The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
Hades Furnace
From A Tale in the Desert
Jump to navigationJump to search
Source
This building becomes available after the Metallurgy 2 technology is learned at a University of Harmony.
Cost
- 2 Aluminum Plate
- 5000 Boards
- 5000 Clay Bricks
- 100 Copper Sheeting
- 30 Crucibles
- 500 Cut Stone
- 20 Fine Glass Pipe
- 75 Iron Bars
- 75 Iron Strap
- 25 Pulley
- 300 Steel Sheeting
- 3 Thermometers
- 15 Tin Sheeting
Notes
- Holds 1000 Petroleum
- Max runtime is 20d 9h 47m 45s
- Burns 49 petrol per day (49 ticks per day)
Yield
20000| 3 |240 |1,5 hours |83.33 |1.20% 20000 |4 |300 |2 hours |66.67 |1.50% 20000 |5 |380 |2,5 hours |52.63 |1.90% 20000 |6 |440 |3 hours |45.45 |2.20% 20000 |7 |500 |3,5 hours |40.00 |2.50% 20000 |8 |580 |4 hours |34.48 |2.90% 20000 |9 640 |4,5 hours |31.25 |3.20% 20000 |10 680 |5 hours |29.41 |3.40% 20000 |12 800 6 hours 25.00 4.00% 20000 |13 860 6,5 hours 23.26 4.30% 20000 |14 920 7 hours(+4min) 21.74 4.60% 20000 |16 1000 8 hours 20.00 5.00% 20000 |47 1960 23 hours 10.20 9.80% 20000 |48 1980 23,5 hours 10.10 9.90% 20000 |49 2000 24 hours 10.00 10.00% 20000 |98 2660 48 hours 7.52 13.30% 20000 |64 2280 1d 7h 33m 8.77 11.40% 20000 |87 2560 1d 18h 35m 7.81 12.80% 20000 |131 2920 2d 16h 6.85 14.60% 20000 |147 3000 72 hours 6.67 15.00% 20000 |179 3140 3d 15h 6.37 15.70% 20000 |196 3200 96 hours 6.25 16.00% 20000 |198 3200 4d 1h 6.25 16.00% 20000 |228 3300 4d 15h 6.06 16.50% 20000 |252 3340 5d 3h 30m 5.99 16.70% 20000 |319 3460 6d 12h 15m 5.78 17.30% 20000 |401 3560 8d 4h 9m 5.62 17.80% 20000 |472 3620 9d 15h 15m 5.52 18.10% 20000 |472 3700 12d 11h 37m 5.41 18.50% 20000 |779 3760 15d 21h 23m 5.32 18.80% 20000 |888 3800 18d 3h 4m 5.26 19.00% 20000 |999 3820 20d 9h 19m 5.24 19.10% 20000 |1000 3820 20d 9h 47m 5.24 19.10%Ore Used | Petrol Used | Metal Yield | Time opened | Ore Cost/Metal | % Yield |
---|