The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Guilds/Adn Aquaduct Association

From A Tale in the Desert
Jump to navigationJump to search


Adn Aqueduct Association

Guild created for the planning and development of an aqueduct system in Adn. With our partners from the Scratching Post, we aim to bring the life-giving waters of the Nile to Cat's Claw Ridge in an ambitious construction project! Guild hall is located at 1037, 6892 in Adn.


This link will take you to [Test Of Life] where you can get more details about specific items.

  • Pump Site Adn 871, 6373
  • Warehouses Located at Pump Site (S of Pi Bridge on the West Bank of the Nile)

Current needs:

  • Our Pump is up! We are now seeking to raise it and assemble materials to raise towers and construct new ones.
  • Gravel, cement, and/or concrete.
  • Additional raeli tiles for additional towers. What colors you have available, please mark down.
  • Gearboxes for pump raising.
  • Pipe segments and cisterns.


Raeli Ovens/tiles


Current Colors available:

  • Pinks (5 hilly)(1 Scratching Post)
  • Blue (1 1/2 hilly)(1 Sesnut & Injeru )(4 1/2 Scratching Post)
  • Green (2 hilly)(1/2 Scratching Post)
  • Yellows (1/2 hilly)
  • Other (5 hilly)(Injeru & Sesnut)(1 Spicy)(1 Scratching Post)

PUMP MATTS

Please add any matterials you commit yourself to work on for this project in the following table followed by your name. This will help us know what is and what is not being worked on. Thank you!

=TO RAISE PUMP TO 300'=
  • 1 Gearbox B417-B500 G194-G235
  • 1 Gearbox B437-B546 H370-H433
  • 1 Gearbox C336-C396 F439-F544
  • 1 Gearbox A370-A444 H310-H378
  • 1 Gearbox A97-A117 G22-G28
  • 1 Gearbox C218-C262 G429-G523
  • 1 Gearbox A493-A592 G173-G209
  • 1 Gearbox B349-B419 H167-H200
  • 1 Gearbox C148-C173 F106-F123
  • 1 Gearbox A280-A344 G344-G416
  • 1 Gearbox C278-C325 G489-G562
  • 1 Gearbox B408-B473 F21-F24
  • 1 Gearbox B473-B553 G399-G483
  • 1 Gearbox C141-C166 G493-G587
  • 1 Gearbox B229-B279 G14-G17
  • 1 Gearbox A287-A342 G469-G582
  • 1 Gearbox C11-C13 H131-H155
  • 1 Gearbox C95-C110 F106-F131
  • 1 Gearbox C57-C71 H281-H334
  • 1 Gearbox C87-C106 G490-G613
50000 Bricks
2500 Concrete
767 Cut Stone
10 Pipe Segment

TOWER MATS

Towers are built in a similar way as pumps. The construction tool will note how far away from a suitable location you are. You must be within 8 feet of a suitable location in order to place a construction site. Once placed, the construction site still may not work if it's not placed close enough to a pump or a connecting tower (it will say this and not let you add materials).


  1. July 10/09 update
AMT NEEDED EACH AMT NEEDED FOR 10 AMT ON HAND PLEDGES
1 Cistern 10 2
5 Copper Pipe 50 80
200 Black Raeli Tiles 2000 5959
100 White Raeli Tiles 1000 1084
50 Yellowish Raeli Tiles 500 300-
50 Reddish Raeli Tiles 500 3212
50 Greenish Raeli Tiles 500 300-
50 Blueish Raeli Tiles 500 1300
100 Concrete 1000 2165
20 Tar 200 668

TOWER MATS Upgrades

Material that on hand that can be used. 4 Sledge Hammers 71 Medium stones, 2 Gravel,

  1. July 10/09 Update
What is Needed AMT ON HAND PLEDGES
Bricks 13,684
Cut Stone 120
Concrete 2,165
Pipe Segments 26

PROPOSED ROUTE

Coords ID Elevation Owner Bonus
871, 6373 Pump 0 hilly -
860, 6371 1 9'10" Iy-Nefer Focus
840, 6371 2 9'10" jazmynn Strength
820, 6371 3 9'10" Injeru Constitution
800, 6371 4 10'7" Sesnut Dexterity
789, 6353 5 1'6" Mandy Focus
769, 6353 6 1'6" jaxum Focus
749, 6353 7 1'6" Khet Speed
730, 6353 8 1'9" Zog Dexterity
710, 6353 9 2'9" Yerbouti Perception, Carrots
690, 6353 10 15'2" inad Dexterity, Peppers
670, 6353 11 30'9" Alciphron Dexterity
660, 6336 12 54'1" Spicy Dexterity
640, 6336 13 2'8" hill Strength
620, 6336 14 2'11" Almelkehdes Focus
600, 6336 15 2'9"
580, 6336 16 47'5"
560, 6336 17 92'6"
540, 6336 18 19'5"
520, 6336 19 57'3"
500, 6336 20 65'8"
480, 6336 21 13'6"
460, 6336 22 45'2"
440, 6336 23 4'2"
420, 6336 24 3'6"
400, 6336 25 21'4"
380, 6336 26 6'9"
360, 6336 27 23'6"
340, 6336 28 28'1"
320, 6336 29 11'0"
300, 6336 30 9'10"
290, 6353 31 9'11"
270, 6353 32 9'11"
260, 6370 33 9'11"
240, 6370 34 9'10"
220, 6370 35 9'10" limit of 200' pump
200, 6370 36 36'5"
190, 6388 37
170, 6388 38
150, 6388 39
130, 6388 40 15'8"
110, 6388 41 9'11"
90, 6388 42 9'11"
70, 6388 43 14'9"
50, 6388 44 27'11"
30, 6388 45 21'5"
10, 6388 46 10'0"
[-]10, 6388 47 10'0"
[-]30, 6388 48 10'0"
[-]50, 6388 49 19'1" limit of 300' pump
[-]70, 6388 50 61'10"
[-]90, 6388 51 71'10"
[-]110, 6388 52 78'8" limit of 400' pump
[-]120, 6405 53 187'9"
[-]140, 6405 54 174'6"
[-]160, 6405 55 66'6"
[-]180, 6405 56 10'0"
[-]190, 6422 57 10'0"
[-]200, 6440 58 10'0"
[-]210, 6457 59 10'0"
[-]220, 6475 60 10'0"
[-]230, 6492 61 18'4"
[-]250, 6492 62 10'1"
[-]270, 6492 63 10'1"
[-]290, 6492 64
[-]300, 6509 65 84'1"
[-]310, 6526 66 196'10" Khyber Pass, 526' pump needed
[-]330, 6526 67 181'2"
[-]340, 6544 68 130'3"
[-]350, 6562 69 127'11"
[-]360, 6579 70 35'11"
[-]380, 6579 71 15'7"


Warning: Default sort key "Adn Aquaduct Association" overrides earlier default sort key "Adn_Aquaduct_Association".



CISTERN UPGRADES

Each tower uses 1440 water per day, so a non-upgraded pump cistern (100,000 capacity) would have to be filled twice a week to fill a 20-tower aqueduct line. Upgrading the cistern to 200,000 would mean filling it once a week, to 400,000 twice a month, etc. Each pumping session would take longer of course, but we would have to do it less often. A 60-tower line to CCR with a capacity 1,000,000 cistern would have to be pumped once every ten days or so.

Mats required to upgrade to:

Update July 10/09
CAPACITY TAR LEATHER CANVAS CABLE
400,00 Done Done Done Done
500,000? 800 1,200 1,000 40
1,000,000 9,000 13,500 11,250 450
Amount on hand 668 1205 14 340 (the rest hilly)