The Wiki for Tale 5 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
Difference between revisions of "Meropian Water Works"
From ATITD5
Jump to navigationJump to searchLine 2: | Line 2: | ||
Pump is to be built at -2439 6258 (there is a brick rack at this spot) | Pump is to be built at -2439 6258 (there is a brick rack at this spot) | ||
+ | |||
+ | = Donation Warehouse at the Merope CS = | ||
+ | The Warehouse is located at -1610 7610, thank you!! | ||
= Pump Mats = | = Pump Mats = | ||
− | There are warehouses at -2442 6262 for stashing project mats | + | There are warehouses at the pump site (-2442 6262) for stashing project mats |
<div style='float:left;padding:8px'> | <div style='float:left;padding:8px'> | ||
{{ResTechnology|Proposed pump -2439 6258|state=expanded| | {{ResTechnology|Proposed pump -2439 6258|state=expanded| |
Revision as of 17:55, 16 April 2011
Pump is to be built at -2439 6258 (there is a brick rack at this spot)
Donation Warehouse at the Merope CS
The Warehouse is located at -1610 7610, thank you!!
Pump Mats
There are warehouses at the pump site (-2442 6262) for stashing project mats
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Pump Notes:
- The treated boards are in Zoteps Balance of Goods to save building 2 more warehouses
Tile Notes
- Need 290,000 of them for the pump alone + another 5000 for 10 towers
- Thanks to the people who have donated tiles for our project
- Jaylenaeybarre
- Philadelphia
- Robare
Tower Mats
Since the route has not been surveyed, the assumption is for 10 towers, raising them an average of 50 feet and no elevation changes
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Tower Notes:
- The route of towers needs to be surveyed and agreed on