The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Difference between revisions of "Guilds/Adn Aquaduct Association"

From A Tale in the Desert
Jump to navigationJump to search
Line 66: Line 66:
 
|Gearbox B262-B317 F495-F599
 
|Gearbox B262-B317 F495-F599
 
|align="center"|4
 
|align="center"|4
|align="center"|10
+
|align="center"|9
  
 
|-
 
|-

Revision as of 16:08, 5 September 2009


Adn Aqueduct Association

Guild created for the planning and development of an aqueduct system in Adn. With our partners from the Scratching Post, we aim to bring the life-giving waters of the Nile to Cat's Claw Ridge in an ambitious construction project! Guild hall is located at 1037, 6892 in Adn.


This link will take you to [Test Of Life] where you can get more details about specific items.

  • 5 Upgraded Brick machines 789 6297 please Load when your near(straw welcome)
  • Pump Site Adn 871, 6373
  • 8 Warehouses Located at Pump Site (S of Pi Bridge on the West Bank of the Nile)
  • 2 Warehouses for tower mats located mid-line at 291, 6340 (Second Storage, aka tiles and tower 10X)

Current needs:

  • Our Pump is up! We are now seeking to raise it and assemble materials to raise towers and construct new ones.
  • Gravel, cement, and/or concrete, Cut Stones
  • Additional raeli tiles for additional towers.
  • Gearboxes for pump raising.
  • Pipe segments and cisterns. (Cisterns more so)

PUMP MATTS

Please add any matterials you commit yourself to work on for this project in the following table followed by your name. This will help us know what is and what is not being worked on. Thank you!

  • 500 Feet
  Medium Gears Small Gears
Gearbox B156-B193 H66-H80 4 11
Gearbox A161-A190 G177-G214 3 12
Gearbox B241-B292 G496-G610 4 13
Gearbox B339-B424 F184-F221 4 9
Gearbox B80-B92 G182-G213 4 10
Gearbox A470-A555 F55-F68 7 10
Gearbox B262-B317 F495-F599 4 9
Gearbox B133-B154 G155-G180    
Gearbox C484-C595 H138-H159    
Gearbox A294-A362 F440-F532    
Gearbox B154-B177 F25-F31    
Gearbox C494-C593 H469-H572    
Gearbox B74-B87 H449-H521    
Gearbox C225-C263 F479-F565    
Gearbox B57-B68 G157-G184    
Gearbox A94-A118 F204-F249    
Gearbox C34-C43 F55-F68    
Gearbox B312-B390 G85-G99    
Gearbox B365-B420 F144-F174    
Gearbox A327-A405 G449-G552    


90000 Bricks 4500 Concrete 1300 Cut Stone 10 Pipe Segment

( 1 Large Gear, 17 Medium Gear, 6 Small Gear )

Spring Box: A50-A62 D132- D160 G380-G471, q9075 spring in hand DONE, gives about 3x per pull

TOWER MATS

Towers are built in a similar way as pumps. The construction tool will note how far away from a suitable location you are. You must be within 8 feet of a suitable location in order to place a construction site. Once placed, the construction site still may not work if it's not placed close enough to a pump or a connecting tower (it will say this and not let you add materials).


  1. Aug 7/09 update
AMT NEEDED EACH AMT NEEDED FOR 10 AMT ON HAND AT SECOND STORAGE PLEDGES
1 Cistern 10 22
5 Copper Pipe 50 139
200 Black Raeli Tiles 2000 1,759
100 White Raeli Tiles 1000 2,833
50 Yellowish Raeli Tiles 500 1,250
50 Reddish Raeli Tiles 500 4,112
50 Greenish Raeli Tiles 500 250
50 Blueish Raeli Tiles 500 250
100 Concrete 1,000 2,187
20 Tar 200 400
  1. Aug 7/09 update
AMT NEEDED EACH AMT ON HAND AT PUMP
1 Cistern
5 Copper Pipe
200 Black Raeli Tiles
100 White Raeli Tiles
50 Yellowish Raeli Tiles
50 Reddish Raeli Tiles
50 Greenish Raeli Tiles
50 Blueish Raeli Tiles
100 Concrete
20 Tar 1,656

TOWER MATS Upgrades

Material that on hand that can be used. 4 Sledge Hammers 439 Medium stones, 1520 Gravel,

  1. Aug 7/09 Update
  • ok Towers are 7.5k Bricks, 300 concrete, 225 cut stones, 3 pipes, To Raise 150 (each){ First 13 tower are raised full }
What is Needed AMT ON HAND Second Storage
Bricks 1,328 4,751 (1.5k Brick machines)
Cut Stone 0 1,910
Concrete 0 2,187
Pipe Segments 30 87

