The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
Guilds/Adn Aquaduct Association
Adn Aqueduct Association
Guild created for the planning and development of an aqueduct system in Adn. With our partners from the Scratching Post, we aim to bring the life-giving waters of the Nile to Cat's Claw Ridge in an ambitious construction project! Guild hall is located at 1037, 6892 in Adn.
This link will take you to [Test Of Life] where you can get more details about specific items.
- 5 Upgraded Brick machines 789 6297 please Load when your near(straw welcome)
- Pump Site Adn 871, 6373
- 8 Warehouses Located at Pump Site (S of Pi Bridge on the West Bank of the Nile)
- 5 Warehouses for tower mats located mid-line at 291, 6340 (Second Storage, aka tiles and tower 10X)
Current needs:
- Our Pump is up! We are now seeking to raise it and assemble materials to raise towers and construct new ones.
- Gravel, cement, and/or concrete, Cut Stones
- Additional raeli tiles for additional towers.
- Gearboxes for pump raising.
- Pipe segments and cisterns. (Cisterns more so)
PUMP MATTS
- Pump is at 500 feet
Please add any matterials you commit yourself to work on for this project in the following table followed by your name. This will help us know what is and what is not being worked on. Thank you!
- 600 Feet
1 Gearbox C353-C420 H12-H14 1 Gearbox C385-C462 F273-F322 1 Gearbox C374-C438 H433-H502 1 Gearbox B281-B348 G34-G42 1 Gearbox B27-B31 G393-G460 1 Gearbox C58-C70 H274-H334 1 Gearbox C60-C73 G165-G193 1 Gearbox C267-C328 H394-H493 1 Gearbox C348-C432 G39-G46 1 Gearbox B107-B125 F182-F228 1 Gearbox A176-A204 H376-H470 1 Gearbox C376-C447 F371-F464 1 Gearbox A330-A380 F432-F497 1 Gearbox C263-C321 H398-H482 1 Gearbox B323-B375 H294-H347 1 Gearbox C207-C238 G484-G561 1 Gearbox C203-C238 F485-F572 1 Gearbox C469-C549 G396-G475 1 Gearbox A131-A152 F222-F264 1 Gearbox B266-B309 F485-F577
110000 Bricks 5500 Concrete 1567 Cut Stone 10 Pipe Segment
( 1 Large Gear, 17 Medium Gear, 6 Small Gear )
Spring Box: A50-A62 D132- D160 G380-G471, q9075 spring in hand DONE, gives about 3x per pull
TOWER MATS
Towers are built in a similar way as pumps. The construction tool will note how far away from a suitable location you are. You must be within 8 feet of a suitable location in order to place a construction site. Once placed, the construction site still may not work if it's not placed close enough to a pump or a connecting tower (it will say this and not let you add materials).
- Feb 3/10 updated
AMT NEEDED EACH | AMT NEEDED FOR 10 | AMT ON HAND AT SECOND STORAGE | PLEDGES |
1 Cistern | 10 | 11 | |
5 Copper Pipe | 50 | 61 | |
200 Black Raeli Tiles | 2000 | 1,914 | 4,244 CoTA |
100 White Raeli Tiles | 1000 | 3,028 | 10,000 CoTA |
50 Yellowish Raeli Tiles | 500 | 842 | 5,000 CoTA |
50 Reddish Raeli Tiles | 500 | 3,162 | 3,393 CoTA |
50 Greenish Raeli Tiles | 500 | 2,000 | 5,000 CoTA |
