Jump to navigationJump to searchLine 29: | Line 29: | ||
* All boards are cut and treatment has started | * All boards are cut and treatment has started | ||
* All quarries are built and quarrying should be done in a few days | * All quarries are built and quarrying should be done in a few days | ||
+ | <br><br> | ||
= Items that will take the most time to do = | = Items that will take the most time to do = |
Revision as of 17:24, 13 March 2011
Pump Mats
There are warehouse(s) at -2442 6262 for stashing project mats
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Pump Notes:
- Moon Steel is made and should be made into sheets in the next couple of days
- Copper wire will be made at the same time as the Moon Steel sheets
- All boards are cut and treatment has started
- All quarries are built and quarrying should be done in a few days
Items that will take the most time to do
- Tiles - 290,000 of them for the pump alone
- Concrete - Stir parties and gravel making parties will be needed
Tower Mats
Since the route has been surveyed, the assumption is for 10 towers, raising them an average of 50 feet and no elevation changes
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||