The Wiki for Tale 5 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Difference between revisions of "Guilds/Alpha/Current Projects"

From ATITD5
Jump to navigationJump to search
Line 7: Line 7:
 
|-
 
|-
 
| [[Deep Well]]      || 200 [[Rope]], 400 [[Boards]], 300 [[Nails]], 20 [[Screw Gear]], 500 [[Oil]], 2000 [[Leather]] ||  
 
| [[Deep Well]]      || 200 [[Rope]], 400 [[Boards]], 300 [[Nails]], 20 [[Screw Gear]], 500 [[Oil]], 2000 [[Leather]] ||  
|-
 
| 2 [[Gyration Cell]] ||  1000 Boards(DONE), 500 Clay DONE, 250 [[Concrete]], 50 [[Copper Sheeting]] DONE, 12 [[Crucibles]] DONE, 20 [[Glass Pipe]], 100 Leather DONE, 50 [[Moon Steel]] (DONE), 10 Pulleys (DONE), 25 [[Tin Sheeting]] DONE || numbers are for each
 
 
|-
 
|-
 
| [[Paper Press]] || 40 cut stone, 1 [[pinch roller]] , 4 [[med gears]], 200 oil || 2 up
 
| [[Paper Press]] || 40 cut stone, 1 [[pinch roller]] , 4 [[med gears]], 200 oil || 2 up

Revision as of 18:59, 26 September 2010

http://www.atitd.org/wiki/tale5/Alpha

Name Cost Notes
Hades Furnace 2 Aluminum Plate DONE, 5000 Boards DONE, 5000 Clay Bricks, 100 Copper Sheeting, 30 Crucibles DONE, 500 Cut Stone, 24 Pulley DONE, 20 Fine Glass PipeDONE, 75 Iron Bars, 75 Iron Strap, 300 Steel Sheeting, 3 Thermometer, 15 Tin Sheeting
Deep Well 200 Rope, 400 Boards, 300 Nails, 20 Screw Gear, 500 Oil, 2000 Leather
Paper Press 40 cut stone, 1 pinch roller , 4 med gears, 200 oil 2 up
Water Mine 24 Glass Pipes, 1 Large Gear, 4 Copper Straps, 12 Pulleys