The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Difference between revisions of "Sequence of Order"

From A Tale in the Desert
Jump to navigationJump to search
(New page: === Building Round: Sequence of Order === Cost of initial building (size 1): * 7 Dirt * 2 Steel Wire * 0 Cable * 0 Grey Star Marble * 0 [[Marble|Tiger's Eye Gran...)
 
Line 1: Line 1:
=== Building Round: [[Sequence of Order]] ===
+
 
Cost of initial building (size 1):
+
{{Template:BuildingInfo|image=SequenceOfOrder.png|size=n/a|where=[[where::Small Construction Site]]|description=Used during the Test of the Covered Cartouche.}}
 +
 
 +
== Source==
 +
A decorative sculpture only buildable during an appropriate build round in [[Test of the Covered Cartouche]].
 +
 
 +
== Cost ==
 
* 7 [[Dirt]]
 
* 7 [[Dirt]]
 
* 2 [[Steel Wire]]
 
* 2 [[Steel Wire]]
Line 7: Line 12:
 
* 0 [[Marble|Tiger's Eye Granite]]
 
* 0 [[Marble|Tiger's Eye Granite]]
 
* 4 [[Paints|Maroon Paint]]
 
* 4 [[Paints|Maroon Paint]]
 +
 +
Built in a [[requires::Small Construction Site]].
 +
 +
== Upgrading ==
 +
Once built, the Point of Mind may be expanded. The costs from level 1 are:
 +
 +
{|  border="1"
 +
!Size!! Dirt !! Steel Wire !! Cable !! Grey Star Marble !! Tiger's Eye Granite !! Maroon Paint
 +
|-
 +
| 10 || || || || || || 
 +
|-
 +
| 10 || || || || || ||
 +
|-
 +
| 10 || || || || || ||
 +
|-
 +
| 10 || || || || || ||
 +
|-
 +
| 10 || || || || || ||
 +
|-
 +
| 10 || || || || || ||
 +
|-
 +
| 10 || || || || || ||
 +
|-
 +
| 10 || || || || || ||
 +
|-
 +
| 10 || || || || || ||
 +
|-
 +
| 10 || || || || || ||
 +
|-
 +
| 10 || || || || || ||
 +
|}
 +
 +
 +
[[Category:Buildings]]

Revision as of 10:15, 30 October 2009


File:SequenceOfOrder.png
Size n/a
Where Small Construction Site




Source

A decorative sculpture only buildable during an appropriate build round in Test of the Covered Cartouche.

Cost

Built in a Small Construction Site.

Upgrading

Once built, the Point of Mind may be expanded. The costs from level 1 are:

Size Dirt Steel Wire Cable Grey Star Marble Tiger's Eye Granite Maroon Paint
10
10
10
10
10
10
10
10
10
10
10