The Wiki for Tale 7 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Difference between revisions of "Project Management"

From ATITD7
Jump to navigationJump to search
(Created page with "Project Management allows the player to build Construction Sites which require large amounts of resources to be placed inside it before it is completed. === Level One === {{7ok}...")
 
 
(10 intermediate revisions by 4 users not shown)
Line 1: Line 1:
Project Management allows the player to build Construction Sites which require large amounts of resources to be placed inside it before it is completed.
+
{{Languages}}
 +
[[File:School.png|right|250px]]
  
=== Level One ===
+
==Source==
{{7ok}} Level One Project Management is obtained from [[School of Harmony]] at player Level 1. It costs 2 [[Canvas|Canvas]] and 6 [[Rope|Rope]] to learn. Allows building a [[Small Construction Site]].
+
'''Project Management''' is a multi-school skill.  
  
=== Level Two ===
+
==Cost==
{{6ok}}Level two costs 4 [[Canvas]] and 12 [[Rope]] to learn at [[School of Leadership]] at player Level 7. Allows building a [[Medium Construction Site]].
 
  
=== Level Three ===
+
*1st Degree (level 1) - Obtained from a [[School of Harmony]] to build a [[produces::Small Construction Site]]
Level three costs 200 [[Canvas]], 300 [[Glass Rods]], 100 [[Rope]] and 300 [[Papyrus Paper]] to learn at [[School of Architecture]]. Allows building a [[Plinth Construction Site]] for [[Throne_of_Pharaoh|Throne of Pharaoh]] Costs 4 canvas 16 rope to build.
+
** 2 [[requires::Canvas]]
 +
** 6 [[requires::Rope]]
 +
 +
*2nd Degree (level 7) - Obtained from a [[School of Leadership]] to build a [[produces::Medium Construction Site]]
 +
** 4 [[requires::Canvas]]
 +
** 12 [[requires::Rope]]
  
[[Category:Skills]][[Category:Unconfirmed]]
+
*3rd Degree (level 14) - Obtained from a [[School of Architecture]] to build a [[produces::Plinth Construction Site]] once you've started the [[Throne of Pharaoh]] test.  {{7}}
 +
** 200 [[requires::Canvas]]
 +
** 300 [[requires::Glass Rods]]
 +
**100 [[requires::Rope]]
 +
**300 [[requires::Papyrus Paper]]
 +
 
 +
==Use==
 +
Allows the player to build Construction Sites which require large amounts of resources to be placed inside it before it is completed.
 +
 
 +
{{RequiredBy}}
 +
[[Category:Skills]]

Latest revision as of 13:20, 18 October 2016

English Deutsch français magyar Türkçe
School.png

Source

Project Management is a multi-school skill.

Cost

Use

Allows the player to build Construction Sites which require large amounts of resources to be placed inside it before it is completed.

Required By

Test of Funerary Temple, Large House, Test of the Library of Alexandria, Medium Construction Site, Medium House, Test of the Obelisk, Small Construction Site, Small House, Tent