The Wiki for Tale 6 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Difference between revisions of "Persephone Furnace"

From ATITD6
Jump to navigationJump to search
Line 44: Line 44:
  
 
{| border="1"
 
{| border="1"
! Ore Used!! Petrol Used !! Metal Yield !! Time opened !! Ore Cost/Metal
+
! Ore Used!! Petrol Used !! Metal Yield !! Time opened !! Ore Cost/Metal !! Fuel Cost/Metal
 
|-
 
|-
 
| 20000
 
| 20000
Line 51: Line 51:
 
| 24 hours (1 day )
 
| 24 hours (1 day )
 
| 14.93
 
| 14.93
 +
| 2%
 
|-  
 
|-  
 
| 20000
 
| 20000
Line 57: Line 58:
 
| 48 hours (2 days)
 
| 48 hours (2 days)
 
| 10.00
 
| 10.00
 +
| 2.8%
 
|-
 
|-
 
| 20000
 
| 20000
Line 63: Line 65:
 
| 72 hours (3 days)
 
| 72 hours (3 days)
 
| 8.33
 
| 8.33
 +
| 3.5%
 
|-
 
|-
 
| 20000
 
| 20000
Line 69: Line 72:
 
| 120 hours (5 days)
 
| 120 hours (5 days)
 
| 6.99
 
| 6.99
 +
| 4.8%
 
|-
 
|-
 
| 20000
 
| 20000
Line 75: Line 79:
 
| 385 hours(16 days and 1 hour)
 
| 385 hours(16 days and 1 hour)
 
| ~5.618
 
| ~5.618
 +
| 12.6%
 
|-  
 
|-  
 
|}
 
|}

Revision as of 18:13, 26 January 2012

Delimiter Large.png
Tale 4 information
  • Information on this page has been lifted from Tale 4
  • Do not assume any information on this page is valid for Tale 5
  • Please update this page so that it becomes the relevant information for Tale 5
  • If you can confirm information is valid for Tale 5, place the symbol T6N.png next to that item with the {{5ok}} tag
  • Once this page is fully updated with Tale 5 information, please remove this stub
Delimiter Large.png


Persephone.png
Size N/A
Where Medium Construction Site




Source

This building becomes available after the Metallurgy 2 technology is learned at a University of Harmony.

Compare all Furnaces.


Cost

Built on a Medium Construction Site.


Use

Uses Petroleum for fuel.


Yield

Burns 28 petrol per day (28 ticks per day)

Ore Used Petrol Used Metal Yield Time opened Ore Cost/Metal Fuel Cost/Metal
20000 28 1340 24 hours (1 day ) 14.93 2%
20000 56 2000 48 hours (2 days) 10.00 2.8%
20000 84 2400 72 hours (3 days) 8.33 3.5%
20000 140 2860 120 hours (5 days) 6.99 4.8%
20000 450 3560 385 hours(16 days and 1 hour) ~5.618 12.6%