The Wiki for Tale 6 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Difference between revisions of "Six Ponds"

From ATITD6
Jump to navigationJump to search
Line 4: Line 4:
 
Iron Mine 555, -792
 
Iron Mine 555, -792
 
There is a Small WH and CP with 2 Compression Furnaces in between the mines.
 
There is a Small WH and CP with 2 Compression Furnaces in between the mines.
 +
 
Public tin mine at 1960,2555
 
Public tin mine at 1960,2555
 +
 
Public lead mine at 870,-1425
 
Public lead mine at 870,-1425
 +
 +
Our Sand Quartz Mine: -367, 6700 CCR
 +
 +
Our Sand Topaz Mine: 4283, -745 CotS
  
 
== Limestone Operations ==
 
== Limestone Operations ==

Revision as of 17:52, 26 December 2011

Mining Operation

Copper Mine 566, -788 Iron Mine 555, -792 There is a Small WH and CP with 2 Compression Furnaces in between the mines.

Public tin mine at 1960,2555

Public lead mine at 870,-1425

Our Sand Quartz Mine: -367, 6700 CCR

Our Sand Topaz Mine: 4283, -745 CotS

Limestone Operations

CP at 1690,-1560

Vegestables

Onions 13 at 3,18 Onions 4 at camp