The Wiki for Tale 5 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
Difference between revisions of "Project Management"
From ATITD5
Jump to navigationJump to search (Allows the building of construction sites for large outdoor projects.) |
|||
(5 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
− | |||
− | |||
Project Management allows the player to build Construction Sites which require large amounts of resources to be placed inside it before it is completed. | Project Management allows the player to build Construction Sites which require large amounts of resources to be placed inside it before it is completed. | ||
− | |||
− | |||
− | |||
=== Level One === | === Level One === | ||
− | Level One Project Management is obtained from School of Harmony at player Level 1. It costs 2 [[Canvas|Canvas]] and 6 [[Rope|Rope]] to learn. Allows building a [[Small Construction Site]]. | + | {{5ok}} Level One Project Management is obtained from [[School of Harmony]] at player Level 1. It costs 2 [[Canvas|Canvas]] and 6 [[Rope|Rope]] to learn. Allows building a [[Small Construction Site]]. |
=== Level Two === | === Level Two === | ||
− | Level two costs 4 [[Canvas]] and 12 [[Rope]] to learn at [[School of Leadership]]. Allows building a [[Medium Construction Site]]. | + | {{5ok}}Level two costs 4 [[Canvas]] and 12 [[Rope]] to learn at [[School of Leadership]] at player Level 7. Allows building a [[Medium Construction Site]]. |
+ | |||
+ | [[Category:Skills]][[Category:Unconfirmed]] | ||
+ | |||
− | + | {{Languages}} |
Latest revision as of 15:50, 27 June 2011
Project Management allows the player to build Construction Sites which require large amounts of resources to be placed inside it before it is completed.
Level One
Level One Project Management is obtained from School of Harmony at player Level 1. It costs 2 Canvas and 6 Rope to learn. Allows building a Small Construction Site.
Level Two
Level two costs 4 Canvas and 12 Rope to learn at School of Leadership at player Level 7. Allows building a Medium Construction Site.