Waterworks Engineering Technicians
GH at Sterope 2021 -1980
wh next to GH
There are 18 wh's at the pumpspot = 1444, -1289
Aqueduct Pump Construction
Pump Constructed and raised to 300 ft., Springbox installed, Cistern 400.000
Gearbox C22-C26 F225-F281
Gearbox C361-C430 H423-H512
Gearbox B170-B211 F341-F423
Gearbox C222-C258 G124-G154
Gearbox A164-A194 H235-H282
Gearbox A209-A257 H96-H119
Gearbox B297-B359 H290-H336
Gearbox C72-C87 F334-F418
Gearbox A298-A358 F288-F331
Gearbox A236-A295 G374-G434
Gearbox B411-B493 G144-G171
Gearbox C348-C400 H281-H329
Gearbox B378-B469 F468-F543
Gearbox C304-C380 F213-F245
Gearbox C221-C272 H425-H502
Gearbox B248-B288 F25-F31
Gearbox B76-B88 F271-F333
Gearbox C316-C363 F248-F288
Gearbox C491-C584 F20-F23
Gearbox C132-C158 H172-H203
Capacity
Tar
Leather
Canvas
Cable
Done
200,000
200
300
250
10
Yes
300,000
400
600
500
20
Yes
400,000
600
900
750
30
Yes
500,000
800
1200
1000
40
No
600,000
1000
1500
1250
50
No
700,000
1200
1800
1500
60
No
800,000
1400
2100
1750
70
No
900,000
1600
2400
2000
80
No
1,000,000
1800
2700
2250
90
No
Aqueduct Towers Construction
Note: the below height raise requirements are worst case estimates. Towers built at higher base elevations will be cheaper than the tables indicate.
Progress Map
Str
Dex
End
Spd
Cabbage
Carrot
Cucumber
Eggplant
Garlic
Con
Foc
Per
Future
Leeks
Onions
Peppers
Watermelon
Multiple
Pump
Proposed tower routes
Proposed
To be built
Building but not finished
Finished
Pump
Tower
Towers marked as "2" and "3" are two alternatives for the start of the line to the chariot. Only one of the two will be built.