The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Difference between revisions of "User:Inkoaten/Survey"

From A Tale in the Desert
Jump to navigationJump to search
Line 1: Line 1:
 +
=== Survey ===
 +
 
Q1940 barometer (yes, I suck at glassblowing); max error = +/-53 inches
 
Q1940 barometer (yes, I suck at glassblowing); max error = +/-53 inches
  
Line 73: Line 75:
 
|-
 
|-
 
| 1370,1610 ||  54'  7" || 53' 6" || 12:57AM || grass || Harmony Ridge #20
 
| 1370,1610 ||  54'  7" || 53' 6" || 12:57AM || grass || Harmony Ridge #20
 +
|}
 +
 +
=== Harmony Ridge route ===
 +
 +
This is essentially the T3 route described on [http://www.atitd.org/wiki/tale3/Guilds/The_Eighth_Lake/Harmony_Ridge this page on the T3 wiki], re-surveyed for T4.
 +
 +
Placing 20 towers at the named positions above, and accounting for the minimum height needed to clear the ridge, we end up with the pump at height 351 and the last tower at height 54. The towers can later be raised to accomodate further expansion, but the bulk of the hard work is done at the start.
 +
 +
Tower raising costs:
 +
 +
{| border="1" cellspacing="0" cellpadding="10"
 +
! Material !! Required !! SAWW estimate
 +
|-
 +
| Bricks || 128,100 || 92,000
 +
|-
 +
| Concrete || 5,114 || 4,100
 +
|-
 +
| Cut Stone || 2,338 || 1,580
 +
|-
 +
| Pipe Segments || 137 || 130
 +
|}
 +
 +
Pump raising costs:
 +
 +
{| border="1" cellspacing="0" cellpadding="10"
 +
! Material !! Required !! SAWW estimate
 +
|-
 +
| Bricks || 113,201 || 30,000
 +
|-
 +
| Concrete || 5,660 || 1,500
 +
|-
 +
| Cut Stone || 1,748 || 502
 +
|-
 +
| Pipe Segments || 25 || 10
 +
|-
 +
| Gearboxes || 50 || 20
 
|}
 
|}

Revision as of 14:05, 16 May 2009

Survey

Q1940 barometer (yes, I suck at glassblowing); max error = +/-53 inches

Location Height Corrected Time Terrain Notes
1038,1568 - - Shallow water Pump construction site
1030,1575 - - Deep water Pump location
1070,1575 inaccessible
1040,1593 inaccessible
1060,1593 0' 0" 0' 0" - Shallow water
1090,1575 14' 11" 18' 10" 8:00PM
1050,1575 35' 9" 39' 8" 8:01PM Harmony Ridge #1
1040,1558 3' 7" 7' 5" 8:03PM
1060,1558 139' 4" 143' 2" 8:07PM Harmony Ridge #2
1080,1558 193' 11" 197' 9" 8:10PM Harmony Ridge #3
1070,1540 170' 6" 174' 3" 8:12PM
1060,1540 100' 3" 104' 0" 8:14PM
1040,1523 25' 10" 29' 7" 8:18PM
1060,1523 113' 6" 117' 2" 8:20PM
1080,1523 161' 4" 156' 0" 8:24PM
1090,1540 157' 0" 160' 7" 8:26PM Harmony Ridge #4
1100,1558 inaccessible
1110,1540 213' 8" 217' 1" 8:42PM Harmony Ridge #5
1120,1558 121' 9" 125' 1" 8:49PM
1110,1575 0' 0" 8:54PM shallow water
1130,1540 232' 9" 233' 0" 11:48PM Harmony Ridge #6
1150,1540 228' 9" 229' 0" 11:51PM Harmony Ridge #7
1170,1540 188' 4" 188' 6" 11:55PM Harmony Ridge #8
1190,1540 176' 3" 176' 4" 11:58PM Harmony Ridge #9
1210,1540 231' 4" 231' 4" 12:01AM Harmony Ridge #10
1220,1558 251' 6" 251' 5" 12:05AM Harmony Ridge #11
1240,1558 291' 6" 291' 2" 12:18AM Harmony Ridge #12
1260,1558 245' 10" 245' 5" 12:22AM Harmony Ridge #13
1270,1575 154' 6" 154' 1" 12:24AM grass Harmony Ridge #14
1280,1593 135' 9" 135' 1" 12:35AM grass Harmony Ridge #15
1300,1593 125' 1" 124' 4" 12:40AM grass,dirt Harmony Ridge #16
1320,1593 55' 1" 54' 3" 12:44AM grass,dirt Harmony Ridge #17
Close to compound, mine
1340,1593 23' 9" 22' 11" 12:47AM grass Harmony Ridge #18
Crosses road
1360,1593 21' 6" 20' 7" 12:51AM grass Harmony Ridge #19
1370,1610 54' 7" 53' 6" 12:57AM grass Harmony Ridge #20

Harmony Ridge route

This is essentially the T3 route described on this page on the T3 wiki, re-surveyed for T4.

Placing 20 towers at the named positions above, and accounting for the minimum height needed to clear the ridge, we end up with the pump at height 351 and the last tower at height 54. The towers can later be raised to accomodate further expansion, but the bulk of the hard work is done at the start.

Tower raising costs:

Material Required SAWW estimate
Bricks 128,100 92,000
Concrete 5,114 4,100
Cut Stone 2,338 1,580
Pipe Segments 137 130

Pump raising costs:

Material Required SAWW estimate
Bricks 113,201 30,000
Concrete 5,660 1,500
Cut Stone 1,748 502
Pipe Segments 25 10
Gearboxes 50 20