The Wiki for Tale 7 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
This was built off of random.org; we'd like to try to build on Friday, Jan 22 and Saturday, Jan 23. If for some reason, you can't be around during that time, please let us know and/or indicate it here. If you have no care about build order, scratch that here as well. The plan is to build once we have all of the pump tiles.
And please, make sure you've started the Test of Life!
Each Tower MUST be personally owned, please do not guild or make public your construction site. The towers owner is the last person who adds the last material.
Yellow Green & Green Yellow Tiles NEED to be used as yellow, not green
Build procedure...
Elder grabs the mats from the warehouses, leads the builder to the site. Tear down the bonfire that marks the approximate build location.
Elder gives the mats to the builder.
To build a tower requires the materials for an Aqueduct Construction Site (1 canvas, 4 rope, 50 straw) plus:
1 Cistern
5 Copper Pipe
20 Tar
200 Black Raeli Tiles
100 White Raeli Tiles
50 Yellowish Raeli Tiles <=== given last
50 Reddish Raeli Tiles
50 Greenish Raeli Tiles
50 Blueish Raeli Tiles
100 Concrete Once the tower is build, please raise to max height allowed. Tell the elder what the raising costs are.
Istwan - Built
Tedra - Built
Spicy - Built
Anax - Built
Eranu - Built
MissBarbara - Built
Aereon - Built
Taemon - Built
Tjutenkamen - Built
Balthazarr - Built
Challen - Built
Sandman - Built
Xanulin - Built
Rahu - Built
Mbizi - Built
Traak - Built
Arame - Built
Kiara - Built
DaSpozz - Built
Sandle - Built
Acenith - Built
Shu - Built
Tilana - Built
Donk79 - Built
RamDamDar - Built
(open)
(open)
(open)
(open)
(open)
(open) <=== Phase II (alts at the end)
(open)
(open)
(open)
(open)
Burney
MrB
Baltharina
Raia
Balthazar
Phase 2 Materials List
When the pump is being upgraded, nothing else can be done with the pump. If you abandon the upgrade any materials loaded are LOST.
The gearbox requirements MAY change, do not pre-make gearboxes for pump raisings.
1000 leather, pipe segments, gravel work, 2000+ tiles from mbizi
450 REDish Tiles - Spicy
400 REDish Tiles - Tjutenkamen
22,600 bricks- 10 canvas, 500 straw, 40 rope, 200 tar - Shu
50 Small Gears - Mbizi
Moon Steel Sheeting - GRMGN
Brass small gears and iron medium gears... all of them - Traak and Daspozz
Tiles, Pipe segments - LGA
Map
This map uses the CondMap template, if this map imports data from other maps please edit those. Please see Maps for further details and links to all raw data pages