50 Blueish Raeli Tiles | 500 | 2,363 | 5,000 CoTA |
100 Concrete | 1,000 | 0 NEED MORE | |
20 Tar | 200 | 200 |
AMT NEEDED EACH | AMT ON HAND AT PUMP |
1 Cistern | |
5 Copper Pipe | |
200 Black Raeli Tiles | |
100 White Raeli Tiles | |
50 Yellowish Raeli Tiles | |
50 Reddish Raeli Tiles | |
50 Greenish Raeli Tiles | |
50 Blueish Raeli Tiles | |
100 Concrete | |
20 Tar | 1,496 |
TOWER MATS Upgrades
5000 bricks 200 concrete 150 cut stones 2 pipe segment <per tower) first 12 raised
Material that on hand that can be used. 3 Sledge Hammers 900 Medium stones
- Feb 3/10 Update
What is Needed | AMT ON HAND AT PUMP | Second Storage |
Bricks | 332 NEED MORE just bring from home | 86,860 (~0 Brick machines NEED TO BE RAN MORE) |
Cut Stone | 7012 need abit more | 0 need abit more |
Concrete | 3326 (168 bauxite, 700 gypsum, 922 Cement) NEED MORE | (234 Gravel + 96 cement)NEED MORE |
Pipe Segments | 0 NEED MORE | 0 NEED MORE |
TOWER Filler MATS Upgrades
What is Needed | Pump Storage |
Gold Wire 20 | 40 |
Titanium Sheeting : Stanless 6 | 128 |
Papryus Paper 22 | 44 |
Bolts 16 | 32 |
Washers 16 | 16 |
PROPOSED ROUTE
Coords | ID | Elevation | Owner | Passed | Bonus | |
871, 6373 | Pump | 0 | hilly | Sept. 14 | - | |
860, 6371 | 1 | 9'10" | Iy-Nefer | Sept. 14 | Focus | |
840, 6371 | 2 | 9'10" | jazmynn | Sept. 14 | Strength | |
820, 6371 | 3 | 9'10" | Injeru | Sept. 14 | Constitution | |
800, 6371 | 4 | 10'7" | Sesnut | Sept. 14 | Dexterity | |
789, 6353 | 5 | 1'6" | Mandy | Sept. 21 | Focus | |
769, 6353 | 6 | 1'6" | jaxum | Sept. 21 | Focus | |
749, 6353 | 7 | 1'6" | Khet | Sept. 21 | Speed , Watermelon | |
730, 6353 | 8 | 1'9" | Zog | Sept. 21 | Dexterity | |
710, 6353 | 9 | 2'9" | Yerbouti | Sept. 21 | Perception, Carrots | |
690, 6353 | 10 | 15'2" | inad | Sept. 28 | Dexterity, Peppers | |
670, 6353 | 11 | 30'9" | Alciphron | Sept. 28 | Dexterity | |
660, 6336 | 12 | 54'1" | Spicy | Oct. 11 | Dexterity | |
640, 6336 | 13 | 2'8" | hill | Oct. 11 | Strength | |
620, 6336 | 14 | 2'11" | Almelkehdes | Oct. 11 | Focus | |
600, 6336 | 15 | 2'9" | Toldy | Oct. 18 | Perception | |
580, 6336 | 16 | 47'5" | ysabeau | Oct. 18 | Dexterity | |
560, 6336 | 17 | 92'6" | zing | Oct. 25 | Speed | |
540, 6336 | 18 | 19'5" | Yendorhut | Nov. 1 | Strength | |
520, 6336 | 19 | 57'3" | Akmenotep | Nov. 1 | Strength | |
500, 6336 | 20 | 65'8" | Murtha | Nov. 1 | Endurance | |
480, 6336 | 21 | 13'6" | RatBoy | Nov. 1 | Constitution, 30 Leeks | |
460, 6336 | 22 | 45'2" | Djemba | Nov. 1 | Focus | |
440, 6336 | 23 | 4'2" | Lazybonz | Nov. 1 | Endurance | |
420, 6336 | 24 | 3'6" | Tamblack | Nov. 1 | Endurance | |
400, 6336 | 25 | 21'4" | Cyndi | Nov. 8 | Endurance | |
380, 6336 | 26 | 6'9" | Dionysius | Nov. 8 | Perception | |
360, 6336 | 27 | 23'6" | Binny | Nov. 8 | Speed, 24 Garlic | |
340, 6336 | 28 | 28'1" | Udjai | Nov. 8 | Focus | |
320, 6336 | 29 | 11'0" | TylerEdwin | Nov. 8 | Perception | |
