The Wiki for Tale 5 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Difference between revisions of "Taygete Lifers/mats"

From ATITD5
Jump to navigationJump to search
Line 16: Line 16:
 
   {{Material| Any color of Raeli Tiles | 74729 | 100000|| }}(Zoser, Femi, Casino, Cassi 90k, Fez 3.1k, Jazz 6.7k, Zfree 8863, Matk 5k)
 
   {{Material| Any color of Raeli Tiles | 74729 | 100000|| }}(Zoser, Femi, Casino, Cassi 90k, Fez 3.1k, Jazz 6.7k, Zfree 8863, Matk 5k)
 
   {{Material| Rotproof, Rigid, Nontoxic Boards | 30000 | 50000 ||}}All boards cut, 30k treated. Fez
 
   {{Material| Rotproof, Rigid, Nontoxic Boards | 30000 | 50000 ||}}All boards cut, 30k treated. Fez
   {{Material| Concrete | 1000 | 10000 ||}} ''[[Cement]]''  '''600/600''',    ''[[Gravel]]''  0/10000 <br> If anyone interested in helping make gravel ... contact Jazmynn I have over 100 meds ready to smash for concrete,<br> Cement covered by Fez, 1000 concrete Fez
+
   {{Material| Concrete | 10000 | 10000 ||}} ''[[Cement]]''  '''600/600''',    ''[[Gravel]]''  0/10000 <br>kraes smash donated 4k gravel, casino, femi, and zoser donated 9500 gravel<br>Casino Femi and zoser made 13.5k concrete <br> Cement covered by Fez, 1000 concrete Fez
 
   {{Material| Oyster Shell Marble | 100 | 100 ||}}Zoser, Femi, Casino, Cassi donated all 300 marble
 
   {{Material| Oyster Shell Marble | 100 | 100 ||}}Zoser, Femi, Casino, Cassi donated all 300 marble
 
   {{Material| Night Granite | 100 | 100 ||}}
 
   {{Material| Night Granite | 100 | 100 ||}}

Revision as of 03:28, 16 December 2010

Back to main page


Aqueduct Pump


block
Steel Wire
600
/
600
(0)
100%
Naia
Copper Wire
600
/
600
(0)
100%
Jazz
Moon Steel Sheeting
120
/
120
(0)
100%
Zoser
Cistern
1
/
1
(0)
100%
Fez
White Raeli Tiles
41664
/
50000
(8336)
83%
stashed, Pawnee, Fez, 4k Akilla, Zfree 1400, jazz 298
Greenish Raeli Tiles
30000
/
30000
(0)
100%
5k stored, Naia. 3.5K Ten, 5452 Fez, 5000 Matk, 2.6k jazz, Zfree 562
Yellowish Raeli Tiles
20038
/
30000
(9962)
66%
Tribisha (Yellow Green), Zfree 3152
Pinkish Raeli Tiles
30000
/
30000
(0)
100%
Fez (4165 tiles), Zfree 10486
Black Raeli Tiles
44353
/
50000
(5647)
88%
(Zoser, Femi, Casino, Cassi 10k, Zfree 21143)
Any color of Raeli Tiles
74729
/
100000
(25271)
74%
(Zoser, Femi, Casino, Cassi 90k, Fez 3.1k, Jazz 6.7k, Zfree 8863, Matk 5k)
Rotproof, Rigid, Nontoxic Boards
30000
/
50000
(20000)
60%
All boards cut, 30k treated. Fez
Concrete
10000
/
10000
(0)
100%
Cement 600/600, Gravel 0/10000
kraes smash donated 4k gravel, casino, femi, and zoser donated 9500 gravel
Casino Femi and zoser made 13.5k concrete
Cement covered by Fez, 1000 concrete Fez
Oyster Shell Marble
100
/
100
(0)
100%
Zoser, Femi, Casino, Cassi donated all 300 marble
Night Granite
100
/
100
(0)
100%
Grey Star Marble
100
/
100
(0)
100%
block

