The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
Difference between revisions of "Persephone Furnace"
From A Tale in the Desert
Jump to navigationJump to search (Add BuildingInfo. Trim related pages. Add a note about fuel. NB: There is missing info on this page that should be transcribed from Furnaces.) |
(Copying data from the Furnaces page) |
||
Line 24: | Line 24: | ||
*10 [[requires::Tin Sheeting]] | *10 [[requires::Tin Sheeting]] | ||
*2000 [[requires::Water in Jugs]] | *2000 [[requires::Water in Jugs]] | ||
+ | |||
+ | == Yield == | ||
+ | |||
+ | Burns 28 petrol per day (28 ticks per day) | ||
+ | |||
+ | {| border="1" | ||
+ | ! Ore Used!! Petrol Used !! Metal Yield !! Time opened !! Ore Cost/Metal | ||
+ | |||
+ | |- | ||
+ | | 20000 | ||
+ | | 28 | ||
+ | | 1340 | ||
+ | | 24 hours (1 day ) | ||
+ | | 14.93 | ||
+ | | | ||
+ | |- | ||
+ | | 20000 | ||
+ | | 56 | ||
+ | | 2000 | ||
+ | | 48 hours (2 days) | ||
+ | | 10.00 | ||
+ | | | ||
+ | |- | ||
+ | | 20000 | ||
+ | | 84 | ||
+ | | 2400 | ||
+ | | 72 hours (3 days) | ||
+ | | 8.33 | ||
+ | | | ||
+ | |- | ||
+ | | 20000 | ||
+ | | 450 | ||
+ | | 3560 | ||
+ | | 385 hours(16 days and 1 hour) | ||
+ | | ~5.618 | ||
+ | | | ||
+ | |- | ||
+ | |||
+ | |} | ||
+ | |||
==Related Pages== | ==Related Pages== |
Revision as of 10:11, 20 March 2009
Source
This building becomes available after the Metallurgy 2 technology is learned at a University of Harmony.
It uses Petroleum as fuel.
Cost
- 1 Aluminum Plate
- 2500 Boards
- 2500 Clay Bricks
- 20 Copper Pipe
- 50 Copper Sheeting
- 15 Crucibles
- 250 Cut Stone
- 20 Fine Glass Pipe
- 500 Gypsum
- 40 Iron Bars
- 40 Iron_Strap
- 200 Lime
- 10 Pulley
- 150 Steel Sheeting
- 10 Thermometers
- 10 Tin Sheeting
- 2000 Water in Jugs
Yield
Burns 28 petrol per day (28 ticks per day)
Ore Used | Petrol Used | Metal Yield | Time opened | Ore Cost/Metal | |
---|---|---|---|---|---|
20000 | 28 | 1340 | 24 hours (1 day ) | 14.93 | |
20000 | 56 | 2000 | 48 hours (2 days) | 10.00 | |
20000 | 84 | 2400 | 72 hours (3 days) | 8.33 | |
20000 | 450 | 3560 | 385 hours(16 days and 1 hour) | ~5.618 |