The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Guilds/Adn Aquaduct Association

From A Tale in the Desert
Jump to navigationJump to search


Adn Aqueduct Association

Guild created for the planning and development of an aqueduct system in Adn. With our partners from the Scratching Post, we aim to bring the life-giving waters of the Nile to Cat's Claw Ridge in an ambitious construction project! Guild hall is located at 1037, 6892 in Adn.


This link will take you to [Test Of Life] where you can get more details about specific items.

  • Pump Site Adn 871, 6373
  • Warehouses Located at Pump Site (S of Pi Bridge on the West Bank of the Nile)

Current needs:

  • Our Pump is up! We are now seeking to raise it and assemble materials to raise towers and construct new ones.
  • Gravel, cement, and/or concrete.
  • Additional raeli tiles for additional towers. What colors you have available, please mark down.
  • Gearboxes for pump raising.
  • Pipe segments and cisterns.


Raeli Ovens/tiles


Current Colors available:

  • Pinks (5 hilly)(1 Scratching Post)
  • Blue (1 1/2 hilly)(1 Sesnut & Injeru )(4 1/2 Scratching Post)
  • Green (2 hilly)(1/2 Scratching Post)
  • Yellows (1/2 hilly)
  • Other (5 hilly)(Injeru & Sesnut)(1 Spicy)(1 Scratching Post)

PUMP MATTS

Please add any matterials you commit yourself to work on for this project in the following table followed by your name. This will help us know what is and what is not being worked on. Thank you!

  • 400 Feet
  • 1 Gearbox A380-A441 G162-G194
  • 1 Gearbox A97-A113 G126-G152
  • 1 Gearbox A459-A560 G305-G375
  • 1 Gearbox B462-B578 F419-F515
  • 1 Gearbox A324-A402 H330-H389
  • 1 Gearbox A147-A173 G368-G427
  • 1 Gearbox A286-A337 F21-F25
  • 1 Gearbox C428-C535 G36-G41
  • 1 Gearbox C145-C178 G204-G235
  • 1 Gearbox C293-C363 F48-F56
  • 1 Gearbox B60-B69 G429-G532
  • 1 Gearbox B169-B194 H270-H324
  • 1 Gearbox A124-A155 G250-G293
  • 1 Gearbox B391-B465 H228-H274
  • 1 Gearbox A333-A410 F286-F335
  • 1 Gearbox B52-B62 F213-F251
  • 1 Gearbox B66-B77 G372-G428
  • 1 Gearbox C465-C535 H316-H367
  • 1 Gearbox A440-A550 F274-F332
  • 1 Gearbox B110-B132 G285-G345

70000 Bricks 3500 Concrete 1033 Cut Stone 10 Pipe Segment

  • Sesnut will make the gears boxes Toldy is supplying the gears (stock 212 small gears)

TOWER MATS

Towers are built in a similar way as pumps. The construction tool will note how far away from a suitable location you are. You must be within 8 feet of a suitable location in order to place a construction site. Once placed, the construction site still may not work if it's not placed close enough to a pump or a connecting tower (it will say this and not let you add materials).


  1. July 22/09 update
AMT NEEDED EACH AMT NEEDED FOR 10 AMT ON HAND PLEDGES
1 Cistern 10 27
5 Copper Pipe 50 161
200 Black Raeli Tiles 2000 3,759
100 White Raeli Tiles 1000 3,159
50 Yellowish Raeli Tiles 500 1,600
50 Reddish Raeli Tiles 500 4,462
50 Greenish Raeli Tiles 750 600
50 Blueish Raeli Tiles 600 9750
100 Concrete 1000 6,449
20 Tar 200 2,210

TOWER MATS Upgrades

Material that on hand that can be used. 4 Sledge Hammers 327 Medium stones, 2 Gravel,