Pump raising materials

Needed for adding more towers than an original 20 max


block
Bricks
0
/
30000
(30000)
0%
Concrete
0
/
1500
(1500)
0%
Cut Stone
500
/
500
(0)
100%
Pipe Segments
0
/
10
(10)
0%
Gear Boxes
0
/
20
(20)
0%
block
block
Bricks
0
/
50000
(50000)
0%
Concrete
0
/
2500
(2500)
0%
Cut Stone
0
/
734
(734)
0%
Pipe Segments
0
/
10
(10)
0%
Gear Boxes
0
/
20
(20)
0%
block
block
Bricks
0
/
70000
(70000)
0%
Concrete
0
/
3500
(3500)
0%
Cut Stone
0
/
1034
(1034)
0%
Pipe Segments
0
/
10
(10)
0%
Gear Boxes
0
/
20
(20)
0%
block
block
Bricks
0
/
90000
(90000)
0%
Concrete
0
/
4500
(4500)
0%
Cut Stone
0
/
1300
(1300)
0%
Pipe Segments
0
/
10
(10)
0%
Gear Boxes
0
/
20
(20)
0%
block


Cistern Upgrades

Our goal is to upgrade the cistern to hold 1 million units of water.

block
Tar
200
/
200
(0)
100%
Leather
0
/
300
(300)
0%
Canvas
0
/
250
(250)
0%
Cable
0
/
10
(10)
0%
block
block
Tar
400
/
400
(0)
100%
Leather
0
/
600
(600)
0%
Canvas
0
/
500
(500)
0%
Cable
0
/
20
(20)
0%
block
block
Tar
600
/
600
(0)
100%
Leather
0
/
900
(900)
0%
Canvas
0
/
750
(750)
0%
Cable
0
/
30
(30)
0%
block
block
Tar
800
/
800
(0)
100%
Leather
0
/
1200
(1200)
0%
Canvas
0
/
1000
(1000)
0%
Cable
0
/
40
(40)
0%
block
block
Tar
1000
/
1000
(0)
100%
Leather
0
/
1500
(1500)
0%
Canvas
0
/
1250
(1250)
0%
Cable
0
/
50
(50)
0%
block
block
Tar
1200
/
1200
(0)
100%
Leather
0
/
1800
(1800)
0%
Canvas
0
/
1500
(1500)
0%
Cable
0
/
60
(60)
0%
block
block
Tar
1400
/
1400
(0)
100%
Leather
0
/
2100
(2100)
0%
Canvas
0
/
1750
(1750)
0%
Cable
0
/
70
(70)
0%
block
block
Tar
1600
/
1600
(0)
100%
Leather
0
/
2400
(2400)
0%
Canvas
0
/
2000
(2000)
0%
Cable
0
/
80
(80)
0%
block
block
Tar
1800
/
1800
(0)
100%
Leather
0
/
2700
(2700)
0%
Canvas
0
/
2250
(2250)
0%
Cable
0
/
90
(90)
0%
block




Water Towers

Materials for the first 25 towers.

block
Pipe Segment
86
/
125
(39)
68%
5/tower estimated
Fez
Cistern
5
/
25
(20)
20%
1/tower
Fez, Naia
Copper Pipe
0
/
125
(125)
0%
5/tower
Concrete
0
/
2500
(2500)
0%
100/tower
Black tiles
0
/
5000
(5000)
0%
200/tower
White tiles
0
/
2500
(2500)
0%
100/tower
Yellow tiles
0
/
1250
(1250)
0%
50/tower
Red tiles
0
/
1250
(1250)
0%
50/tower
Green tiles
0
/
1250
(1250)
0%
50/tower
Bluish tiles
1250
/
1250
(0)
100%
50/tower
Naia
Tar
500
/
500
(0)
100%
20/tower
Fez
block

