The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
Difference between revisions of "Guilds/Cabal of the Arch"
Line 37: | Line 37: | ||
* 0/9000 [[Concrete]] | * 0/9000 [[Concrete]] | ||
* 0/4500 [[Cut Stone]] | * 0/4500 [[Cut Stone]] | ||
− | * | + | * '''600/600 [[Tar]]''' |
* 25/210 [[Pipe Segment]] | * 25/210 [[Pipe Segment]] | ||
* 0/150 [[Copper Pipe]] | * 0/150 [[Copper Pipe]] |
Revision as of 06:59, 18 May 2009
Cabal of the Arch (CoTA)
We are located at Adn, 863 7176
Those located in Adn with a passion for passing Architecture tests may apply. Admission cost is 200 bricks, 100 boards. Fair Warning! This is not a principle passing guild.
If you are in Adn, and like to pass Arch tests chat an elder (Toldy, Garak) to have your application reviewed.
Current Projects
Aqueduct
The following is a list of supplies needed to help complete the materials for the aqueduct
- 100 Lime for the boards
- 5625 Tedra #409 Seed for the canvas
Aqueduct Pump
- 600/600 Steel Wire for Tension Mechanism
- 600/600 Copper Wire for Winding Mechanism
- 0/120 Moon Steel Sheeting for Waterproof Sheath
- 1/1 Cistern
- 0/50000 White Raeli Tiles
- 0/30000 Greenish Raeli Tiles
- 1972/30000 Yellowish Raeli Tiles
- 0/30000 Pinkish Raeli Tiles
- 0/50000 Black Raeli Tiles
- 0/100000 Any color of Raeli Tiles
- 25000/50000 Rotproof, Rigid, Nontoxic Boards
- 0/10000 Concrete for Base
- 74/100 Oyster Shell Marble
- 24/100 Night Granite
- 0/100 Grey Star Marble
Estimate of Tower Costs
- 0/210000 Bricks
- 0/9000 Concrete
- 0/4500 Cut Stone
- 600/600 Tar
- 25/210 Pipe Segment
- 0/150 Copper Pipe
- 2/30 Cistern
- 0/6000 Black Raeli Tiles
- 0/3000 White Raeli Tiles
- 0/1500 Yellowish Raeli Tiles
- 0/1500 Reddish Raeli Tiles
- 1200/1500 Bluish Raeli Tiles
Upgrade to Pump Height
- 30,000 Bricks
- 1,500 Concrete
- 500 Cut Stone
- 20 Gearbox
- 10 Pipe Segment
Upgrde Cistern Size to 1M
Aqueduct Tower Raising Formula
2000 + (50*N)Bricks
2*N Concrete
1.5 * N Cut Stone (round up)
5 + (N/50) Pipe Segments
Important Locations