PROPOSED ROUTE

Coords ID Elevation Owner Bonus
871, 6373 Pump 0 hilly -
860, 6371 1 9'10" Iy-Nefer Focus
840, 6371 2 9'10" jazmynn Strength
820, 6371 3 9'10" Injeru Constitution
800, 6371 4 10'7" Sesnut Dexterity
789, 6353 5 1'6" Mandy Focus
769, 6353 6 1'6" jaxum Focus
749, 6353 7 1'6" Khet Speed
730, 6353 8 1'9" Zog Dexterity
710, 6353 9 2'9" Yerbouti Perception, Carrots
690, 6353 10 15'2" inad Dexterity, Peppers
670, 6353 11 30'9" Alciphron Dexterity
660, 6336 12 54'1" Spicy Dexterity
640, 6336 13 2'8" hill Strength
620, 6336 14 2'11" Almelkehdes Focus
600, 6336 15 2'9" Toldy Perception
580, 6336 16 47'5" ysabeau Dexterity
560, 6336 17 92'6" zing Speed
540, 6336 18 19'5" Yendorhut Strength
520, 6336 19 57'3" Akmenotep Strength
500, 6336 20 65'8" Murtha Endurance
480, 6336 21 13'6" RatBoy Constitution, 30 Leeks
460, 6336 22 45'2" Djemba Focus
440, 6336 23 4'2" Lazybonz Endurance
420, 6336 24 3'6" Tamblack Endurance
400, 6336 25 21'4" Cyndi Endurance
380, 6336 26 6'9" Dionysius Perception
360, 6336 27 23'6" Binny Speed, 24 Garlic
340, 6336 28 28'1" Udjai Focus
320, 6336 29 11'0" TylerEdwin Perception
300, 6336 30 9'10" AlexisBelle Strength
290, 6353 31 9'11" lilac Constitution
270, 6353 32 9'11" emilyliz Strength
260, 6370 33 9'11" nebkhepure Perception
240, 6370 34 9'10" DustiTwister Endurance, 24 Garlic
220, 6370 35 9'10" Aphenro Constitution
200, 6370 36 36'5" Gronk Endurance
190, 6388 37 kuupid Endurance
170, 6388 38 Teil Perception
150, 6388 39 Theresia Dexterity, 24 cabbage
130, 6388 40 15'8" Gaara-Du-Desert Perception
110, 6388 41 9'11" Kalmkitty Perception
90, 6388 42 9'11" Pharohmoan Dexterity
70, 6388 43 14'9"
50, 6388 44 27'11"
30, 6388 45 21'5"
10, 6388 46 10'0"
[-]10, 6388 47 10'0"
[-]30, 6388 48 10'0"
[-]50, 6388 49 19'1" limit of 300' pump
[-]70, 6388 50 61'10"
[-]90, 6388 51 71'10"
[-]110, 6388 52 78'8" limit of 400' pump
[-]120, 6405 53 187'9"
[-]140, 6405 54 174'6"
[-]160, 6405 55 66'6"
[-]180, 6405 56 10'0"
[-]190, 6422 57 10'0"
[-]200, 6440 58 10'0"
[-]210, 6457 59 10'0"
[-]220, 6475 60 10'0"
[-]230, 6492 61 18'4"
[-]250, 6492 62 10'1"
[-]270, 6492 63 10'1"
[-]290, 6492 64
[-]300, 6509 65 84'1"
[-]310, 6526 66 196'10" Khyber Pass, 526' pump needed
[-]330, 6526 67 181'2"
[-]340, 6544 68 130'3"
[-]350, 6562 69 127'11"
[-]360, 6579 70 35'11"
[-]380, 6579 71 15'7"


Warning: Default sort key "Adn Aquaduct Association" overrides earlier default sort key "Adn_Aquaduct_Association".



CISTERN UPGRADES

Each tower uses 1440 water per day, so a non-upgraded pump cistern (100,000 capacity) would have to be filled twice a week to fill a 20-tower aqueduct line. Upgrading the cistern to 200,000 would mean filling it once a week, to 400,000 twice a month, etc. Each pumping session would take longer of course, but we would have to do it less often. A 60-tower line to CCR with a capacity 1,000,000 cistern would have to be pumped once every ten days or so.

Mats required to upgrade to:

Update Aug 07/09
CAPACITY TAR LEATHER CANVAS CABLE
900,000 Done Done Done Done
1,000,000 Done Done Done Done
Amount on hand 1,656 3,005 0 0