The Wiki for Tale 5 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Taygete Lifers/mats

From ATITD5
Jump to navigationJump to search

Back to main page


Aqueduct Pump - Completed



Pump raising materials - Currently at 300ft

block
Bricks
0
/
70000
(70000)
0%
Concrete
0
/
3500
(3500)
0%
Cut Stone
0
/
1033
(1033)
0%
Pipe Segments
10
/
10
(0)
100%
Gear Boxes
0
/
20
(20)
0%
block

1 Gearbox B359-B416 H174-H216

1 Gearbox B439-B518 H433-H520

1 Gearbox A196-A239 H380-H456

1 Gearbox B156-B195 G260-G317

1 Gearbox B307-B362 G145-G181

1 Gearbox C426-C528 G202-G238

1 Gearbox C479-C570 F248-F288

1 Gearbox B382-B447 F356-F427

1 Gearbox B427-B525 G429-G519

1 Gearbox C477-C553 H84-H104

1 Gearbox A486-A608 H158-H196

1 Gearbox A135-A166 F309-F380

1 Gearbox A413-A483 G470-G564

1 Gearbox C213-C253 G50-G60

1 Gearbox B80-B100 F119-F145

1 Gearbox B110-B128 G432-G501

1 Gearbox C138-C161 H180-H221

1 Gearbox A471-A556 F26-F32

1 Gearbox C214-C268 H435-H544

1 Gearbox A425-A502 G184-G230


block
Bricks
0
/
90000
(90000)
0%
Concrete
0
/
4500
(4500)
0%
Cut Stone
0
/
1300
(1300)
0%
Pipe Segments
10
/
10
(0)
100%
Gear Boxes
0
/
20
(20)
0%
block




Cistern Upgrades - Current Cistern Size is 500,000 units of water

Our goal is to upgrade the cistern to hold 1 million units of water.

block
Tar
1000
/
1000
(0)
100%
Leather
1500
/
1500
(0)
100%
Canvas
550
/
1250
(700)
44%
Cable
50
/
50
(0)
100%
block
block
Tar
1200
/
1200
(0)
100%
Leather
0
/
1800
(1800)
0%
Canvas
0
/
1500
(1500)
0%
Cable
0
/
60
(60)
0%
block
block
Tar
1400
/
1400
(0)
100%
Leather
0
/
2100
(2100)
0%
Canvas
0
/
1750
(1750)
0%
Cable
0
/
70
(70)
0%
block
block
Tar
1600
/
1600
(0)
100%
Leather
0
/
2400
(2400)
0%
Canvas
0
/
2000
(2000)
0%
Cable
0
/
80
(80)
0%
block
block
Tar
1800
/
1800
(0)
100%
Leather
0
/
2700
(2700)
0%
Canvas
0
/
2250
(2250)
0%
Cable
0
/
90
(90)
0%
block




Water Towers

Materials for the next 25 towers.

block
Cistern
13
/
25
(12)
52%
1/tower
Copper Pipe
125
/
125
(0)
100%
5/tower
Concrete
222
/
2500
(2278)
8%
100/tower
Black tiles
214
/
5000
(4786)
4%
200/tower
White tiles
2500
/
2500
(0)
100%
100/tower
Yellow tiles
1250
/
1250
(0)
100%
50/tower
Red tiles
257
/
1250
(993)
20%
50/tower
Green tiles
2
/
1250
(1248)
0%
50/tower
Bluish tiles
220
/
1250
(1030)
17%
50/tower
Tar
500
/
500
(0)
100%
20/tower
block

Tower Raising Materials

Extra material needed for raising the towers after the pump gets upgraded



block
Bricks
0
/
204450
(204450)
0%
Concrete
0
/
7778
(7778)
0%
Cut Stone
0
/
5835
(5835)
0%
Pipe Segments
0
/
103
(103)
0%
block
block
Bricks
0
/
355150
(355150)
0%
Concrete
0
/
12860
(12860)
0%
Cut Stone
0
/
9369
(9369)
0%
Pipe Segments
0
/
199
(199)
0%
block


Tower raising materials breakdown

Tower raising materials, Phase 3 :- Pump to 300ft

Tower Co-ordinates Alt (ft) Target Height (ft) Raise req. Bricks Concrete Cut Stone Pipe Segments Done
Pump 710,5604 17 300 100 Done
Tower 1 689,5592 12 295 100 5000 200 150 2
Tower 2 670,5591 11 290 100 5000 200 150 2
Tower 3 649,5591 9 285 100 5000 200 150 2
Tower 4 629,5591 8 280 100 5000 200 150 2
Tower 5 620,5575 18 275 100 5000 200 150 2
Tower 6 659,5557 10 270 100 5000 200 150 2
Tower 7 619,5540 15 265 100 5000 200 150 2
Tower 8 630,5522 33 260 100 5000 200 150 2
Tower 9 620,5505 27 255 100 5000 200 150 2
Tower 10 639,5505 22 250 100 5000 200 150 2
Tower 11 659,5505 33 245 100 5000 200 150 2
Tower 12 680,5505 5 240 100 5000 200 150 2
Tower 13 700,5505 4 235 100 5000 200 150 2
Tower 14 709,5488 7 230 100 5000 200 150 2
Tower 15 700,5470 7 225 100 5000 200 150 2
Tower 16 709,5453 0 220 100 5000 200 150 2
Tower 17 700,5435 7 215 100 5000 200 150 2
Tower 18 690,5418 7 210 100 5000 200 150 2
Tower 19 699,5401 1 205 100 5000 200 150 2
Tower 20 690,5383 7 200 100 5000 200 150 2
Tower 21 680,5366 29 195 100 5000 200 150 2
Tower 22 690,5349 7 190 100 5000 200 150 2
Tower 23 700,5331 1 185 100 5000 200 150 2
Tower 24 710,5314 5 180 100 5000 200 150 2
Tower 25 729,5314 4 175 100 5000 200 150 2
Tower 26 750,5315 4 170 100 5000 200 150 2
Tower 27 759,5332 7 165 100 5000 200 150 2
Tower 28 770,5349 7 160 100 5000 200 150 2
Tower 29 790,5349 25 155 100 5000 200 150 2
Tower 30 800,5367 13 150 100 5000 200 150 2
Tower 31 820,5366 8 145 100 5000 200 150 2
Tower 32 840,5366 18 140 100 5000 200 150 2
Tower 33 860,5366 17 135 100 5000 200 150 2
Tower 34 870,5384 16 130 100 5000 200 150 2
Tower 35 880,5401 1 125 100 5000 200 150 2
Tower 36 870,5418 3 120 100 5000 200 150 2
Tower 37 880,5436 1 115 100 5000 200 150 2
Tower 38 900,5436 25 112 87 6350 174 131 7
Tower 39 920,5436 87 107 20 3000 40 30 5
Tower 40 940,5436 55 102 47 4350 94 71 6
Tower 41 960,5436 69 97 28 3400 56 42 6
Tower 42 980,5436 85 92 7 2350 14 11 5
Totals 204450 7778 5835 103

