The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Difference between revisions of "User:Inkoaten/Survey"

From A Tale in the Desert
Jump to navigationJump to search
Line 88: Line 88:
  
 
{| border="1" cellspacing="0" cellpadding="10"
 
{| border="1" cellspacing="0" cellpadding="10"
! Material !! Required !! SAWW estimate
+
! Material !! T4 est !! T3 !! SAWW estimate
 
|-
 
|-
| Bricks || 105,850 || 92,000
+
| Bricks || 105,850 || 105,850 || 92,000
 
|-
 
|-
| Concrete || 3,114 || 4,100<br>(includes tower construction costs?)
+
| Concrete || 3,114 || 3,114 || 4,100<br>(includes tower construction costs?)
 
|-
 
|-
| Cut Stone || 709 || 1,580
+
| Cut Stone || 709 || 2,338 || 1,580
 
|-
 
|-
| Pipe Segments || 93 || 130
+
| Pipe Segments || 93 || 107 || 130
 
|}
 
|}
  
Line 102: Line 102:
  
 
{| border="1" cellspacing="0" cellpadding="10"
 
{| border="1" cellspacing="0" cellpadding="10"
! Material !! Required !! SAWW estimate
+
! Material !! T4 est !! T3 !! SAWW estimate
 
|-
 
|-
| Bricks || 113,201 || 30,000
+
| Bricks || 113,201 || 113,201 || 30,000
 
|-
 
|-
| Concrete || 5,660 || 1,500
+
| Concrete || 5,660 || 5,660 || 1,500
 
|-
 
|-
| Cut Stone || 1,760 || 502
+
| Cut Stone || 1,760 || 1,748 || 502
 
|-
 
|-
| Pipe Segments || 25 || 10
+
| Pipe Segments || 25 || 25 || 10
 
|-
 
|-
| Gearboxes || 50 || 20
+
| Gearboxes || 50 || 50 || 20
 
|}
 
|}
  

Revision as of 06:57, 17 May 2009

Survey

Q1940 barometer (yes, I suck at glassblowing); max error = +/-53 inches

Location Height Corrected Time Terrain Notes
1038,1568 - - Shallow water Pump construction site
1030,1575 - - Deep water Pump location
1070,1575 inaccessible
1040,1593 inaccessible
1060,1593 0' 0" 0' 0" - Shallow water
1090,1575 14' 11" 18' 10" 8:00PM
1050,1575 35' 9" 39' 8" 8:01PM Harmony Ridge #1
1040,1558 3' 7" 7' 5" 8:03PM
1060,1558 139' 4" 143' 2" 8:07PM Harmony Ridge #2
1080,1558 193' 11" 197' 9" 8:10PM Harmony Ridge #3
1070,1540 170' 6" 174' 3" 8:12PM
1060,1540 100' 3" 104' 0" 8:14PM
1040,1523 25' 10" 29' 7" 8:18PM
1060,1523 113' 6" 117' 2" 8:20PM
1080,1523 161' 4" 156' 0" 8:24PM
1090,1540 157' 0" 160' 7" 8:26PM Harmony Ridge #4
1100,1558 inaccessible
1110,1540 213' 8" 217' 1" 8:42PM Harmony Ridge #5
1120,1558 121' 9" 125' 1" 8:49PM
1110,1575 0' 0" 8:54PM shallow water
1130,1540 232' 9" 233' 0" 11:48PM Harmony Ridge #6
1150,1540 228' 9" 229' 0" 11:51PM Harmony Ridge #7
1170,1540 188' 4" 188' 6" 11:55PM Harmony Ridge #8
1190,1540 176' 3" 176' 4" 11:58PM Harmony Ridge #9
1210,1540 231' 4" 231' 4" 12:01AM Harmony Ridge #10
1220,1558 251' 6" 251' 5" 12:05AM Harmony Ridge #11
1240,1558 291' 6" 291' 2" 12:18AM Harmony Ridge #12
1260,1558 245' 10" 245' 5" 12:22AM Harmony Ridge #13
1270,1575 154' 6" 154' 1" 12:24AM grass Harmony Ridge #14
1280,1593 135' 9" 135' 1" 12:35AM grass Harmony Ridge #15
1300,1593 125' 1" 124' 4" 12:40AM grass,dirt Harmony Ridge #16
1320,1593 55' 1" 54' 3" 12:44AM grass,dirt Harmony Ridge #17
Close to compound, mine
1340,1593 23' 9" 22' 11" 12:47AM grass Harmony Ridge #18
Crosses road
1360,1593 21' 6" 20' 7" 12:51AM grass Harmony Ridge #19
1370,1610 54' 7" 53' 6" 12:57AM grass Harmony Ridge #20

Harmony Ridge route

This is essentially the T3 route described on this page on the T3 wiki, re-surveyed for T4.

Placing 20 towers at the named positions above, and accounting for the minimum height needed to clear the ridge, we end up with the pump at height 351 and the last tower at height 54. The towers can later be raised to accomodate further expansion, but the bulk of the hard work is done at the start.

(Warning: the below figures are highly speculative and don't match T3 numbers. Can't verify them until the pump is up. Chat me for an explanation)

Tower raising costs (raise towers by 1557 feet total):

Material T4 est T3 SAWW estimate
Bricks 105,850 105,850 92,000
Concrete 3,114 3,114 4,100
(includes tower construction costs?)
Cut Stone 709 2,338 1,580
Pipe Segments 93 107 130

Pump raising costs (upgrade from height=100 to height=351)

Material T4 est T3 SAWW estimate
Bricks 113,201 113,201 30,000
Concrete 5,660 5,660 1,500
Cut Stone 1,760 1,748 502
Pipe Segments 25 25 10
Gearboxes 50 50 20

nb: gearboxes can be done 20 at a time?

(I derive this data via a spreadsheet, contact me for a copy if you need it)