Taygete Lifers/mats

From ATITD5
Jump to navigationJump to search

Back to main page


Aqueduct Pump - Completed



Pump raising materials - Currently at 300ft

block
Bricks
5492
/
70000
(64508)
7%
Concrete
0
/
3500
(3500)
0%
Cut Stone
0
/
1033
(1033)
0%
Pipe Segments
10
/
10
(0)
100%
Gear Boxes
0
/
20
(20)
0%
block

1 Gearbox B359-B416 H174-H216 Done

1 Gearbox B439-B518 H433-H520

1 Gearbox A196-A239 H380-H456

1 Gearbox B156-B195 G260-G317

1 Gearbox B307-B362 G145-G181

1 Gearbox C426-C528 G202-G238

1 Gearbox C479-C570 F248-F288

1 Gearbox B382-B447 F356-F427

1 Gearbox B427-B525 G429-G519

1 Gearbox C477-C553 H84-H104

1 Gearbox A486-A608 H158-H196

1 Gearbox A135-A166 F309-F380

1 Gearbox A413-A483 G470-G564

1 Gearbox C213-C253 G50-G60

1 Gearbox B80-B100 F119-F145

1 Gearbox B110-B128 G432-G501

1 Gearbox C138-C161 H180-H221

1 Gearbox A471-A556 F26-F32

1 Gearbox C214-C268 H435-H544

1 Gearbox A425-A502 G184-G230


block
Bricks
0
/
90000
(90000)
0%
Concrete
0
/
4500
(4500)
0%
Cut Stone
0
/
1300
(1300)
0%
Pipe Segments
10
/
10
(0)
100%
Gear Boxes
0
/
20
(20)
0%
block




Cistern Upgrades - Current Cistern Size is 500,000 units of water

Our goal is to upgrade the cistern to hold 1 million units of water.

block
Tar
1000
/
1000
(0)
100%
Leather
1500
/
1500
(0)
100%
Canvas
1250
/
1250
(0)
100%
Cable
50
/
50
(0)
100%
block
block
Tar
1200
/
1200
(0)
100%
Leather
500
/
1800
(1300)
27%
Canvas
0
/
1500
(1500)
0%
Cable
0
/
60
(60)
0%
block
block
Tar
1400
/
1400
(0)
100%
Leather
0
/
2100
(2100)
0%
Canvas
0
/
1750
(1750)
0%
Cable
0
/
70
(70)
0%
block
block
Tar
1600
/
1600
(0)
100%
Leather
0
/
2400
(2400)
0%
Canvas
0
/
2000
(2000)
0%
Cable
0
/
80
(80)
0%
block
block
Tar
1800
/
1800
(0)
100%
Leather
0
/
2700
(2700)
0%
Canvas
0
/
2250
(2250)
0%
Cable
0
/
90
(90)
0%
block




Water Towers

Materials for the next 25 towers.

block
Cistern
13
/
25
(12)
52%
1/tower
Copper Pipe
125
/
125
(0)
100%
5/tower
Concrete
222
/
2500
(2278)
8%
100/tower
Black tiles
214
/
5000
(4786)
4%
200/tower
White tiles
2500
/
2500
(0)
100%
100/tower
Yellow tiles
1250
/
1250
(0)
100%
50/tower
Red tiles
257
/
1250
(993)
20%
50/tower
Green tiles
2
/
1250
(1248)
0%
50/tower
Bluish tiles
220
/
1250
(1030)
17%
50/tower
Tar
500
/
500
(0)
100%
20/tower
block

Tower Raising Materials

Extra material needed for raising the towers after the pump gets upgraded



block
Bricks
152926
/
204450
(51524)
74%
Concrete
1493
/
7778
(6285)
19%
Cut Stone
317
/
5835
(5518)
5%
Pipe Segments
49
/
103
(54)
47%
block
block
Bricks
0
/
355150
(355150)
0%
Concrete
0
/
12860
(12860)
0%
Cut Stone
0
/
9369
(9369)
0%
Pipe Segments
0
/
199
(199)
0%
block


Tower raising materials breakdown

Tower raising materials, Phase 3 :- Pump to 300ft

Tower Co-ordinates Alt (ft) Target Height (ft) Raise req. Bricks Concrete Cut Stone Pipe Segments Done
Pump 710,5604 17 300 100 Done
Tower 1 689,5592 12 295 100 5000 200 150 2
Tower 2 670,5591 11 290 100 5000 200 150 2
Tower 3 649,5591 9 285 100 5000 200 150 2
Tower 4 629,5591 8 280 100 5000 200 150 2
Tower 5 620,5575 18 275 100 5000 200 150 2
Tower 6 659,5557 10 270 100 5000 200 150 2
Tower 7 619,5540 15 265 100 5000 200 150 2
Tower 8 630,5522 33 260 100 5000 200 150 2
Tower 9 620,5505 27 255 100 5000 200 150 2
Tower 10 639,5505 22 250 100 5000 200 150 2
Tower 11 659,5505 33 245 100 5000 200 150 2
Tower 12 680,5505 5 240 100 5000 200 150 2
Tower 13 700,5505 4 235 100 5000 200 150 2
Tower 14 709,5488 7 230 100 5000 200 150 2
Tower 15 700,5470 7 225 100 5000 200 150 2
Tower 16 709,5453 0 220 100 5000 200 150 2
Tower 17 700,5435 7 215 100 5000 200 150 2
Tower 18 690,5418 7 210 100 5000 200 150 2
Tower 19 699,5401 1 205 100 5000 200 150 2
Tower 20 690,5383 7 200 100 5000 200 150 2
Tower 21 680,5366 29 195 100 5000 200 150 2
Tower 22 690,5349 7 190 100 5000 200 150 2
Tower 23 700,5331 1 185 100 5000 200 150 2
Tower 24 710,5314 5 180 100 5000 200 150 2
Tower 25 729,5314 4 175 100 5000 200 150 2
Tower 26 750,5315 4 170 100 5000 200 150 2
Tower 27 759,5332 7 165 100 5000 200 150 2
Tower 28 770,5349 7 160 100 5000 200 150 2
Tower 29 790,5349 25 155 100 5000 200 150 2
Tower 30 800,5367 13 150 100 5000 200 150 2
Tower 31 820,5366 8 145 100 5000 200 150 2
Tower 32 840,5366 18 140 100 5000 200 150 2
Tower 33 860,5366 17 135 100 5000 200 150 2
Tower 34 870,5384 16 130 100 5000 200 150 2
Tower 35 880,5401 1 125 100 5000 200 150 2
Tower 36 870,5418 3 120 100 5000 200 150 2
Tower 37 880,5436 1 115 100 5000 200 150 2
Tower 38 900,5436 25 112 87 6350 174 131 7
Tower 39 920,5436 87 107 20 3000 40 30 5
Tower 40 940,5436 55 102 47 4350 94 71 6
Tower 41 960,5436 69 97 28 3400 56 42 6
Tower 42 980,5436 85 92 7 2350 14 11 5
Totals 204450 7778 5835 103

