The Wiki for Tale 6 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
Difference between revisions of "Obelisk Construction 1"
From ATITD6
Jump to navigationJump to searchLine 82: | Line 82: | ||
==Projected formulas== | ==Projected formulas== | ||
− | * Bricks: | + | * Bricks: x*x*2 + x*19 |
− | * Boards: x*x/5 + 2 | + | * Boards: x*x/5 + x*2 |
* Slate: x*x/23 + x/2 | * Slate: x*x/23 + x/2 | ||
* Dried Flax: x*x/17 + x/5 | * Dried Flax: x*x/17 + x/5 | ||
− | * Clay: x*x/15 + 3 | + | * Clay: x*x/15 + x*3 |
* Linen: x*x/51 + x | * Linen: x*x/51 + x | ||
* Flint: x*x/45 + x/8 | * Flint: x*x/45 + x/8 |
Revision as of 01:55, 20 December 2011
English | Deutsch | français | magyar | Türkçe |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Obelisk Construction, Level 1 allows one to build a Desert Obelisk for the Test of the Obelisk.
Trivia
- A 100 cubit Desert Obelisk costs as much to build (plus the cost of a Small Construction Site) as opening the technology in a single region. This milestone is likely to be achieved in many regions long before these regions have opened the technology.
Desert Obelisk Materials by Size
Height | Bricks | Boards | Slate | Dried Flax | Clay | Linen | Flint | T6 Confirmed |
---|---|---|---|---|---|---|---|---|
7 | 231 | 23 | 5 | 3 | 24 | 7 | 1 | |
8 | 280 | 28 | 6 | 4 | 28 | 9 | 2 | |
9 | 333 | 34 | 7 | 5 | 32 | 10 | 2 | |
10 | 390 | 40 | 9 | 7 | 36 | 11 | 3 | |
15 | 735 | 75 | 16 | 16 | 60 | 19 | 6 | |
20 | 1180 | 120 | 27 | 27 | 86 | 27 | 10 | |
30 | 2370 | 240 | 54 | 58 | 150 | 47 | 23 | |
40 | 3960 | 400 | 89 | 102 | 226 | 71 | 40 | |
50 | 5950 | 600 | 133 | 157 | 316 | 99 | 61 | |
60 | 8340 | 840 | 186 | 223 | 420 | 130 | 87 | |
65 | 9685 | 975 | 215 | 261 | 476 | 147 | 101 | |
70 | 11130 | 1120 | 248 | 302 | 536 | 166 | 116 | |
80 | 14320 | 1440 | 318 | 392 | 666 | 205 | 152 | |
90 | 17910 | 1800 | 397 | 494 | 810 | 248 | 191 | |
100 | 21900 | 2200 | 484 | 608 | 966 | 296 | 234 | |
110 | 26290 | 2640 | 581 | 733 | 1136 | 347 | 281 | |
120 | 31080 | 3120 | 686 | 871 | 1320 | 402 | 335 | |
130 | 36270 | 3640 | 799 | 1020 | 1516 | 461 | 391 | |
140 | 41860 | 4200 | 922 | 1180 | 1726 | 524 | 452 | |
150 | 47850 | 4800 | 1053 | 1353 | 1950 | 591 | 518 | |
200 | 83800 | 8400 | 1839 | 2392 | 3266 | 984 | 913 | |
250 | 129750 | 13000 | 2842 | 3726 | 4916 | 1475 | 1419 | |
300 | 185700 | 18600 | 4063 | 5354 | 6900 | 2064 | 2037 | |
1000 | 2,019,000 | 202,000 | 43,978 | 59,023 | 69,666 | 20,607 | 22,347 |
Projected formulas
- Bricks: x*x*2 + x*19
- Boards: x*x/5 + x*2
- Slate: x*x/23 + x/2
- Dried Flax: x*x/17 + x/5
- Clay: x*x/15 + x*3
- Linen: x*x/51 + x
- Flint: x*x/45 + x/8