The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
Difference between revisions of "Guilds/Oasis/Current Projects"
From A Tale in the Desert
Jump to navigationJump to searchLine 2: | Line 2: | ||
=CURRENT PROJECTS= | =CURRENT PROJECTS= | ||
Please help contribute to: | Please help contribute to: | ||
− | + | == Hades at Antimony Mine == | |
+ | *Mats: | ||
+ | **0/2 Aluminum Plate | ||
+ | **0/5000 Boards | ||
+ | **0/5000 Clay Bricks | ||
+ | **0/100 Copper Sheeting | ||
+ | **0/30 Crucibles | ||
+ | **0/500 Cut Stone | ||
+ | **0/20 Fine Glass Pipe | ||
+ | **0/75 Iron Bars | ||
+ | **0/75 Iron Strap | ||
+ | **0/24 Pulley | ||
+ | **0/300 Steel Sheeting | ||
+ | **0/3 Thermometer | ||
+ | **0/15 Tin Sheeting | ||
+ | <br> | ||
== Raeli Ovens == | == Raeli Ovens == | ||
Mats: | Mats: |
Revision as of 21:45, 15 July 2009
Return to Main Page
CURRENT PROJECTS
Please help contribute to:
Hades at Antimony Mine
- Mats:
- 0/2 Aluminum Plate
- 0/5000 Boards
- 0/5000 Clay Bricks
- 0/100 Copper Sheeting
- 0/30 Crucibles
- 0/500 Cut Stone
- 0/20 Fine Glass Pipe
- 0/75 Iron Bars
- 0/75 Iron Strap
- 0/24 Pulley
- 0/300 Steel Sheeting
- 0/3 Thermometer
- 0/15 Tin Sheeting
Raeli Ovens
Mats:
- 9th Raeli Oven - Mats needed:
- 0/3000 Clay Bricks
- 0/50 Copper Wire
- 0/25 Moonsteel Sheeting (+3 moonsteel)
- 0/20 Small Gears
- 0/10 Bearings
- 0/10 Cement
- 0/10 Cut Stone
- 0/10 Rope
- 0/5 Crucibles
- 0/5 Glass Pipes
- 0/5 Medium Gears
- 0/3 Iron Bars
- 0/3 Shovel Blades
- 0/2 Pinch Roller
- 0/1 5000+ Quality Carpentry Blade
- 0/1777 Folded Birch Resin (&595 Hawthorn)
Gyration Cell
- Northern Mining Camp 1100,-2740
STILL NEEDS AS OF 9 JUL 09
- 122/500 Clay
- 0/250 Concrete
- 0/50 Copper Sheeting
- 0/12 Crucibles
- 0/20 Glass Pipe
- 0/50 Moon Steel
- 0/25 Tin Sheeting
Gyration Cell
- Eastern Mining Camp 1571,-3356
STILL NEEDS AS OF 9 Jul 09:
- 15/50 Copper Sheeting
- 3/20 Glass Pipe
Acoustics Lab
- Mats