The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Copper Pipe

From A Tale in the Desert
Revision as of 16:23, 15 February 2009 by Akmenotep (talk | contribs)
Jump to navigationJump to search
File:CopperPipe.png
Bulk 1
Weight 1

Copper pipe is made in a forge. Each copper pipe requires 5 copper and takes 5 minutes to cool.

Uses

Required By

Aqueduct Tower, Chemical Bath, Guilds/Water in DeNile, Persephone Furnace, Test of Dancing Waters

Produced By

Master's Forge, Student's Forge