The Wiki for Tale 7 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Local Projects

From ATITD7
Jump to navigationJump to search

Deep Well - Completed

Steam Shovel - Completed

Aqueduct Pump is UP and Running

Cistern upgraded to 200000

block
Tar
400
/
400
(0)
100%
Leather
600
/
600
(0)
100%
Canvas
100
/
500
(400)
20%
Steel Cable
20
/
20
(0)
100%
block

To raise the Pumping Station we need

1 Gearbox A234-A293 H274-H326 - DONE
1 Gearbox C277-C324 F50-F60
1 Gearbox B137-B158 F432-F514
1 Gearbox A262-A317 G272-G321 - DONE
6000 Bricks                  
300 Concrete                  
100 Cut Stone                  
2 Pipe Segment

We raise it by the segments of 20 atm and it lets us build 4 towers.

Gearboxes for the next upgrade. If you make some pls just add "DONE" by the gearbox.


1 Gearbox A387-A453 H456-H565 - DONE
1 Gearbox A41-A49 F387-F449 - DONE
1 Gearbox B127-B151 F269-F331 - DONE
1 Gearbox B63-B72 G100-G119 - DONE

Aqueduct Towers

IMPORTANT!!! Before building your tower please contact Zea or Joey. The route is planned. Please don't improvise.


  • Aqueduct Construction Site (1 canvas, 4 rope, 50 straw)
  • 1 Cistern
  • 5 Copper Pipe
  • 20 Tar
  • 200 Black Raeli Tiles
  • 100 White Raeli Tiles
  • 50 Yellowish Raeli Tiles
  • 50 Redish Raeli Tiles
  • 50 Greenish Raeli Tiles
  • 50 Blueish Raeli Tiles
  • 100 Concrete

To raise your tower you will need approximately (these numbers will change as the line grows.)

  • 4000 Bricks
  • 80 Concrete
  • 60 Cut Stones
  • 5 Pipe Segments


Guild-owned ovens can make all colors needed except blueish which we arrange for everyone who wants to build a tower with us.

We will keep the WH at the smelter for all sorts of tiles. If you want something you can just take or swap with white, black, reddish or yellow green. That will help us to get more towers built faster.

Please try to get rest of the materials for your tower.

For making and baking the cisterns (350 clay and 100 wood to fire, making time on pottery deck is 1h and baking time 2h) and pipe segments (100 clay and 100 wood to fire, making time 1h and baking 4h). We have pottery deck and vault kiln at the smelter. Eventually we need to raise the pump and towers so if you can collect a bits materials for that also would be great.


Back