The Wiki for Tale 6 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
Difference between revisions of "SinaiCentral/Projects/Aqueduct"
m (→The Route) |
|||
(52 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
==Intro== | ==Intro== | ||
− | The '''Aqueduct Pumping Station Depot''' is located at <b>2644,4907</b>. From there, we will | + | The '''Aqueduct Pumping Station Depot''' is located at <b>2644,4907</b>. From there, we will build towers headed East towards Sinai Central main campus. |
<br> | <br> | ||
<br> | <br> | ||
Line 7: | Line 7: | ||
* <s>Collecting Material for Pumping Station</s> - Yay! | * <s>Collecting Material for Pumping Station</s> - Yay! | ||
− | * | + | * Collecting Material for additional Towers |
* Collecting Material for Upgrades - Tower Raises and Cistern Upgrades | * Collecting Material for Upgrades - Tower Raises and Cistern Upgrades | ||
− | * Collecting other needed materials - Pipe Segments, Cisterns | + | * Collecting other needed materials - Pipe Segments, Cisterns, Gypsum and Bauxite for cement - for concrete. |
+ | |||
+ | == Status == | ||
+ | |||
+ | The Pump is built and we have started building towers! Please contact Myn or Waerloga to build your tower. | ||
+ | |||
+ | The Cistern's current capacity is 300,000 | ||
+ | |||
+ | The current height of the pump is 200. | ||
== The Route == | == The Route == | ||
+ | |||
+ | <br> | ||
+ | |||
+ | A complete list of the towers and their bonuses can be found at: [[SinaiCentral/Projects/Aqueduct/TowersList]] | ||
+ | |||
+ | <br> | ||
+ | |||
{{CondMap| | {{CondMap| | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |contentonly= | + | {{:Maps/Test of Life/Sinai|contentonly=yes}} |
− | |lat= | + | |lat=2980|lon=4847|zoom=6|width=800|height=452 |
− | + | |contentonly={{{contentonly|no}}}|{{{2}}}}} | |
+ | |||
+ | To edit this map, go to: [[Maps/Test of Life/Sinai]] | ||
+ | |||
+ | ==== Tower Legend ==== | ||
+ | |||
+ | {{:Maps/Aqueduct/Legend|contentonly=yes}} | ||
==How you can help with the Aqueduct== | ==How you can help with the Aqueduct== | ||
Line 78: | Line 47: | ||
== Aqueduct Pumping Station == | == Aqueduct Pumping Station == | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
'''NOTE: This raise may or may not be needed to add additional towers.'''<br> | '''NOTE: This raise may or may not be needed to add additional towers.'''<br> | ||
{{ResTechnology|Raise Aqueduct Pump Stage 2| state=collapsed| | {{ResTechnology|Raise Aqueduct Pump Stage 2| state=collapsed| | ||
− | {{ResResource|Gearbox | + | {{ResResource|Gearbox C82-C99 H14-H17|0|1}} |
− | {{ResResource|Gearbox | + | {{ResResource|Gearbox A176-A215 H102-H120|0|1}} |
− | {{ResResource|Gearbox | + | {{ResResource|Gearbox C152-C176 G458-G573|0|1}} |
− | {{ResResource|Gearbox | + | {{ResResource|Gearbox B331-B401 F476-F571|0|1}} |
− | {{ResResource|Gearbox | + | {{ResResource|Gearbox A318-A369 F118-F138|0|1}} |
− | {{ResResource|Gearbox | + | {{ResResource|Gearbox B213-B266 H487-H570|0|1}} |
− | {{ResResource|Gearbox | + | {{ResResource|Gearbox B172-B198 G435-G539|0|1}} |
− | {{ResResource|Gearbox | + | {{ResResource|Gearbox B151-B178 G85-G99|0|1}} |
− | {{ResResource|Gearbox | + | {{ResResource|Gearbox A390-A464 F102-F123|0|1}} |
− | {{ResResource|Gearbox | + | {{ResResource|Gearbox B429-B493 G354-G432|0|1}} |
