The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
Difference between revisions of "Guilds/KeepPumping"
Line 76: | Line 76: | ||
| 61/100 || [[Grey Star Marble]] || Ariella, Pascalito || | | 61/100 || [[Grey Star Marble]] || Ariella, Pascalito || | ||
575 -3173 21 extracted - collapsed<br> | 575 -3173 21 extracted - collapsed<br> | ||
− | 667 -3181 C216-255; '''B337-411 G449-543'''<br> | + | 667 -3181 '''C216-255'''; '''B337-411 G449-543'''<br> |
726 -3147 G159-176; D25-29 G41-50<br> | 726 -3147 G159-176; D25-29 G41-50<br> | ||
598 -3113 16 extracted - collapsed<br> | 598 -3113 16 extracted - collapsed<br> | ||
672 -3077 24 extracted - collapsed<br> | 672 -3077 24 extracted - collapsed<br> | ||
− | 633 -3019 '''D344-413'''; D364-437 F62-73<br> | + | 633 -3019 '''D344-413'''; '''D364-437 F62-73'''<br> |
4263,-572 (from Grand Falcons in FB) | 4263,-572 (from Grand Falcons in FB) | ||
|- | |- |
Revision as of 18:01, 14 May 2009
Intro
Page for the Central/Northern Meroe Aquaduct system
Build order is determined by how soon you got it. We expect people to help in the building of the pump and in towers, including ones that need building after theirs. The map below shows the planned route, which will encompass a good mix of dirt, sand and grass, all in non-polluted areas. Build order is first come first built.
Build Order
Build order will be by Guild join order (permissions have not been changed much so guild members should still be listed by join order). Of course if your not online when were ready to put yours up you may be skipped (since you have to put the last item in the construction site for it to count as "yours"). I'm guessing once we get the pump up, water tower builds should go pretty quickly since the materials for them are not too expensive (compared to the pump).
- Orrin's Original div mat list
- (If you don't like the new one, let Oni or Orrin know and i'll put it back, no problem)
Buildings and Resources
If your having trouble editing the below list to add something, leave a note with Oni or Orrin or ask someone in the guild chat if they can update for you. If all else fails, leave a note in the "discussion" tab above the page like Sariel did and I'll update the page.
Aqueduct Pump
QTY | Item | Pledges | Notes/Status |
---|---|---|---|
0/600 | Steel Wire | Orrin | |
600/600 | Copper Wire | Aryballa | DONE |
120/120 | Moon Steel Sheeting | Orrin | With Aryballa DONE |
1/1 | Cistern | Mystraca | |
9322/50000 | White Raeli Tiles | Sharae, Katezinha, Oni, Mystraca, Mebala, Nighthawk | Myst added 3473 |
11397/30000 | Greenish Raeli Tiles | Oni, Taffer-Tula, Ariella, Pascalito, Sharae | |
4375/30000 | Yellowish Raeli Tiles | Oni, Katezinha | |
15107/30000 | Pinkish Raeli Tiles | Oni, Sharae | |
13285/50000 | Black Raeli Tiles | Sharae, Maata, Jadan, Mebala, Nighthawk | |
3272/100000 | Any color of Raeli Tiles | Sharae, Katezinha, Orrin, Mebala, Nighthawk | |
6000/50000 | Rotproof, Rigid, Nontoxic Boards | Ariella, Pascalito, strutter |
possible recipes
|
0/10000 0/600 4000/10000 |
Concrete Cement Gravel |
Oni |
|
68/100 | Oyster Shell Marble | Ariella, Pascalito |
751 -3492 A354-404; C195-220 G447-541 |
100/100 | Night Granite | Ariella, Pascalito |
805 -3456 35 extracted - collapsed |
61/100 | Grey Star Marble | Ariella, Pascalito |
575 -3173 21 extracted - collapsed |
Water Towers
QTY | Item | Pledges | Notes |
---|---|---|---|
26/500 | Pipe Segments | Sariel, Oni, Mystraca | |
5/20 | Cistern | Sariel, Mystraca | 1/tower |
1480/520750 | Bricks | Jadan, hezekiah | |
0/21750 | Concrete | 100/tower + 16750 for raising costs of chain | |
0/12588 | Cut Stone | Jadan |
Estimated resources for first pump capacity upgrade
Based on T3 costs :
- 200 tar
- 300 leather
- 250 canvas
- 10 cable
- 250 steel wire
- 25 steel (65 minutes)
- 250 steel wire
Estimated resources for about 20 towers, without raising pump, flat terrain
These figures are based on T3 costs :
- 20 cistern
- 7000 clay (40 hours)
- 2000 wood (20 hours)
- 100 copper pipe
- 1000 copper (500 minutes)
- 5000 concrete
- 5000 gravel
- 200 medium stones
- 300 cement
- 5000 gravel
- 400 tar
- 1500 cut stones
- 1500 cuttable stones (4500 minutes)
- 70000 bricks
- 111 pipe segments
- 11100 clay (111 hours)
- 11100 wood (444 hours)
- 4000 black tiles
- 2000 white tiles
- 1000 yellowish tiles
- 1000 redish tiles
- 1000 greenish tiles
- 1000 bluish tiles
Map