The Wiki for Tale 5 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
Difference between revisions of "Sterope Public Works"
From ATITD5
Jump to navigationJump to searchLine 63: | Line 63: | ||
** 200 [[requires::Bearings]] | ** 200 [[requires::Bearings]] | ||
** 300 [[requires::Oil]] | ** 300 [[requires::Oil]] | ||
− | + | * 1 Vault Kiln | |
* 4 Brick Machines | * 4 Brick Machines | ||
*** 50 [[requires::Boards]] | *** 50 [[requires::Boards]] |
Revision as of 01:02, 8 November 2010
Sterope Public Works (SPW)
We are located in Sterope 1958, -2121, near the ULead. If you wish to help improve the public works and/or see new buildings that we don't have please /chat Takhetu or Shayra.
Completed Projects
Name of CP | Coords | Building Type | Upgrades | Usable by | Quantity |
---|---|---|---|---|---|
BRICK N CLAY | 1957,-2114 | Imp Brick Racks | All | Public | 36 |
Pottery Wheel | All | Public | 36 | ||
True Kiln | All | Public | 25 | ||
WOOD SHOP | 1957,-2124 | Carpentry Shop | Blades | Public | 25 |
FLAX HOUSE | 1966,-2124 | Small Distaff | None | Public | 10 |
Rock Saw | All | Public | 24 | ||
Mason's Bench | All | Public | 12 | ||
Hackling Rake | All | Public | 2 | ||
Hand Loom | All | Public | 2 | ||
METALWORKS | 1950,-2124 | Master's Forge | All | Public | 4 |
Student's Forge | All | Public | 12 | ||
Master's Casting Box | All | Public | 4 | ||
Student's Casting Box | All | Public | 6 | ||
Charcoal Hearth | All | Public | 8 | ||
Charcoal Oven | All | Public | 8 |
Current Projects
Stash mats in warehouse at 1954 -2111
Future Projects
Name of CP | Coords | Building Type | Upgrades | Usable by | Quantity |
---|---|---|---|---|---|
Brick N Clay
- 24 Improved Kiln
- 1 Pottery Deck
- 1 Vault Kiln
- 4 Brick Machines
- 50 Boards
- 40 Concrete
- 40 Bearings
- 4 Iron Bar
- 4 Copper Sheeting
- 4 Small Gear
- 2 Medium Gear
- Brick Machine Upgrades (base and hopper)
- 4 Copper Sheeting
- 300 Concrete
- 50 Boards
- Brick Machine Upgrades (base and hopper)
Flax
- 8 Large Distaffs
- 5 Flax Hammocks
- 4 Greenhouses
- 2 Flax Gin upgraded, tuned
Wood Shop
- 2 Sawmills
- 1 Wood Treatment Tank
- 20 Steel
- 25 Copper Straps
- 35 Glass Pipe
- 1 Thermometer
Rock N Egypt
- 1 Gearbox Assembly Table
- 6 Paper Presses
- 40 Cut Stone
- 1 Pinch Roller
- 4 Medium Gears
- 200 Oil
- 12 Drying Hammocks for wet linen
Grub Shack
- 3 Kitchens
- 4 Marble Tubs upgraded
- 1 Clinker Vat (Charcoal)
- 1 Clinker Vat (Petroleum)
- 1 Toxin Kitchen
CHEMS ()
- 1 Barrel Grinder
- 1 Star Rack