The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Guilds/SA Waterworks/Contributions

From A Tale in the Desert
Revision as of 21:08, 29 April 2009 by Robare (talk | contribs)
Jump to navigationJump to search

Pump Contributions

Please contact Aplus, Daniels, Diania, or Robare to have your contribution added.

Materials that are currently required for the building of the pump

Mat Amount Required Amount Collected
Steel Wire for Tension Mechanism 600 600
Copper Wire for Winding Mechanism 600 600
Moon Steel for Waterproof Sheath 120 120
Cistern 1 1
White Raeli Tiles 50,000 0
Greenish Raeli Tiles 30,000 750
Yellowish Raeli Tiles 30,000 750
Pinkish Raeli Tiles 30,000 0
Black Raeli Tiles 50,000 0
Any color of Raeli Tiles 100,000 0
Rotproof, Rigid, Nontoxic Boards 50,000 10,000
Concrete for Base 10,000 3,000
Oyster Shell Marble 100 0
Night Granite 100 0
Grey Star Marble 100 0


Cistern Upgrades

These are the costs for a 1 million size Cistern as per the T3 wiki.

Mat Amount Required Amount Collected
tar 1800 0
leather 2700 1000
canvas 2250 50
cable 90 0


Pump Upgrade

Estimated pump upgrade costs based on the T3 wiki. Upgrade from 100 to 200:

Mat Amount Required Amount Collected
Brick 30,000 0
Concrete 1,500 0
cut_stone 502 0
Gearbox 20 0
Pipe Segment 10 0


20 Towers

Estimated cost for 20 towers, without upgrades based on the T3 wiki.

Mat Amount Required Amount Collected
Cistern 20 2
Copper_Pipe 100 0
tar 400 0
Black Raeli Tiles 4000 0
White Raeli Tiles 2000 0
Yellowish Raeli Tiles 1000 0
Redish Raeli Tiles 1000 0
Greenish Raeli Tiles 1000 0
Bluish Raeli Tiles 1000 0


Estimated Tower Upgrades

If needed, these are the estimated tower upgrade costs based on the T3 wiki.

Mat Amount Required Amount Collected
bricks 70000 0
concrete 5000 0
cut_stone 1500 0
Pipe Segment 111 12


Member Contributions

Name Mats being worked on Finished (Yes:No) Completion Date
Daniels 120 Moonsteel Yes 04/19/09
Daniels 1 cistern Yes 04/19/09
diania 600 steel wire Yes 04/20/09
diania 600 copper wire Yes 04/20/09
Cali 3000 concrete Yes 04/29/2009
Aplus 12 Pipe Segment Yes 04/29/2009
Aplus 2 Cistern Yes 04/29/2009
Aplus 1000 Leather Yes 04/29/2009
Aplus 50 Canvas Yes 04/29/2009
Catlyn 10,000 treated boards Yes 04/29/2009
Catlyn 1500 yellow green tiles Yes 04/29/2009


Other Contributions

Record all other contributions here.

Name Mats Contributed Contribution Date Contribution Purpose
Daniels 100 boards, 1000 bricks, 10 cut stone 04/19/09 Small Warehouse
Aplus 300 boards, 3000 bricks, 30 cut stone 04/20/09 Small Warehouse x 3