Tower raising materials, Phase 4 :- Pump to 400ft

Tower Co-ordiantes Alt (ft) Target Height (ft) Raise req. Bricks Concrete Cut Stone Pipe Segments Done
Pump 710,5604 17 400
Tower 1 689,5592 12 395 100 5000 200 150 2
Tower 2 670,5591 11 390 100 5000 200 150 2
Tower 3 649,5591 9 385 100 5000 200 150 2
Tower 4 629,5591 8 380 100 5000 200 150 2
Tower 5 620,5575 18 375 100 5000 200 150 2
Tower 6 659,5557 10 370 100 5000 200 150 2
Tower 7 619,5540 15 365 100 5000 200 150 2
Tower 8 630,5522 33 360 100 5000 200 150 2
Tower 9 620,5505 27 355 100 5000 200 150 2
Tower 10 639,5505 22 350 100 5000 200 150 2
Tower 11 659,5505 33 345 100 5000 200 150 2
Tower 12 680,5505 5 340 100 5000 200 150 2
Tower 13 700,5505 4 335 100 5000 200 150 2
Tower 14 709,5488 7 330 100 5000 200 150 2
Tower 15 700,5470 7 325 100 5000 200 150 2
Tower 16 709,5453 0 320 100 5000 200 150 2
Tower 17 700,5435 7 315 100 5000 200 150 2
Tower 18 690,5418 7 310 100 5000 200 150 2
Tower 19 699,5401 1 305 100 5000 200 150 2
Tower 20 690,5383 7 300 100 5000 200 150 2
Tower 21 680,5366 29 295 100 5000 200 150 2
Tower 22 690,5349 7 290 100 5000 200 150 2
Tower 23 700,5331 1 285 100 5000 200 150 2
Tower 24 710,5314 5 280 100 5000 200 150 2
Tower 25 729,5314 4 275 100 5000 200 150 2
Tower 26 750,5315 4 270 100 5000 200 150 2
Tower 27 759,5332 7 265 100 5000 200 150 2
Tower 28 770,5349 7 260 100 5000 200 150 2
Tower 29 790,5349 25 255 100 5000 200 150 2
Tower 30 800,5367 13 250 100 5000 200 150 2
Tower 31 820,5366 8 245 100 5000 200 150 2
Tower 32 840,5366 18 240 100 5000 200 150 2
Tower 33 860,5366 17 235 100 5000 200 150 2
Tower 34 870,5384 16 230 100 5000 200 150 2
Tower 35 880,5401 1 225 100 5000 200 150 2
Tower 36 870,5418 3 220 100 5000 200 150 2
Tower 37 890,5418 7 217 100 5000 200 150 2
Tower 38 900,5436 25 212 100 5000 200 150 2
Tower 39 920,5436 87 207 100 5000 200 150 2
Tower 40 940,5436 55 202 100 5000 200 150 2
Tower 41 960,5436 69 197 100 5000 200 150 2
Tower 42 980,5436 85 192 100 5000 200 150 2
Tower 43 1000,5436 96 187 91 6550 182 137 2
Tower 44 1020,5436 10 182 172 10600 344 258 8
Tower 45 1040,5436 58 177 119 7950 238 179 7
Tower 46 1060,5436 14 172 158 9900 316 237 8
Tower 47 1080,5436 14 167 153 9650 306 230 8
Tower 48 1090,5453 11 162 151 9550 302 227 8
Tower 49 1100,5470 11 157 146 9300 292 219 8
Tower 50 1090,5487 11 152 141 9050 282 212 8
Tower 51 1080,5505 15 147 132 8600 264 198 8
Tower 52 1090,5522 11 142 131 8550 262 197 8
Tower 53 1080,5539 21 137 116 7800 232 174 7
Tower 54 1090,5557 21 132 111 7550 222 167 7
Tower 55 1100,5574 23 127 104 7200 208 156 7
Tower 56 1110,5557 11 122 111 7550 222 167 7
Tower 57 1130,5557 11 117 106 7300 212 159 7
Tower 58 1120,5539 11 112 101 7050 202 152 7
Tower 59 1130,5522 11 107 96 6800 192 144 7
Tower 60 1140,5505 11 102 91 6550 182 137 7
Totals 344150 12860 9369 199