The Wiki for Tale 7 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
Difference between revisions of "User:Mudkest/projects"
From ATITD7
Jump to navigationJump to searchm (→Buildings) |
m |
||
Line 56: | Line 56: | ||
*15 kettles | *15 kettles | ||
**15 iron pots<font color="green">(300 iron/wax)</font> 150 minutes master casting box) needs turning into iron pots 5 already made in WH | **15 iron pots<font color="green">(300 iron/wax)</font> 150 minutes master casting box) needs turning into iron pots 5 already made in WH | ||
− | ** | + | **<font color="green">60 copper sheeting</font> |
= concrete(no direct use, but needed eventually) = | = concrete(no direct use, but needed eventually) = |
Revision as of 17:48, 25 October 2015
gems needed
- huge saphire(mechanics)
huge topaz(desc)- huge ruby(desc)
huge quarts(desc)
general stuff (always) needed
copper, iron, wood, cc, tin, resin, silt, firebricks, bricks, clay, jugs
- resins
- as much possible
- stout palm(brass)
- towering palm(steel)
- fern palm(bronze)
- royal palm(pewter)
- hawtorn(moon steel)
- not quite as much(but still as much possible)
- umbrella palm(sun steel)
- folded birch(thot's metal)
- Pratyeka Tree(water metal)
- no big rush, but still nice to stockpile
- cerulan blue(metal blue)
- oil palm(octec's alloy)
- as much possible
Buildings
- reactory upgrades: 120 steel sheeting(40 steel)
- 2 barrel vices+cooperage skill*2
- 8 brass plate(30 mins(60 cc) per plate, 730 cc/4 hours total if in 1 go MCB)160 brass done
- 12 copper sheeting DONE
- 100 copper straps, DONE (Plus extras for barrels)
greenhouse
- 96 sheetglass
- 400 potash(187 ash done)
- 2400 wood(80 kettle runs)
- 200 lime
- 1500 dirt
- 18 canvas
- 400 potash(187 ash done)
- 3 thermometers
- 1200 dried papy(690 done)
- 1200 dried flax
- 1152 limestone
- 2400 wood
kettles
- 15 kettles
- 15 iron pots(300 iron/wax) 150 minutes master casting box) needs turning into iron pots 5 already made in WH
- 60 copper sheeting
concrete(no direct use, but needed eventually)
- 60 cement done
- 1000 gravel needed
cooking 3
49 salt