Tower Raising Materials

Extra material needed for raising the towers after the pump gets upgraded


Tower raising materials, Phase 1 :- Pump at 100ft

Tower Co-ordinates Alt (ft) Target Height(ft) Raise req. Bricks Concrete Cut Stone Pipe Segments
Pump 710,5604 17 100 - - - - -
Tower 1 689,5592 12 95 83 6150 166 125 7
Tower 2 670,5591 11 90 79 5950 158 119 7
Tower 3 649,5591 9 85 76 5800 152 114 7
Tower 4 629,5591 8 80 72 5600 144 108 6
Tower 5 620,5575 18 75 57 4850 114 86 6
Tower 6 659,5557 10 70 60 5000 120 90 6
Tower 7 619,5540 15 65 50 4500 100 75 6
Tower 8 630,5522 33 60 27 3350 54 41 6
Tower 9 620,5505 27 55 28 3400 56 42 6
Tower 10 639,5505 22 50 28 3400 56 42 6
Tower 11 659,5505 33 45 12 2600 24 18 5
Tower 12 680,5505 5 40 35 3750 70 53 6
Tower 13 700,5505 4 35 31 3550 62 47 6
Tower 14 709,5488 7 30 23 3150 46 35 5
Tower 15 700,5470 7 25 18 2900 36 27 5
Tower 16 709,5453 0 20 20 3000 40 30 5
Tower 17 700,5435 7 15 8 2400 16 12 5
Tower 18 690,5418 7 10 3 2150 6 5 5
Tower 19 699,5401 1 5 4 2200 8 6 5
Totals 73700 1428 1075 110


Tower raising materials, Phase 2 :- Pump to 200ft

Tower Co-ordinates Alt (ft) Target Height (ft) Raise req. Bricks Concrete Cut Stone Pipe Segments
Pump 710,5604 17 200 100 30000 1500 500 10
Tower 1 689,5592 12 195 100 7000 200 150 7
Tower 2 670,5591 11 190 100 7000 200 150 7
Tower 3 649,5591 9 185 100 7000 200 150 7
Tower 4 629,5591 8 180 100 7000 200 150 7
Tower 5 620,5575 18 175 100 7000 200 150 7
Tower 6 659,5557 10 170 100 7000 200 150 7
Tower 7 619,5540 15 165 100 7000 200 150 7
Tower 8 630,5522 33 160 100 7000 200 150 7
Tower 9 620,5505 27 155 100 7000 200 150 7
Tower 10 639,5505 22 150 100 7000 200 150 7
Tower 11 659,5505 33 145 100 7000 200 150 7
Tower 12 680,5505 5 140 100 7000 200 150 7
Tower 13 700,5505 4 135 100 7000 200 150 7
Tower 14 709,5488 7 130 100 7000 200 150 7
Tower 15 700,5470 7 125 100 7000 200 150 7
Tower 16 709,5453 0 120 100 7000 200 150 7
Tower 17 700,5435 7 115 100 7000 200 150 7
Tower 18 690,5418 7 110 100 7000 200 150 7
Tower 19 699,5401 1 105 100 7000 200 150 7
Tower 20 690,5383 7 100 93 6650 186 140 7
Tower 21 680,5366 29 95 66 5300 132 99 6
Tower 22 690,5349 7 90 83 6150 166 125 7
Tower 23 700,5331 1 85 84 6200 168 126 7
Tower 24 710,5314 5 80 75 5750 150 113 7
Tower 25 729,5314 4 75 71 5550 142 107 6
Tower 26 750,5315 4 70 66 5300 132 99 6
Tower 27 759,5332 7 65 58 4900 116 87 6
Tower 28 770,5349 7 60 53 4650 106 80 6
Tower 29 760,5332 7 55 48 4400 96 72 6
Tower 30 769,5349 7 50 43 4150 86 65 6
Tower 31 790,5349 25 45 20 3000 40 30 5
Tower 32 800,5367 13 40 27 3350 54 41 6
Tower 33 820,5366 8 35 27 3350 54 41 6
Tower 34 840,5366 18 30 12 2600 24 18 5
Tower 35 860,5366 17 25 8 2400 16 12 5
Tower 36 870,5384 16 20 4 2200 8 6 5
Tower 37 880,5401 1 15 14 2700 28 21 5
Tower 38 870,5418 3 10 7 2350 14 11 5
Tower 39 880,5436 1 5 4 2200 8 6 5
Totals 246150 7026 4649 260


