The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Difference between revisions of "Dolphin/ProjectList"

From A Tale in the Desert
Jump to navigationJump to search
Line 83: Line 83:
  
 
''Stash materials in Project Warehouse''
 
''Stash materials in Project Warehouse''
 +
    *  60 Cut Stone
 +
    * 10 Copper Sheeting
 +
    * 2500 Firebricks

Revision as of 17:26, 14 June 2010

The materials that are needed for guild projects are listed below.

Gyration Cell at Metalworks CP "DONE"

Stash materials in Metalworks Warehouse 518,-3329

  • Materials:
    • 1000/1000 Boards
    • 500/500 Clay
    • 250/250 Concrete
    • 50/50 Copper Sheeting
    • 12/12 Crucibles
    • 20/20 Glass Pipe
    • 100/100 Leather
    • 50/50 Moon Steel
    • 10/10 Pulleys
    • 25/25 Tin Sheeting

Deep Well at DONE

Stash materials in Project Warehouse 519,-3331

  • Materials:
    • 200/200 Rope
    • 400/400 Boards
    • 300/300 Nails
    • 20/20 Screw Gear
    • 500/500 Oil
    • 2000/2000 Leather
  • Medium Construction Site:
    • 2/2 Canvas
    • 8/8 Rope

Barrel Grinder at "DONE"

Stash materials in Project Warehouse 519,-3331

  • Materials:
    • 0/120 Bearings
    • 0/3200 Boards
    • 0/20 Cable
    • 0/600 Leather
    • 0/4000 Oil
    • 1000/1000 Small Quartz


Open Tech Advanced Metallurgy 4

Stash materials in Project Warehouse

  • Materials:
    • 0/700 Thoth's Metal
    • 0/700 Water Metal
    • 0/1000 Steel
    • 0/500 Pratyeka Tree
    • 0/500 Folded Birch

Open Tech Brick Automation

Stash materials in Project Warehouse

  • Materials:
    • 0/1000 Bearings
    • 0/10000 Oil
    • 0/300 Small Gears
    • 0/150 Medium Gears
    • 0/50 Large Gears


Pottery Deck at Brick Workshop

Stash materials in Project Warehouse

  • Materials:
    • 0/240 Boards
    • 0/500 Limestone
    • 0/60 Flystone
    • 0/200 Bearings
    • 0/300 Oil

Clinker Vat at Processing Building

Stash materials in Project Warehouse

   *  60 Cut Stone
   * 10 Copper Sheeting
   * 2500 Firebricks