The Wiki for Tale 6 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
Difference between revisions of "Persephone Furnace"
From ATITD6
Jump to navigationJump to search (→Yield) |
|||
Line 44: | Line 44: | ||
{| border="1" | {| border="1" | ||
− | ! Ore Used!! Petrol Used !! Metal Yield !! Time opened !! Ore Cost/Metal | + | ! Ore Used!! Petrol Used !! Metal Yield !! Time opened !! Ore Cost/Metal !! Fuel Cost/Metal |
|- | |- | ||
| 20000 | | 20000 | ||
Line 51: | Line 51: | ||
| 24 hours (1 day ) | | 24 hours (1 day ) | ||
| 14.93 | | 14.93 | ||
+ | | 2% | ||
|- | |- | ||
| 20000 | | 20000 | ||
Line 57: | Line 58: | ||
| 48 hours (2 days) | | 48 hours (2 days) | ||
| 10.00 | | 10.00 | ||
+ | | 2.8% | ||
|- | |- | ||
| 20000 | | 20000 | ||
Line 63: | Line 65: | ||
| 72 hours (3 days) | | 72 hours (3 days) | ||
| 8.33 | | 8.33 | ||
+ | | 3.5% | ||
|- | |- | ||
| 20000 | | 20000 | ||
Line 69: | Line 72: | ||
| 120 hours (5 days) | | 120 hours (5 days) | ||
| 6.99 | | 6.99 | ||
+ | | 4.8% | ||
|- | |- | ||
| 20000 | | 20000 | ||
Line 75: | Line 79: | ||
| 385 hours(16 days and 1 hour) | | 385 hours(16 days and 1 hour) | ||
| ~5.618 | | ~5.618 | ||
+ | | 12.6% | ||
|- | |- | ||
|} | |} |
Revision as of 18:13, 26 January 2012
Size | N/A |
Where | Medium Construction Site |
Source
This building becomes available after the Metallurgy 2 technology is learned at a University of Harmony.
Compare all Furnaces.
Cost
- 1 Aluminum Plate
- 2500 Boards
- 2500 Clay Bricks
- 20 Copper Pipe
- 50 Copper Sheeting
- 15 Crucibles
- 250 Cut Stone
- 20 Fine Glass Pipe
- 500 Gypsum
- 40 Iron Bars
- 40 Iron Strap
- 200 Lime
- 10 Pulley
- 150 Steel Sheeting
- 10 Thermometers
- 10 Tin Sheeting
- 2000 Water in Jugs
Built on a Medium Construction Site.
Use
Uses Petroleum for fuel.
Yield
Burns 28 petrol per day (28 ticks per day)
Ore Used | Petrol Used | Metal Yield | Time opened | Ore Cost/Metal | Fuel Cost/Metal |
---|---|---|---|---|---|
20000 | 28 | 1340 | 24 hours (1 day ) | 14.93 | 2% |
20000 | 56 | 2000 | 48 hours (2 days) | 10.00 | 2.8% |
20000 | 84 | 2400 | 72 hours (3 days) | 8.33 | 3.5% |
20000 | 140 | 2860 | 120 hours (5 days) | 6.99 | 4.8% |
20000 | 450 | 3560 | 385 hours(16 days and 1 hour) | ~5.618 | 12.6% |
|