− | {{ResResource|Gearbox | + | {{ResResource|Gearbox A356-A417 H92-H114|0|1}} |
− | {{ResResource|Gearbox | + | {{ResResource|Gearbox B172-B206 H215-H262|0|1}} |
− | {{ResResource|Gearbox | + | {{ResResource|Gearbox A438-A504 G211-G245|0|1}} |
− | {{ResResource|Gearbox | + | {{ResResource|Gearbox C413-C508 H268-H319|0|1}} |
− | {{ResResource|Gearbox | + | {{ResResource|Gearbox B357-B436 H305-H375|0|1}} |
− | {{ResResource|Gearbox | + | {{ResResource|Gearbox B433-B524 F242-F278|0|1}} |
− | {{ResResource|Gearbox | + | {{ResResource|Gearbox B134-B155 H497-H611|0|1}} |
− | {{ResResource|Gearbox | + | {{ResResource|Gearbox A148-A182 G36-G44|0|1}} |
− | {{ResResource|Gearbox | + | {{ResResource|Gearbox B46-B54 F217-F265|0|1}} |
− | {{ResResource|Gearbox | + | {{ResResource|Gearbox A436-A536 F477-F577|0|1}} |
{{ResResource|Bricks|50000|50000}} | {{ResResource|Bricks|50000|50000}} | ||
{{ResResource|Concrete|2500|2500}} | {{ResResource|Concrete|2500|2500}} | ||
Line 138: | Line 78: | ||
== Aqueduct Towers == | == Aqueduct Towers == | ||
− | |||
− | |||
− | |||
− | |||
− | |||
Line 161: | Line 96: | ||
{{ResResource|Straw|0|1000}} | {{ResResource|Straw|0|1000}} | ||
}} | }} | ||
+ | |||
+ | '''NOTE: The following is just an initial estimate. Costs will vary based on elevations and bad math skills.'''<br> | ||
{{ResTechnology|Raise Towers 21 to 40 by 100| state = expand| | {{ResTechnology|Raise Towers 21 to 40 by 100| state = expand| | ||
Line 172: | Line 109: | ||
{{ResTechnology|General Stock| state=expand| | {{ResTechnology|General Stock| state=expand| | ||
− | {{ResResource|Bricks | + | {{ResResource|Bricks (On-site, unallocated) |281250|500000}} |
− | {{ResResource|Cistern| | + | {{ResResource|Cistern|29|50}} |
− | {{ResResource|Concrete| | + | {{ResResource|Concrete|3658|5000}} |
− | {{ResResource|Cut Stone| | + | {{ResResource|Cut Stone|5403|6400}} |
− | {{ResResource|Pipe Segment| | + | {{ResResource|Pipe Segment|207|300}} |
− | {{ResResource|Small Gears| | + | {{ResResource|Small Gears|385|600}} |
− | {{ResResource|Medium Gears| | + | {{ResResource|Medium Gears|83|200}} |
}} | }} | ||
Line 187: | Line 124: | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
{{ResTechnology|Cistern 400,000|state=collapsed| | {{ResTechnology|Cistern 400,000|state=collapsed| | ||
Line 251: | Line 182: | ||
{{ResResource|Straw|1000|1000}} | {{ResResource|Straw|1000|1000}} | ||
}} | }} | ||
+ | |||
+ | <br> | ||
+ | |||
+ | {{ResTechnology|Raise Aqueduct Pump Stage 1| state=collapsed| | ||
+ | {{ResResource|Gearbox A87-A105 H210-H252|1|1}} | ||
+ | {{ResResource|Gearbox C29-C35 H402-H482|1|1}} | ||
+ | {{ResResource|Gearbox B401-B501 F121-F139|1|1}} | ||
+ | {{ResResource|Gearbox B243-B301 G429-G536|1|1}} | ||
+ | {{ResResource|Gearbox A310-A366 H24-H29|1|1}} | ||
+ | {{ResResource|Gearbox A400-A484 F419-F482|1|1}} | ||
+ | {{ResResource|Gearbox B329-B408 G348-G418|1|1}} | ||
+ | {{ResResource|Gearbox B42-B50 G19-G22|1|1}} | ||
+ | {{ResResource|Gearbox C347-C427 F434-F516|1|1}} | ||
+ | {{ResResource|Gearbox C431-C522 G53-G65|1|1}} | ||
+ | {{ResResource|Gearbox B490-B598 G69-G83|1|1}} | ||
+ | {{ResResource|Gearbox A257-A301 F90-F112|1|1}} | ||
+ | {{ResResource|Gearbox C322-C370 G164-G195|1|1}} | ||
+ | {{ResResource|Gearbox B309-B362 G70-G81|1|1}} | ||
