The Wiki for Tale 6 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Difference between revisions of "Hatch of Steel"

From ATITD6
Jump to navigationJump to search
Line 3: Line 3:
 
{{Template:BuildingInfo|image=HatchofSteel.PNG‎ |size=n/a|where=[[where::Small Construction Site]]|description=Used during the Test of the Covered Cartouche.}}
 
{{Template:BuildingInfo|image=HatchofSteel.PNG‎ |size=n/a|where=[[where::Small Construction Site]]|description=Used during the Test of the Covered Cartouche.}}
  
 +
== Cost ==
 +
* 20 [[requires::Copper Wire]]
 +
* 11 [[requires::Slate]]
 +
* 1 [[requires::Iron Bar]]
 +
* 1 [[requires::Copper Sheeting]]
 +
* 15 [[requires::Oil]]
 +
* 2 [[requires::Cut Stone]]
 +
 +
 +
Built in a [[requires::Small Construction Site]].
 +
 +
== Upgrading ==
 +
Once built, the Hatch of Steel may be expanded. The costs from level 1 are:
 +
 +
{|  border="1"
 +
!Size!! Copper Sheeting !! Copper Wire !! Cut Stone!! Iron Bars !! Oil !! Slate
 +
|-
 +
| 10 || 1 || 9 || 1 || 1 || 6|| 4
 +
|-
 +
| 20 || 1 || 18 || 2 || 1 || 13 || 9
 +
|-
 +
| 30 || 2 || 37 || 4 || 2 || 27 || 19
 +
|-
 +
| 40 || 3 || 56 || 6 || 3 || 41 || 29
 +
|-
 +
| 50 || 5 || 94 || 10 || 5 || 69 || 49
 +
|-
 +
| 60 || 7 || 132 || 14 || 7 || 97 || 69
 +
|-
 +
| 70 || 11 || 208 || 22 || 11 || 153 || 109
 +
|-
 +
| 80 || 15 || 284 || 30 || 15 || 209 || 149
 +
|-
 +
| 90 || 23 || 463 || 46 || 23 || 321 || 229
 +
|-
 +
| 100 || 31 || 588 || 62 || 31 || 433 || 309
 +
|-
 +
| 200 || 1023 || 19436 || 2046 || 1023 || 14321 || 10229
 +
|}
  
 
[[Category:Cartouche]]
 
[[Category:Cartouche]]

Revision as of 00:47, 27 October 2012

Back to Cartouche Buildings
Back to Test of the Covered Cartouche

HatchofSteel.PNG
Size N/A
Where Small Construction Site




Cost


Built in a Small Construction Site.

Upgrading

Once built, the Hatch of Steel may be expanded. The costs from level 1 are:

Size Copper Sheeting Copper Wire Cut Stone Iron Bars Oil Slate
10 1 9 1 1 6 4
20 1 18 2 1 13 9
30 2 37 4 2 27 19
40 3 56 6 3 41 29
50 5 94 10 5 69 49
60 7 132 14 7 97 69
70 11 208 22 11 153 109
80 15 284 30 15 209 149
90 23 463 46 23 321 229
100 31 588 62 31 433 309
200 1023 19436 2046 1023 14321 10229