The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Furnaces

From A Tale in the Desert
Revision as of 05:35, 27 December 2008 by Tlanthil (talk | contribs) (→‎Testing)
Jump to navigationJump to search

Bullet Furnace

Operation

Can load upto 5 charcoal, each charcoal provides 1 minute of additional Max FireTime.

It is possible to load less and start the reaction and then top it up, to a maximum of 5 over time.

it is a automatic process if you load max 5cc. just let it time out and collect.

Current "fire and forget" recipe is 50 ore, 5cc yields 1 metal.

Compression Furnace

Operation

  • Holds up to 500 ore
  • Holds up to 20cc
  • Burns 2cc per minute for a maximum of 10 minutes

Testing

  • 150 ore / 20 cc => 2 iron
  • 250 ore / 18 cc => 4 iron
  • 343 ore / 20 cc => 5 iron
  • 450 ore / 20 cc => 7 iron
  • 500 ore / 20 cc => 8 iron
  • 200 ore / 20 CC => 1 @ 1:40, 2 @ 5:00, 3 @ 8:20
  • 250 ore / 20 CC => 1 @ <1:07, 2 @ 2:30?, 3 @ 6:20, 4 @ 9:00 (save 2 CC opening early)
  • 500 ore / 20 CC => 1@0:20, 2@1:40, 3@3:00, 4@4:20, 5@5:40, 6@7:00, 7@:8:20, 8@9:40 (save 1 CC opening early)

Blast Furnace