+ | {{ResResource|Gearbox A299-A365 H466-H536|1|1}} | ||
+ | {{ResResource|Gearbox A204-A247 H427-H534|1|1}} | ||
+ | {{ResResource|Gearbox C243-C287 G477-G553|1|1}} | ||
+ | {{ResResource|Gearbox B106-B131 F10-F12|1|1}} | ||
+ | {{ResResource|Gearbox B424-B492 H350-H427|1|1}} | ||
+ | {{ResResource|Gearbox B70-B84 F443-F536|1|1}} | ||
+ | {{ResResource|Bricks|30000|30000}} | ||
+ | {{ResResource|Concrete|1500|1500}} | ||
+ | {{ResResource|Cut Stone|500|500}} | ||
+ | {{ResResource|Pipe Segment|10|10}} | ||
+ | }} | ||
<br> | <br> | ||
Line 268: | Line 228: | ||
{{ResResource|Canvas|250|250}} | {{ResResource|Canvas|250|250}} | ||
{{ResResource|Cable|10|10}} | {{ResResource|Cable|10|10}} | ||
+ | }} | ||
+ | |||
+ | <br> | ||
+ | |||
+ | {{ResTechnology|Cistern 300,000|state=collapsed| | ||
+ | {{ResResource|Tar|400|400}} | ||
+ | {{ResResource|Leather|600|600}} | ||
+ | {{ResResource|Canvas|500|500}} | ||
+ | {{ResResource|Cable|20|20}} | ||
}} | }} |
Latest revision as of 13:04, 21 September 2012
Intro
The Aqueduct Pumping Station Depot is located at 2644,4907. From there, we will build towers headed East towards Sinai Central main campus.
We are currently working on...
Collecting Material for Pumping Station- Yay!- Collecting Material for additional Towers
- Collecting Material for Upgrades - Tower Raises and Cistern Upgrades
- Collecting other needed materials - Pipe Segments, Cisterns, Gypsum and Bauxite for cement - for concrete.
Status
The Pump is built and we have started building towers! Please contact Myn or Waerloga to build your tower.
The Cistern's current capacity is 300,000
The current height of the pump is 200.
The Route
A complete list of the towers and their bonuses can be found at: SinaiCentral/Projects/Aqueduct/TowersList
This map uses the CondMap template, if this map imports data from other maps please edit those. Please see Maps for further details and links to all raw data pages
To edit this map, go to: Maps/Test of Life/Sinai
Tower Legend
Str | Dex | End | Spd | Cabbage | Carrot | Cucumber | Eggplant | Garlic | |
Con | Foc | Per | Future | Leeks | Onions | Peppers | Watermelon | Multiple | Pump |
How you can help with the Aqueduct
Donation WHs are located at the pump site @ 2644, 4907. Please update this page AFTER materials have been delivered , or chat an Elder to let them know a donation has been dropped off so the page can be updated.
PLEASE, PLEASE, do NOT stash materials for this project anywhere else but AT the depot. Lets try to keep this all together in one place.
The Following tables below are all the material required.
Aqueduct Pumping Station
NOTE: This raise may or may not be needed to add additional towers.
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Aqueduct Towers
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
NOTE: The following is just an initial estimate. Costs will vary based on elevations and bad math skills.
| ||||||||||||||||||||||||||||||||||||||||||||||||||
General
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Upgrading the cistern
A newly constructed pump has a cistern that holds 100,000 water. It can be upgraded in increments of 100,000.
| ||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||
Completed Portions
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||