The Wiki for Tale 7 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
Difference between revisions of "Guilds/Sinai Central/Aqueduct"
Evilsnowman (talk | contribs) |
|||
Line 21: | Line 21: | ||
Current Pump height is: <b>400</b> (3 Raises) | Current Pump height is: <b>400</b> (3 Raises) | ||
− | Current number of Towers: <b> | + | Current number of Towers: <b>7</b> |
Spring Box installed?: <b>Yes, Quality 9558</b> | Spring Box installed?: <b>Yes, Quality 9558</b> |
Revision as of 10:08, 5 June 2016
Intro
The Aqueduct Pumping Station Depot is located at 2644,4907. From there, we will build towers headed East towards Sinai Central main campus. We have planned for 60 towers to get us to SC Campus.
Veggie Bonus
Towers tested to Tower 7, Evilsnowman 22:48, 4 June 2016 (EST)
No Cabbage
No Onion
No Carrot
Status: BUILDING TOWERS!
We are building towers! - Please contact Myn, EvilSnowman or Flowbar to build yours today!
Current Cistern capacity is: 500,000 (5 upgrades applied).
Current Pump height is: 400 (3 Raises)
Current number of Towers: 7
Spring Box installed?: Yes, Quality 9558
The Route
A complete list of the towers and their bonuses can be found at: Guilds/Sinai_Central/Aqueduct/TowersList
This map uses the CondMap template, if this map imports data from other maps please edit those. Please see Maps for further details and links to all raw data pages
To edit this map, go to: Maps/Life/Sinai
Tower Legend
Str | Dex | End | Spd | Cabbage | Carrot | Cucumber | Eggplant | Garlic | |
Con | Foc | Per | Future | Leeks | Onions | Peppers | Watermelon | Multiple | Pump |
How you can help with the Aqueduct
Collection warehouses will be located at the pump site @ 2644, 4907. Please update this page only AFTER materials have been delivered to the Depot, or chat an Elder to let them know a contiribution has been dropped off so the page can be updated.
PLEASE, PLEASE, do NOT stash materials for this project anywhere else but AT the Depot or the Transfer warehouse at SC Campus. Lets try to keep this all together in one place.
The following tables below are all the material required.
General Stock
- Gear stock does not need to be replenished at this time.
- 70k bricks taken from General Stock to feed unplanned Pump Raise, Stage 3 (I mean, might as well, eh?) - to be replaced eventually
- Last updated: Myn 13:24, 4 June 2016 (EST)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Future Upgrades
| ||||||||||||||||||||||||||||||||||||||||||||||||||
Completed Portions
The Completed Portions Archive can be found HERE