The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
Guilds/SA Waterworks/PointsValues
From A Tale in the Desert
Materials that are currently required for the building of the pump
Mat | Amount Required | Points per Deben |
---|---|---|
Steel Wire for Tension Mechanism | 600 | 0.50 |
Copper Wire for Winding Mechanism | 600 | 0.25 |
Moon Steel Sheeting for Waterproof Sheath | 120 | 80 |
Cistern | 1 | 10 |
White Raeli Tiles | 50,000 | 2 |
Greenish Raeli Tiles | 30,000 | 3 |
Yellowish Raeli Tiles | 30,000 | 3 |
Pinkish Raeli Tiles | 30,000 | 3 |
Black Raeli Tiles | 50,000 | 2 |
Any color of Raeli Tiles | 100,000 | 2 |
Rotproof, Rigid, Nontoxic Boards | 50,000 | 2 |
Concrete | 10,000 | 2 |
Oyster Shell Marble | 100 | 75 |
Night Granite | 100 | 100 |
Grey Star Marble | 100 | 100 |
Cistern Upgrades
These are the costs for a 1 million size Cistern as per the T3 wiki.
Mat | Amount Required | Points per Deben |
---|---|---|
tar | 1800 | 1 |
leather | 2700 | 1 |
canvas | 2250 | 5 |
cable | 90 | 5 |
Pump Upgrade
Estimated pump upgrade costs based on the T3 wiki. Upgrade from 100 to 200:
Mat | Amount Required | Points per Deben |
---|---|---|
Brick | 30,000 | 0.25 |
Concrete | 1,500 | 2 |
cut_stone | 502 | 1 |
Small_Gear | 200 | 10 |
Medium_Gear | 120 | 70 |
Large_Gear | 5 | 500 |
Pipe Segment | 10 | 10 |
20 Towers
Estimated cost for 20 towers, without upgrades based on the T3 wiki.
Mat | Amount Required | Points per Deben |
---|---|---|
Cistern | 20 | 10 |
Copper_Pipe | 100 | 4 |
tar | 400 | 1 |
Black Raeli Tiles | 4000 | 2 |
White Raeli Tiles | 2000 | 2 |
Yellowish Raeli Tiles | 1000 | 3 |
Redish Raeli Tiles | 1000 | 3 |
Greenish Raeli Tiles | 1000 | 3 |
Bluish Raeli Tiles | 1000 | 3 |
Estimated Tower Upgrades
If needed, these are the estimated tower upgrade costs based on the T3 wiki.
Mat | Amount Required | Points per Deben |
---|---|---|
bricks | 70000 | 0.25 |
Concrete | 5,000 | 2 |
cut_stone | 1500 | 1 |
Pipe Segment | 500 | 10 |
Extras
Mat | Amount Required | Points per Deben/Building |
---|---|---|
Small Warehouse | 25 | 290 |
Barometer | 1 | 500 |