The Wiki for Tale 6 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Difference between revisions of "Blast Furnace"

From ATITD6
Jump to navigationJump to search
m
 
(10 intermediate revisions by 4 users not shown)
Line 1: Line 1:
 +
{{languages}}
 +
<br>
 
{{Template:BuildingInfo|image=Blast_Furnace.png|size=9x13|where=[[where::Compound]]|description=Large scale ore smelting.}}  
 
{{Template:BuildingInfo|image=Blast_Furnace.png|size=9x13|where=[[where::Compound]]|description=Large scale ore smelting.}}  
 +
A '''Blast Furnace''' is a moderately-advanced type of [[furnace]], used to smelt ore into [[metal]].
 +
 +
One run of a Blast Furnace takes 10 minutes.  It can convert 1000 ore and 10 [[charcoal]] into 60 metal.  However, output is halved (max 30 metal) if the furnace is allowed to run to the end.  Thus, for optimal results, you must be around to open the furnace just before the 10-minute mark.
 +
 +
If you want to use a fire-and-forget method with a Blast Furnace, then you can load the furnace with only 9 charcoal, so that the furnace runs out of fuel before the 10-minute mark.  This method will convert a batch of 1000 ore into 54 metal.
 +
  
 
== Source ==
 
== Source ==
 
This building becomes available after you have learned the [[requires::Metallurgy]] tech.
 
This building becomes available after you have learned the [[requires::Metallurgy]] tech.
 +
 +
Compare all [[Furnace | Furnaces]].
 +
  
 
== Cost ==
 
== Cost ==
Line 15: Line 26:
  
 
== Use ==
 
== Use ==
* Smelt [[Copper Ore]] to produce [[produces::Copper]]
+
* Smelt [[ Ore]] to produce [[produces::Metal]]
* Smelt [[Iron Ore]] to produce [[produces::Iron]]
+
 
* Smelt [[Tin Ore]] to produce [[produces::Tin]]
 
  
 
Uses [[fuel::Charcoal]] for fuel.
 
Uses [[fuel::Charcoal]] for fuel.
Line 27: Line 37:
 
*30 metal after 10 mins
 
*30 metal after 10 mins
 
*60 metal if opened just before 10 mins
 
*60 metal if opened just before 10 mins
 +
*Note that the 60 metal recipe is twice more CC efficient than [[Gyration Cell]].
 +
FaF = Fire and Forget
 +
{| border="1"
 +
! Ore Used!! CC Used !! Metal Yield !! Time opened !! Ore Cost/Metal !! CC/Metal !! CC/Ore !! Metal Yield/1000 Ore !! CC Cost/1000 ore !! Net Gain
 +
|-
 +
| 10
 +
| 9
 +
| 1
 +
| FaF
 +
| 10.00
 +
| 9.0
 +
| 0.9
 +
| 100.0
 +
| 900.0
 +
|
 +
|-
 +
| 28
 +
| 9
 +
| 2
 +
| FaF
 +
| 14.00
 +
| 4.5000
 +
| 0.3214
 +
| 71.43
 +
| 321.43
 +
|
 +
|-
 +
| 491
 +
| 10
 +
| 29
 +
| 9:55
 +
| 16.93
 +
| 0.3448
 +
| 0.0204
 +
| 59.06
 +
| 20.37
 +
|
 +
|-
 +
| 500
 +
| 9
 +
| 27
 +
| FaF
 +
| 18.52
 +
| 0.3333
 +
| 0.0180
 +
| 54.00
 +
| 18.00
 +
|
 +
|-
 +
| 968
 +
| 10
 +
| 58
 +
| 9:55
 +
| 16.69
 +
| 0.1724
 +
| 0.0103
 +
| 59.92
 +
| 10.33
 +
|
 +
|-
 +
| 990
 +
| 10
 +
| 59
 +
| 9:56
 +
| 16.78
 +
| 0.1695
 +
| 0.0101
 +
| 59.60
 +
| 10.10
 +
|
 +
|-
 +
| 991
 +
| 9
 +
| 54
 +
| FaF
 +
| 18.351
 +
| 0.1667
 +
| 0.0091
 +
| 54.49
 +
| 9.08
 +
|
 +
|-
 +
| 1000
 +
| 9
 +
| 54
 +
| FaF
 +
| 18.52
 +
| 0.1667
 +
| 0.0090
 +
| 54.00
 +
| 9.00
 +
|
 +
|-
 +
| 1000
 +
| 10
 +
| 60
 +
| 9:55
 +
| 16.67
 +
| 0.1667
 +
| 0.0100
 +
| 60.00
 +
| 10.00
 +
|
 +
|-
 +
| 1000
 +
| 10
 +
| 30
 +
| FaF
 +
| 33.33
 +
| 0.3333
 +
| 0.0100
 +
| 30.00
 +
| 10.00
 +
|
 +
|-
 +
 +
 +
 +
|}
 +
 +
  
 
{{MetalworkNav | Furnaces}}
 
{{MetalworkNav | Furnaces}}
  
 
[[Category:Buildings]]
 
[[Category:Buildings]]

Latest revision as of 12:41, 30 July 2014

English Deutsch français magyar Türkçe


Blast Furnace.png
Size 9x13
Where Compound



A Blast Furnace is a moderately-advanced type of furnace, used to smelt ore into metal.

One run of a Blast Furnace takes 10 minutes. It can convert 1000 ore and 10 charcoal into 60 metal. However, output is halved (max 30 metal) if the furnace is allowed to run to the end. Thus, for optimal results, you must be around to open the furnace just before the 10-minute mark.

If you want to use a fire-and-forget method with a Blast Furnace, then you can load the furnace with only 9 charcoal, so that the furnace runs out of fuel before the 10-minute mark. This method will convert a batch of 1000 ore into 54 metal.


Source

This building becomes available after you have learned the Metallurgy tech.

Compare all Furnaces.


Cost

Use


Uses Charcoal for fuel.

Operation

  • Holds up to 1000 ore
  • Holds up to 10 Charcoal
  • Burns 1 Charcoal per minute for a maximum of 10 minutes
  • 30 metal after 10 mins
  • 60 metal if opened just before 10 mins
  • Note that the 60 metal recipe is twice more CC efficient than Gyration Cell.

FaF = Fire and Forget

Ore Used CC Used Metal Yield Time opened Ore Cost/Metal CC/Metal CC/Ore Metal Yield/1000 Ore CC Cost/1000 ore Net Gain
10 9 1 FaF 10.00 9.0 0.9 100.0 900.0
28 9 2 FaF 14.00 4.5000 0.3214 71.43 321.43
491 10 29 9:55 16.93 0.3448 0.0204 59.06 20.37
500 9 27 FaF 18.52 0.3333 0.0180 54.00 18.00
968 10 58 9:55 16.69 0.1724 0.0103 59.92 10.33
990 10 59 9:56 16.78 0.1695 0.0101 59.60 10.10
991 9 54 FaF 18.351 0.1667 0.0091 54.49 9.08
1000 9 54 FaF 18.52 0.1667 0.0090 54.00 9.00
1000 10 60 9:55 16.67 0.1667 0.0100 60.00 10.00
1000 10 30 FaF 33.33 0.3333 0.0100 30.00 10.00