The Wiki for Tale 7 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
Difference between revisions of "Guilds/ZAQ"
(→Route) |
|||
Line 124: | Line 124: | ||
== Pump Coordinator == | == Pump Coordinator == | ||
− | During the week of | + | During the week of 5/1 to 5/8, our pump co-ordinator is '''Shemei'''. |
Keeping the pump full is the collective responsibility of the guild members. The pump coordinator has the oversight role of monitoring pump capacity and cajoling members to pump as needed. At a minimum, the coordinator should check the pump capacity (by pumping, naturally) and report it in guild chat on Sunday or Monday after passes, midweek, and on Friday/Saturday before passes. | Keeping the pump full is the collective responsibility of the guild members. The pump coordinator has the oversight role of monitoring pump capacity and cajoling members to pump as needed. At a minimum, the coordinator should check the pump capacity (by pumping, naturally) and report it in guild chat on Sunday or Monday after passes, midweek, and on Friday/Saturday before passes. |
Revision as of 01:39, 2 May 2016
Welcome to the zFree Aqueduct Guild (ZAQ)
We manage the aqueduct line in central River Plains. Although zFree is primarily responsible for creating and maintaining the aqueduct line, ZAQ had membership open to anyone who lives, works, plays, or at least thinks fondly of River Plains. Our guild hall is near the first tower at 1384, 3446. Membership is now closed. We have 97 towers constructed, with 3 reserved for members who have not built yet.
Route
Towers with vegetable bonuses are marked with a '*'. Note that in many cases the soil may be depleted, so you may not be able to always grow there.
All Herb methods have been tried (thanks, Neena!)
This map uses the CondMap template, if this map imports data from other maps please edit those. Please see Maps for further details and links to all raw data pages
Pump Coordinator
During the week of 5/1 to 5/8, our pump co-ordinator is Shemei.
Keeping the pump full is the collective responsibility of the guild members. The pump coordinator has the oversight role of monitoring pump capacity and cajoling members to pump as needed. At a minimum, the coordinator should check the pump capacity (by pumping, naturally) and report it in guild chat on Sunday or Monday after passes, midweek, and on Friday/Saturday before passes.
archive costs/ chat logs
Reserved Towers
The following people may build on our line if and when they wish:
- neverdie
- Jaecen
- Neena
Cistern Upgrade Cost
| ||||||||||||||||||||||||||||||||||||||||||||||||||