Tower raising materials, Phase 3 :- Pump to 300ft

Tower Co-ordinates Alt (ft) Target Height (ft) Raise req. Bricks Concrete Cut Stone Pipe Segments
Pump 710,5604 17 300 100 50000 2500 734 10
Tower 1 689,5592 12 295 100 7000 200 150 7
Tower 2 670,5591 11 290 100 7000 200 150 7
Tower 3 649,5591 9 285 100 7000 200 150 7
Tower 4 629,5591 8 280 100 7000 200 150 7
Tower 5 620,5575 18 275 100 7000 200 150 7
Tower 6 659,5557 10 270 100 7000 200 150 7
Tower 7 619,5540 15 265 100 7000 200 150 7
Tower 8 630,5522 33 260 100 7000 200 150 7
Tower 9 620,5505 27 255 100 7000 200 150 7
Tower 10 639,5505 22 250 100 7000 200 150 7
Tower 11 659,5505 33 245 100 7000 200 150 7
Tower 12 680,5505 5 240 100 7000 200 150 7
Tower 13 700,5505 4 235 100 7000 200 150 7
Tower 14 709,5488 7 230 100 7000 200 150 7
Tower 15 700,5470 7 225 100 7000 200 150 7
Tower 16 709,5453 0 220 100 7000 200 150 7
Tower 17 700,5435 7 215 100 7000 200 150 7
Tower 18 690,5418 7 210 100 7000 200 150 7
Tower 19 699,5401 1 205 100 7000 200 150 7
Tower 20 690,5383 7 200 100 7000 200 150 7
Tower 21 680,5366 29 195 100 7000 200 150 7
Tower 22 690,5349 7 190 100 7000 200 150 7
Tower 23 700,5331 1 185 100 7000 200 150 7
Tower 24 710,5314 5 180 100 7000 200 150 7
Tower 25 729,5314 4 175 100 7000 200 150 7
Tower 26 750,5315 4 170 100 7000 200 150 7
Tower 27 759,5332 7 165 100 7000 200 150 7
Tower 28 770,5349 7 160 100 7000 200 150 7
Tower 29 760,5332 7 155 100 7000 200 150 7
Tower 30 769,5349 7 150 100 7000 200 150 7
Tower 31 790,5349 25 145 100 7000 200 150 7
Tower 32 800,5367 13 140 100 7000 200 150 7
Tower 33 820,5366 8 135 100 7000 200 150 7
Tower 34 840,5366 18 130 100 7000 200 150 7
Tower 35 860,5366 17 125 100 7000 200 150 7
Tower 36 870,5384 16 120 100 7000 200 150 7
Tower 37 880,5401 1 115 100 7000 200 150 7
Tower 38 870,5418 3 110 100 7000 200 150 7
Tower 39 880,5436 1 105 100 7000 200 150 7
Tower 40 890,5453 16 100 84 6200 168 126 7
Tower 41 910,5453 92 95 3 2150 6 5 5
Tower 42 930,5453 87 90 3 2150 6 5 5
Tower 43 940,5436 55 85 30 3500 60 45 6
Tower 44 950,5418 54 80 26 3300 52 39 6
Tower 45 970,5418 63 75 12 2600 24 18 5
Totals 342900 10616 6822 317