  1. July 22/09 Update
What is Needed AMT ON HAND PLEDGES
Bricks 72,714
Cut Stone 2,926
Concrete 6,449
Pipe Segments 215

PROPOSED ROUTE

Coords ID Elevation Owner Bonus
871, 6373 Pump 0 hilly -
860, 6371 1 9'10" Iy-Nefer Focus
840, 6371 2 9'10" jazmynn Strength
820, 6371 3 9'10" Injeru Constitution
800, 6371 4 10'7" Sesnut Dexterity
789, 6353 5 1'6" Mandy Focus
769, 6353 6 1'6" jaxum Focus
749, 6353 7 1'6" Khet Speed
730, 6353 8 1'9" Zog Dexterity
710, 6353 9 2'9" Yerbouti Perception, Carrots
690, 6353 10 15'2" inad Dexterity, Peppers
670, 6353 11 30'9" Alciphron Dexterity
660, 6336 12 54'1" Spicy Dexterity
640, 6336 13 2'8" hill Strength
620, 6336 14 2'11" Almelkehdes Focus
600, 6336 15 2'9" Toldy Perception
580, 6336 16 47'5" ysabeau Dexterity
560, 6336 17 92'6" zing Speed
540, 6336 18 19'5" Yendorhut Strength
520, 6336 19 57'3" Akmenotep Strength
500, 6336 20 65'8" Murtha Endurance
480, 6336 21 13'6" RatBoy Constitution, 30 Leeks
460, 6336 22 45'2" Djemba Focus
440, 6336 23 4'2" Lazybonz Endurance
420, 6336 24 3'6" Tamblack Endurance
400, 6336 25 21'4" Cyndi Endurance
380, 6336 26 6'9" Dionysius Perception
360, 6336 27 23'6" Binny Speed, 24 Garlic
340, 6336 28 28'1"
320, 6336 29 11'0"
300, 6336 30 9'10"
290, 6353 31 9'11"
270, 6353 32 9'11"
260, 6370 33 9'11"
240, 6370 34 9'10"
220, 6370 35 9'10" limit of 200' pump
200, 6370 36 36'5"
190, 6388 37
170, 6388 38
150, 6388 39
130, 6388 40 15'8"
110, 6388 41 9'11"
90, 6388 42 9'11"
70, 6388 43 14'9"
50, 6388 44 27'11"
30, 6388 45 21'5"
10, 6388 46 10'0"
[-]10, 6388 47 10'0"
[-]30, 6388 48 10'0"
[-]50, 6388 49 19'1" limit of 300' pump
[-]70, 6388 50 61'10"
[-]90, 6388 51 71'10"
[-]110, 6388 52 78'8" limit of 400' pump
[-]120, 6405 53 187'9"
[-]140, 6405 54 174'6"
[-]160, 6405 55 66'6"
[-]180, 6405 56 10'0"
[-]190, 6422 57 10'0"
[-]200, 6440 58 10'0"
[-]210, 6457 59 10'0"
[-]220, 6475 60 10'0"
[-]230, 6492 61 18'4"
[-]250, 6492 62 10'1"
[-]270, 6492 63 10'1"
[-]290, 6492 64
[-]300, 6509 65 84'1"
[-]310, 6526 66 196'10" Khyber Pass, 526' pump needed
[-]330, 6526 67 181'2"
[-]340, 6544 68 130'3"
[-]350, 6562 69 127'11"
[-]360, 6579 70 35'11"
[-]380, 6579 71 15'7"


Warning: Default sort key "Adn Aquaduct Association" overrides earlier default sort key "Adn_Aquaduct_Association".



CISTERN UPGRADES

Each tower uses 1440 water per day, so a non-upgraded pump cistern (100,000 capacity) would have to be filled twice a week to fill a 20-tower aqueduct line. Upgrading the cistern to 200,000 would mean filling it once a week, to 400,000 twice a month, etc. Each pumping session would take longer of course, but we would have to do it less often. A 60-tower line to CCR with a capacity 1,000,000 cistern would have to be pumped once every ten days or so.

Mats required to upgrade to:

Update July 22/09
CAPACITY TAR LEATHER CANVAS CABLE
800,000 Done Done Done Done
900,00 1600 2400 2000 80
1,000,000 9,000 Done 11,250 450
Amount on hand 2,210 8,105 1,556 120 (the rest hilly)