The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
Difference between revisions of "User:Inkoaten/Survey"
Line 88: | Line 88: | ||
! Material !! Required !! SAWW estimate | ! Material !! Required !! SAWW estimate | ||
|- | |- | ||
− | | Bricks || | + | | Bricks || 105,850 || 92,000 |
|- | |- | ||
− | | Concrete || | + | | Concrete || 4,514 || 4,100 |
|- | |- | ||
| Cut Stone || 2,338 || 1,580 | | Cut Stone || 2,338 || 1,580 | ||
|- | |- | ||
− | | Pipe Segments || | + | | Pipe Segments || 107 || 130 |
|} | |} | ||
Revision as of 14:28, 16 May 2009
Survey
Q1940 barometer (yes, I suck at glassblowing); max error = +/-53 inches
Location | Height | Corrected | Time | Terrain | Notes |
---|---|---|---|---|---|
1038,1568 | - | - | Shallow water | Pump construction site | |
1030,1575 | - | - | Deep water | Pump location | |
1070,1575 | inaccessible | ||||
1040,1593 | inaccessible | ||||
1060,1593 | 0' 0" | 0' 0" | - | Shallow water | |
1090,1575 | 14' 11" | 18' 10" | 8:00PM | ||
1050,1575 | 35' 9" | 39' 8" | 8:01PM | Harmony Ridge #1 | |
1040,1558 | 3' 7" | 7' 5" | 8:03PM | ||
1060,1558 | 139' 4" | 143' 2" | 8:07PM | Harmony Ridge #2 | |
1080,1558 | 193' 11" | 197' 9" | 8:10PM | Harmony Ridge #3 | |
1070,1540 | 170' 6" | 174' 3" | 8:12PM | ||
1060,1540 | 100' 3" | 104' 0" | 8:14PM | ||
1040,1523 | 25' 10" | 29' 7" | 8:18PM | ||
1060,1523 | 113' 6" | 117' 2" | 8:20PM | ||
1080,1523 | 161' 4" | 156' 0" | 8:24PM | ||
1090,1540 | 157' 0" | 160' 7" | 8:26PM | Harmony Ridge #4 | |
1100,1558 | inaccessible | ||||
1110,1540 | 213' 8" | 217' 1" | 8:42PM | Harmony Ridge #5 | |
1120,1558 | 121' 9" | 125' 1" | 8:49PM | ||
1110,1575 | 0' 0" | 8:54PM | shallow water | ||
1130,1540 | 232' 9" | 233' 0" | 11:48PM | Harmony Ridge #6 | |
1150,1540 | 228' 9" | 229' 0" | 11:51PM | Harmony Ridge #7 | |
1170,1540 | 188' 4" | 188' 6" | 11:55PM | Harmony Ridge #8 | |
1190,1540 | 176' 3" | 176' 4" | 11:58PM | Harmony Ridge #9 | |
1210,1540 | 231' 4" | 231' 4" | 12:01AM | Harmony Ridge #10 | |
1220,1558 | 251' 6" | 251' 5" | 12:05AM | Harmony Ridge #11 | |
1240,1558 | 291' 6" | 291' 2" | 12:18AM | Harmony Ridge #12 | |
1260,1558 | 245' 10" | 245' 5" | 12:22AM | Harmony Ridge #13 | |
1270,1575 | 154' 6" | 154' 1" | 12:24AM | grass | Harmony Ridge #14 |
1280,1593 | 135' 9" | 135' 1" | 12:35AM | grass | Harmony Ridge #15 |
1300,1593 | 125' 1" | 124' 4" | 12:40AM | grass,dirt | Harmony Ridge #16 |
1320,1593 | 55' 1" | 54' 3" | 12:44AM | grass,dirt | Harmony Ridge #17 Close to compound, mine |
1340,1593 | 23' 9" | 22' 11" | 12:47AM | grass | Harmony Ridge #18 Crosses road |
1360,1593 | 21' 6" | 20' 7" | 12:51AM | grass | Harmony Ridge #19 |
1370,1610 | 54' 7" | 53' 6" | 12:57AM | grass | Harmony Ridge #20 |
Harmony Ridge route
This is essentially the T3 route described on this page on the T3 wiki, re-surveyed for T4.
Placing 20 towers at the named positions above, and accounting for the minimum height needed to clear the ridge, we end up with the pump at height 351 and the last tower at height 54. The towers can later be raised to accomodate further expansion, but the bulk of the hard work is done at the start.
Tower raising costs:
Material | Required | SAWW estimate |
---|---|---|
Bricks | 105,850 | 92,000 |
Concrete | 4,514 | 4,100 |
Cut Stone | 2,338 | 1,580 |
Pipe Segments | 107 | 130 |
Pump raising costs:
Material | Required | SAWW estimate |
---|---|---|
Bricks | 113,201 | 30,000 |
Concrete | 5,660 | 1,500 |
Cut Stone | 1,748 | 502 |
Pipe Segments | 25 | 10 |
Gearboxes | 50 | 20 |