300, 6336 | 30 | 9'10" | AlexisBelle | Nov. 8 | Strength | |
290, 6353 | 31 | 9'11" | lilac | Nov. 15 | Constitution | |
270, 6353 | 32 | 9'11" | emilyliz | Nov. 15 | Strength | |
260, 6370 | 33 | 9'11" | nebkhepure | Nov. 15 | Perception | |
240, 6370 | 34 | 9'10" | DustiTwister | Nov. 15 | Endurance, 24 Garlic | |
220, 6370 | 35 | 9'10" | Aphenro | Constitution | ||
200, 6370 | 36 | 36'5" | Gronk | Endurance | ||
190, 6388 | 37 | kuupid | Endurance | |||
170, 6388 | 38 | Teil | Perception, 24 Watermelon | |||
150, 6388 | 39 | Theresia | Dexterity, 24 cabbage | |||
130, 6388 | 40 | 15'8" | Gaara-Du-Desert | Perception | ||
110, 6388 | 41 | 9'11" | Kalmkitty | Perception | ||
90, 6388 | 42 | 9'11" | Pharohmoan | Dexterity | ||
70, 6388 | 43 | 14'9" | Nsu | Perception | ||
50, 6388 | 44 | 27'11" | SueVN | Dexterity | ||
30, 6388 | 45 | 21'5" | Nobody | Constitution | ||
10, 6388 | 46 | 10'0" | Narlee | Focus | ||
[-]10, 6388 | 47 | 10'0" | Alentisca | Dexterity, Bonus Leeks 23 | ||
[-]30, 6388 | 48 | 10'0" | Firegolem | Perception, Bonus Leeks 23 | ||
[-]50, 6388 | 49 | 19'1" | fahli | Endurance, Bonus leeks 24 limit of 300' pump | ||
[-]70, 6388 | 50 | 61'10" | AbuTaid (filler installed) | Speed, Garlic 24 (filler installed) | ||
[-]90, 6388 | 51 | 71'10" | Kessi | Constitution (filler installed) | ||
[-]110, 6388 | 52 | 78'8" | Renard | Dexterity, limit of 400' pump | ||
[-]120, 6405 | 53 | 187'9" | "Q'ed" Katarina | |||
[-]140, 6405 | 54 | 174'6" | ||||
[-]160, 6405 | 55 | 66'6" | ||||
[-]180, 6405 | 56 | 10'0" | ||||
[-]190, 6422 | 57 | 10'0" | ||||
[-]200, 6440 | 58 | 10'0" | ||||
[-]210, 6457 | 59 | 10'0" | ||||
[-]220, 6475 | 60 | 10'0" | ||||
[-]230, 6492 | 61 | 18'4" | ||||
[-]250, 6492 | 62 | 10'1" | ||||
[-]270, 6492 | 63 | 10'1" | ||||
[-]290, 6492 | 64 | |||||
[-]300, 6509 | 65 | 84'1" | ||||
[-]310, 6526 | 66 | 196'10" | Khyber Pass, 526' pump needed | |||
[-]330, 6526 | 67 | 181'2" | ||||
[-]340, 6544 | 68 | 130'3" | ||||
[-]350, 6562 | 69 | 127'11" | ||||
[-]360, 6579 | 70 | 35'11" | ||||
[-]380, 6579 | 71 | 15'7" | ||||
|
Warning: Default sort key "Adn Aquaduct Association" overrides earlier default sort key "Adn_Aquaduct_Association".
CISTERN UPGRADES
Each tower uses 1440 water per day, so a non-upgraded pump cistern (100,000 capacity) would have to be filled twice a week to fill a 20-tower aqueduct line. Upgrading the cistern to 200,000 would mean filling it once a week, to 400,000 twice a month, etc. Each pumping session would take longer of course, but we would have to do it less often. A 60-tower line to CCR with a capacity 1,000,000 cistern would have to be pumped once every ten days or so.
Mats required to upgrade to:
Update Sept 19/09CAPACITY | TAR | LEATHER | CANVAS | CABLE |
900,000 | Done | Done | Done | Done |
1,000,000 | Done | Done | Done | Done |
Amount on hand | 1,656 | 3,005 | 0 | 0 |