Tower raising materials, Phase 4 :- Pump to 400ft

Tower Co-ordiantes Alt (ft) Target Height (ft) Raise req. Bricks Concrete Cut Stone Pipe Segments Done
Pump 710,5604 17 400
Tower 1 689,5592 12 395 100 5000 200 150 2
Tower 2 670,5591 11 390 100 5000 200 150 2
Tower 3 649,5591 9 385 100 5000 200 150 2
Tower 4 629,5591 8 380 100 5000 200 150 2
Tower 5 620,5575 18 375 100 5000 200 150 2
Tower 6 659,5557 10 370 100 5000 200 150 2
Tower 7 619,5540 15 365 100 5000 200 150 2
Tower 8 630,5522 33 360 100 5000 200 150 2
Tower 9 620,5505 27 355 100 5000 200 150 2
Tower 10 639,5505 22 350 100 5000 200 150 2
Tower 11 659,5505 33 345 100 5000 200 150 2
Tower 12 680,5505 5 340 100 5000 200 150 2
Tower 13 700,5505 4 335 100 5000 200 150 2
Tower 14 709,5488 7 330 100 5000 200 150 2
Tower 15 700,5470 7 325 100 5000 200 150 2
Tower 16 709,5453 0 320 100 5000 200 150 2
Tower 17 700,5435 7 315 100 5000 200 150 2
Tower 18 690,5418 7 310 100 5000 200 150 2
Tower 19 699,5401 1 305 100 5000 200 150 2
Tower 20 690,5383 7 300 100 5000 200 150 2
Tower 21 680,5366 29 295 100 5000 200 150 2
Tower 22 690,5349 7 290 100 5000 200 150 2
Tower 23 700,5331 1 285 100 5000 200 150 2
Tower 24 710,5314 5 280 100 5000 200 150 2
Tower 25 729,5314 4 275 100 5000 200 150 2
Tower 26 750,5315 4 270 100 5000 200 150 2
Tower 27 759,5332 7 265 100 5000 200 150 2
Tower 28 770,5349 7 260 100 5000 200 150 2
Tower 29 790,5349 25 255 100 5000 200 150 2
Tower 30 800,5367 13 250 100 5000 200 150 2
Tower 31 820,5366 8 245 100 5000 200 150 2
Tower 32 840,5366 18 240 100 5000 200 150 2
Tower 33 860,5366 17 235 100 5000 200 150 2
Tower 34 870,5384 16 230 100 5000 200 150 2
Tower 35 880,5401 1 225 100 5000 200 150 2
Tower 36 870,5418 3 220 100 5000 200 150 2
Tower 37 890,5418 7 217 100 5000 200 150 2
Tower 38 900,5436 25 212 100 5000 200 150 2
Tower 39 920,5436 87 207 100 5000 200 150 2
Tower 40 940,5436 55 202 100 5000 200 150 2
Tower 41 960,5436 69 197 100 5000 200 150 2
Tower 42 980,5436 85 192 100 5000 200 150 2
Tower 43 1000,5436 96 187 91 6550 182 137 2
Tower 44 1020,5436 10 182 172 10600 344 258 8
Tower 45 1040,5436 58 177 119 7950 238 179 7
Tower 46 1060,5436 14 172 158 9900 316 237 8
Tower 47 1080,5436 14 167 153 9650 306 230 8
Tower 48 1090,5453 11 162 151 9550 302 227 8
Tower 49 1100,5470 11 157 146 9300 292 219 8
Tower 50 1090,5487 11 152 141 9050 282 212 8
Tower 51 1080,5505 15 147 132 8600 264 198 8
Tower 52 1090,5522 11 142 131 8550 262 197 8
Tower 53 1080,5539 21 137 116 7800 232 174 7
Tower 54 1090,5557 21 132 111 7550 222 167 7
Tower 55 1100,5574 23 127 104 7200 208 156 7
Tower 56 1110,5557 11 122 111 7550 222 167 7
Tower 57 1130,5557 11 117 106 7300 212 159 7
Tower 58 1120,5539 11 112 101 7050 202 152 7
Tower 59 1130,5522 11 107 96 6800 192 144 7
Tower 60 1140,5505 11 102 91 6550 182 137 7
Totals 344150 12860 9369 199