328 | 4,751 (1.5k Brick machines) |
Cut Stone | 0 | 1,910 |
Concrete | 0 | 2,187 |
Pipe Segments | 30 | 87 |
PROPOSED ROUTE
Coords | ID | Elevation | Owner | Bonus | |
871, 6373 | Pump | 0 | hilly | - | |
860, 6371 | 1 | 9'10" | Iy-Nefer | Focus | |
840, 6371 | 2 | 9'10" | jazmynn | Strength | |
820, 6371 | 3 | 9'10" | Injeru | Constitution | |
800, 6371 | 4 | 10'7" | Sesnut | Dexterity | |
789, 6353 | 5 | 1'6" | Mandy | Focus | |
769, 6353 | 6 | 1'6" | jaxum | Focus | |
749, 6353 | 7 | 1'6" | Khet | Speed | |
730, 6353 | 8 | 1'9" | Zog | Dexterity | |
710, 6353 | 9 | 2'9" | Yerbouti | Perception, Carrots | |
690, 6353 | 10 | 15'2" | inad | Dexterity, Peppers | |
670, 6353 | 11 | 30'9" | Alciphron | Dexterity | |
660, 6336 | 12 | 54'1" | Spicy | Dexterity | |
640, 6336 | 13 | 2'8" | hill | Strength | |
620, 6336 | 14 | 2'11" | Almelkehdes | Focus | |
600, 6336 | 15 | 2'9" | Toldy | Perception | |
580, 6336 | 16 | 47'5" | ysabeau | Dexterity | |
560, 6336 | 17 | 92'6" | zing | Speed | |
540, 6336 | 18 | 19'5" | Yendorhut | Strength | |
520, 6336 | 19 | 57'3" | Akmenotep | Strength | |
500, 6336 | 20 | 65'8" | Murtha | Endurance | |
480, 6336 | 21 | 13'6" | RatBoy | Constitution, 30 Leeks | |
460, 6336 | 22 | 45'2" | Djemba | Focus | |
440, 6336 | 23 | 4'2" | Lazybonz | Endurance | |
420, 6336 | 24 | 3'6" | Tamblack | Endurance | |
400, 6336 | 25 | 21'4" | Cyndi | Endurance | |
380, 6336 | 26 | 6'9" | Dionysius | Perception | |
360, 6336 | 27 | 23'6" | Binny | Speed, 24 Garlic | |
340, 6336 | 28 | 28'1" | Udjai | Focus | |
320, 6336 | 29 | 11'0" | TylerEdwin | Perception | |
300, 6336 | 30 | 9'10" | AlexisBelle | Strength | |
290, 6353 | 31 | 9'11" | lilac | Constitution | |
270, 6353 | 32 | 9'11" | emilyliz | Strength | |
260, 6370 | 33 | 9'11" | nebkhepure | Perception | |
240, 6370 | 34 | 9'10" | DustiTwister | Endurance, 24 Garlic | |
220, 6370 | 35 | 9'10" | Aphenro | Constitution | |
200, 6370 | 36 | 36'5" | Gronk | Endurance | |
190, 6388 | 37 | kuupid | Endurance | ||
170, 6388 | 38 | Teil | Perception | ||
150, 6388 | 39 | Theresia | Dexterity, 24 cabbage | ||
130, 6388 | 40 | 15'8" | Gaara-Du-Desert | Perception | |
110, 6388 | 41 | 9'11" | Kalmkitty | Perception | |
90, 6388 | 42 | 9'11" | Pharohmoan | Dexterity | |
70, 6388 | 43 | 14'9" | |||
50, 6388 | 44 | 27'11" | |||
30, 6388 | 45 | 21'5" | |||
10, 6388 | 46 | 10'0" | |||
[-]10, 6388 | 47 | 10'0" | |||
[-]30, 6388 | 48 | 10'0" | |||
[-]50, 6388 | 49 | 19'1" | limit of 300' pump | ||
[-]70, 6388 | 50 | 61'10" | |||
[-]90, 6388 | 51 | 71'10" | |||
[-]110, 6388 | 52 | 78'8" | limit of 400' pump | ||
[-]120, 6405 | 53 | 187'9" | |||
[-]140, 6405 | 54 | 174'6" | |||
[-]160, 6405 | 55 | 66'6" | |||
[-]180, 6405 | 56 | 10'0" | |||
[-]190, 6422 | 57 | 10'0" | |||
[-]200, 6440 | 58 | 10'0" | |||
[-]210, 6457 | 59 | 10'0" | |||
[-]220, 6475 | 60 | 10'0" | |||
[-]230, 6492 | 61 | 18'4" | |||
[-]250, 6492 | 62 | 10'1" | |||
[-]270, 6492 | 63 | 10'1" | |||
[-]290, 6492 | 64 | ||||
[-]300, 6509 | 65 | 84'1" | |||
[-]310, 6526 | 66 | 196'10" | Khyber Pass, 526' pump needed | ||
[-]330, 6526 | 67 | 181'2" | |||
[-]340, 6544 | 68 | 130'3" | |||
[-]350, 6562 | 69 | 127'11" | |||
[-]360, 6579 | 70 | 35'11" | |||
[-]380, 6579 | 71 | 15'7" | |||
|
Warning: Default sort key "Adn Aquaduct Association" overrides earlier default sort key "Adn_Aquaduct_Association".
CISTERN UPGRADES
Each tower uses 1440 water per day, so a non-upgraded pump cistern (100,000 capacity) would have to be filled twice a week to fill a 20-tower aqueduct line. Upgrading the cistern to 200,000 would mean filling it once a week, to 400,000 twice a month, etc. Each pumping session would take longer of course, but we would have to do it less often. A 60-tower line to CCR with a capacity 1,000,000 cistern would have to be pumped once every ten days or so.
Mats required to upgrade to:
Update Aug 07/09CAPACITY | TAR | LEATHER | CANVAS | CABLE |
900,000 | Done | Done | Done | Done |
1,000,000 | Done | Done | Done | Done |
Amount on hand | 1,656 | 3,005 | 0 | 0 |