Mat | Amount Required | Points |
---|---|---|
Steel Wire for Tension Mechanism | 600 | 0.50 |
Copper Wire for Winding Mechanism | 600 | 0.25 |
Moon Steel for Waterproof Sheath | 120 | 10 |
Cistern | 1 | 100 |
White Raeli Tiles | 50,000 | 2 |
Greenish Raeli Tiles | 30,000 | 3 |
Yellowish Raeli Tiles | 30,000 | 3 |
Pinkish Raeli Tiles | 30,000 | 3 |
Black Raeli Tiles | 50,000 | 2 |
Any color of Raeli Tiles | 100,000 | 2 |
Rotproof, Rigid, Nontoxic Boards | 50,000 | 2 |
Gravel | 10,000 | 1 |
Cement | 600 | 15 |
Oyster Shell Marble | 100 | 75 |
Night Granite | 100 | 100 |
Grey Star Marble | 100 | 100 |
Cistern Upgrades
These are the costs for a 1 million size Cistern as per the T3 wiki.
Mat | Amount Required | Points |
---|---|---|
tar | 1800 | 1 |
leather | 2700 | 1 |
canvas | 2250 | 5 |
cable | 90 | 5 |
Pump Upgrade
Estimated pump upgrade costs based on the T3 wiki. Upgrade from 100 to 200:
Mat | Amount Required | Points |
---|---|---|
Brick | 30,000 | 1 |
Concrete | 1,500 | 1 |
cut_stone | 502 | 1 |
Gearbox | 20 | 1 |
Pipe Segment | 10 | 1 |
20 Towers
Estimated cost for 20 towers, without upgrades based on the T3 wiki.
Mat | Amount Required | Points |
---|---|---|
Cistern | 20 | 100 |
Copper_Pipe | 100 | 4 |
tar | 400 | 1 |
Black Raeli Tiles | 4000 | 2 |
White Raeli Tiles | 2000 | 2 |
Yellowish Raeli Tiles | 1000 | 3 |
Redish Raeli Tiles | 1000 | 3 |
Greenish Raeli Tiles | 1000 | 3 |
Bluish Raeli Tiles | 1000 | 3 |
Estimated Tower Upgrades
If needed, these are the estimated tower upgrade costs based on the T3 wiki.
Mat | Amount Required | Points |
---|---|---|
bricks | 70000 | 0.25 |
Gravel | 5,000 | 1 |
Cement | 300 | 15 |
cut_stone | 1500 | 2 |
Pipe Segment | 111 | 75 |