Tower raising materials, Phase 4 :- Pump to 400ft

Tower Co-ordiantes Alt (ft) Target Height (ft) Raise req. Bricks Concrete Cut Stone Pipe Segments
Pump 710,5604 17 400 100 70000 3500 1034 10
Tower 1 689,5592 12 395 100 7000 200 150 7
Tower 2 670,5591 11 390 100 7000 200 150 7
Tower 3 649,5591 9 385 100 7000 200 150 7
Tower 4 629,5591 8 380 100 7000 200 150 7
Tower 5 620,5575 18 375 100 7000 200 150 7
Tower 6 659,5557 10 370 100 7000 200 150 7
Tower 7 619,5540 15 365 100 7000 200 150 7
Tower 8 630,5522 33 360 100 7000 200 150 7
Tower 9 620,5505 27 355 100 7000 200 150 7
Tower 10 639,5505 22 350 100 7000 200 150 7
Tower 11 659,5505 33 345 100 7000 200 150 7
Tower 12 680,5505 5 340 100 7000 200 150 7
Tower 13 700,5505 4 335 100 7000 200 150 7
Tower 14 709,5488 7 330 100 7000 200 150 7
Tower 15 700,5470 7 325 100 7000 200 150 7
Tower 16 709,5453 0 320 100 7000 200 150 7
Tower 17 700,5435 7 315 100 7000 200 150 7
Tower 18 690,5418 7 310 100 7000 200 150 7
Tower 19 699,5401 1 305 100 7000 200 150 7
Tower 20 690,5383 7 300 100 7000 200 150 7
Tower 21 680,5366 29 295 100 7000 200 150 7
Tower 22 690,5349 7 290 100 7000 200 150 7
Tower 23 700,5331 1 285 100 7000 200 150 7
Tower 24 710,5314 5 280 100 7000 200 150 7
Tower 25 729,5314 4 275 100 7000 200 150 7
Tower 26 750,5315 4 270 100 7000 200 150 7
Tower 27 759,5332 7 265 100 7000 200 150 7
Tower 28 770,5349 7 260 100 7000 200 150 7
Tower 29 760,5332 7 255 100 7000 200 150 7
Tower 30 769,5349 7 250 100 7000 200 150 7
Tower 31 790,5349 25 245 100 7000 200 150 7
Tower 32 800,5367 13 240 100 7000 200 150 7
Tower 33 820,5366 8 235 100 7000 200 150 7
Tower 34 840,5366 18 230 100 7000 200 150 7
Tower 35 860,5366 17 225 100 7000 200 150 7
Tower 36 870,5384 16 220 100 7000 200 150 7
Tower 37 880,5401 1 215 100 7000 200 150 7
Tower 38 870,5418 3 210 100 7000 200 150 7
Tower 39 880,5436 1 205 100 7000 200 150 7
Tower 40 890,5453 16 200 100 7000 200 150 7
Tower 41 910,5453 92 195 100 7000 200 150 7
Tower 42 930,5453 87 190 100 7000 200 150 7
Tower 43 940,5436 55 185 100 7000 200 150 7
Tower 44 950,5418 54 180 100 7000 200 150 7
Tower 45 970,5418 63 175 100 7000 200 150 7
Tower 46 990,5418 76 170 94 6700 188 141 7
Tower 47 1000,5436 94 165 71 5550 142 107 6
Tower 48 1020,5436 8 160 152 9600 304 228 8
Tower 49 1040,5436 56 155 99 6950 198 149 7
Tower 50 1060,5436 12 150 138 8900 276 207 8
Tower 51 1080,5436 12 145 133 8650 266 200 8
Tower 52 1100,5436 23 140 117 7850 234 176 7
Tower 53 1090,5453 8 135 127 8350 254 191 8
Tower 54 1100,5470 8 130 122 8100 244 183 7
Tower 55 1090,5488 8 125 117 7850 234 176 7
Tower 56 1080,5505 13 120 107 7350 214 161 7
Tower 57 1090,5523 9 115 106 7300 212 159 7
Tower 58 1080,5540 19 110 91 6550 182 137 7
Tower 59 1090,5557 18 105 87 6350 174 131 7
Tower 60 1110,5557 9 100 91 6550 182 137 7
Totals 497600 15804 10267 433