Waterworks Engineering Technicians
GH at Sterope 2021 -1980
wh next to GH
There are 18 wh's at the pumpspot = 1444, -1289
Aqueduct Pump Construction
Pump Constructed and raised to 200 ft.
Gearbox A298-A358 F417-F496
Gearbox A245-A306 F34-F40
Gearbox C129-C160 G352-G433
Gearbox C143-C167 H226-H280
Gearbox A495-A594 F457-F562
Gearbox B295-B339 G125-G153
Gearbox A292-A336 G104-G120
Gearbox A470-A569 F46-F53
Gearbox A274-A340 H210-H242
Gearbox A351-A407 H462-H541
Gearbox A381-A450 H91-H108
Gearbox B34-B41 H63-H76
Gearbox C468-C585 H162-H193
Gearbox A246-A295 F105-F129
Gearbox C227-C277 F264-F306
Gearbox A129-A157 G220-G257
Gearbox B49-B61 F335-F389
Gearbox A413-A475 F122-F150
Gearbox A363-A417 F470-F583
Gearbox B461-B530 F170-F201
A newly constructed pump has a cistern that holds 100,000 water. It can be upgraded in increments of 100,000.
Capacity
Tar
Leather
Canvas
Cable
Done
200,000
200
300
250
10
Yes
300,000
400
600
500
20
No
400,000
600
900
750
30
No
500,000
800
1200
1000
40
No
600,000
1000
1500
1250
50
No
700,000
1200
1800
1500
60
No
800,000
1400
2100
1750
70
No
900,000
1600
2400
2000
80
No
1,000,000
1800
2700
2250
90
No
Aqueduct Towers Construction
Note: the below height raise requirements are worst case estimates. Towers built at higher base elevations will be cheaper than the tables indicate.
Ovens Churning for Aquaduct Raeli Tiles
Greenish
CotF - 9 ovens
COMPLETE
Pinkish
CotF - 4 ovens
Augir -1 oven
COMPLETE
Yellowish
CotF - 3 ovens
Augir - 3 ovens
KasumiGhia - 1 oven
White/Black/Any
KasumiGhia - 2 ovens
Augir - 1
Progress Map
Str
Dex
End
Spd
Cabbage
Carrot
Cucumber
Eggplant
Garlic
Con
Foc
Per
Future
Leeks
Onions
Peppers
Watermelon
Multiple
Pump
Proposed tower routes
Proposed
To be built
Building but not finished
Finished
Pump
Tower
Towers marked as "2" and "3" are two alternatives for the start of the line to the chariot. Only one of the two will be built.