The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
Difference between revisions of "Guilds/KeepPumping"
Line 251: | Line 251: | ||
</div> | </div> | ||
− | == | + | ==Estimated resources for about 20 towers, without raising pump, flat terrain== |
These figures are based on T3 costs : | These figures are based on T3 costs : | ||
Line 279: | Line 279: | ||
</div> | </div> | ||
</div> | </div> | ||
− | |||
==Map== | ==Map== |
Revision as of 19:48, 20 April 2009
Intro
Page for the Central/Northern Meroe Aquaduct system
Build order is determined by how soon you got it. We expect people to help in the building of the pump and in towers, including ones that need building after theirs. The map below shows the planned route, which will encompass a good mix of dirt, sand and grass, all in non-polluted areas. Build order is first come first built.
Build Order
- Orrin
- Oni
- Katezinha
- Thera
- Mystraca
- Maata
- Kebi
- Aryballa
- Sharae
Resources for basic pump
This is a list of the resources. Please claim an area to work on,a part of an area, or a base material needed for a complex ingredient.
600 Steel Wire
0/600 Done
Pledged by: Orrin
====Requires==== 60 Steel: *84 Iron *12 Tin *800 CC *120 Towering Palm
600 Copper Wire
0/600 Done
Pledged by: Aryballa
====Requires==== *60 Copper *300 CC
120 Moon Steel Sheeting
0/120 Done
Pledged by: Orrin
1 Cistern
0/1 Done
Pledged by: Mystraca
50000 White Tiles
0/50000 Done
Pledges: Sharae
30000 Greenish Tiles
2000/30000 Done
Pledges: Oni, Ariella and Pascalito
30000 Yellowish Tiles
0/30000 Done
Pledges: Oni
30000 Pinkish Tiles
0/30000 Done
Pledges: Oni
50000 Black Tiles
1770/50000 Done
Pledges:Sharae
100000 Any Colour Tiles
0/100000 Done
Pledges: Sharae
50000 Rotproof Rigid Nontoxic Boards
0/50000 Done
Pledges: Partially by Ariella and Pascalito
====Requires==== *Lime
10000 Concrete
0/10000 Done
Pledges: Oni
====Requires==== *600 Cement or *60 Gypsum *60 Bauxite *10000 Gravel | 2000/10000 Oni
100 Oyster Shell Marble
0/100 Done
Pledged by Ariella and Pascalito
751 -3492 741 -3561 749 -3596 717 -3584 727 -3524 720 -3495 726 -3458
100 Night Granite
0/100 Done
Pledged by Ariella and Pascalito
805 -3456 756 -3450 770 -3514 724 -3440 834 -3509 732 -3383 676 -3381
100 Grey Star Marble
0/100 Done
Pledged by Ariella and Pascalito
575 -3173 667 -3181 726 -3147 598 -3113 672 -3077 633 -3019 4263,-572 (from Grand Falcons in FB)
Estimated resources for about 20 towers, without raising pump, flat terrain
These figures are based on T3 costs :
- 20 cistern
- 350 clay (40 hours)
- 2000 wood (20 hours)
- 100 copper pipe
- 1000 copper (500 minutes)
- 5000 concrete
- 5000 gravel
- 200 medium stones
- 300 cement
- 5000 gravel
- 400 tar
- 1500 cut stones
- 1500 cuttable stones (4500 minutes)
- 70000 bricks
- 111 pipe segments
- 11100 clay (111 hours)
- 11100 wood (444 hours)
- 4000 black tiles
- 2000 white tiles
- 1000 yellowish tiles
- 1000 redish tiles
- 1000 greenish tiles
- 1000 bluish tiles
Map